Friedrich & ClementBETA

Construction of municipal road 180364P - Wiśniowa Street in Śmieszkowie

Budowa drogi gminnej 180364P - ul. Wiśniowej w Śmieszkowie

Poland · Czarnków · how to bid here →

Your path to submission

  1. Deadline: 5 October at 10:00 — 2 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (25 awards, most recently June 2026) — by that rhythm the next award was due around September 2026. The last award went to Zakład Usług Komunalnych Juliusz, Roman Pilarski s.c..n = 25
  • The median procedure drew just one bid (15 procedures with a bid count); 60% ended with a single bidder. Sector: median 5 bids.n = 15
  • 29% of this buyer's awards went to companies that had already won here before (56 awards since 2018, spread over 29 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 56 awards since 2018
  • 5% of awards went to companies from abroad (56 awards with a known winner country). Sector average: 0%.n = 56

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.

Typical field: median 5 (from 4,943 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is a construction work consisting in the construction of the municipal road 180364P Wiśniowa Street in Śmieszków on plots with ewid numbers. 111/3; 111/14; 127/17; 127/19; 129/3; 129/5; 129/6; 154/8 gm. Czarnków area 0022, Śmiekowo. The reconstruction of the road should be carried out in accordance with the technical project developed for the Construction of the municipal road 180364P Wiśniowa Street in Śmieszków. 4. The planned development of Wiśniowa Street was adopted as an access road cat. D with pedestrian-mobile function and traffic category KR-1. Drainage from rainwater and meltwater – surface, to the adjacent area. - situational-height plan. Jezdnia I am designing a roadway for class "D" with a pedestrian-mobile function, a width of 4.50m, asphalt concrete surface with fortified rock sides, a width of 0.5m. Drop of the roof road 2%/2% and 6% on the…

Show full description

… side of the road outside the road. For km 0+000.0 of the planned section, the beginning of the intersection in Wiśniowa Street with Brzozowa Street (Dz.nr 111/14; X=5861004.72; Y=5606304.59). W-1; km 0+014,87, at this point the road axis breaks to the right under the delta = 5,8g. The further designed axis runs in straight lines, breaking down at the following points: W-2; km 0+162.55; delta = 1,0g; to the left; X=5861100.35; Y=5606435.96 W-3; km 0+342.00; delta = 1,5g; to the left; X=5861202.35; Y=5606583.62 W-4; km 0+498.64; to the right; Coordinate point: X=5861294.32; Y=5606710.41 At the above-mentioned points of refraction, due to the small angle values, the use of soothing arcs was abandoned. Refraction W-5 Refraction W-5, when combined with the descent according to the road renovation project No. 1346P Śmieszkowo-Prusinowo (no unambiguous additions) should be adjusted to its actual performance using a soothing arc, with a radius of R= 12.0m. The designed street has two intersections with other streets: in km 0+015.13 with Brzozowa Street (1) in km 0+393.28 with Brzozowa Street (2) The edges of the roadway at the above-mentioned intersections were eased with arches with a radius of r=6.0m. In order to ensure the minimum width of the road gauge for the planned section, at the access to the intersection with ul. Polna (km 0+590,0 ÷km 0+607.0), it was decided to build an existing fence on a concrete plinth (existing agreement between the owner of the fence and the Czarnków Commune). This will eliminate the slope in the road lane and thus ensure a minimum gauge width for the designed section. Location of the main points of the planned section of ul. Cherry is indicated by the coordinates described in the situational plan (sheet 1). The area of the road lane between the side of the road and the boundaries of the road lane will be made by its reclamation and profiling with sowing grass seeds. - longitudinal cross-section Frequent levelling of the roadway ul. Cherry has been adapted to the rows of existing land, adjoining property, significantly avoiding large earthworks and ensuring rainwater and meltwater runoff to the adjacent area. The designed section of the road level has five refractions: Z-1 km 0+235.0; R=2164,39m; concave Z-2 km 0+357.50; R=1644,81m; Convex Z-3 km 0+420.00; R=2180,57m; concave Z-4 km 0+480.00; R= 1065,44m; Convex Z-5 km, should be adjusted to the actual level of the planned exit of the road renovation project No. 1346P Śmieszkowo-Prusinowo (no level projection) and a vertical arc R ≥ 250m should be used. Longitudinal decreases range from i=-8.0% to i=3.67% - normal cross-section of ul. The road is designed with an asphalt concrete surface, a width of 4.5 m with a roof drop of 2% / 2%. Sides on both sides fortified with stone rocks, width 0.5m and drop 6% outside. Complaints with a maximum decrease of 1:1,5. Further terrain to the border of the road lane should be rehabilitated and profiled taking into account the above-mentioned decrease in slopes and sowing grass seeds. In accordance with the agreement between the Czarnków Commune and the owners of plots adjacent to the planned section of ul. Cherry, the exits will be made and financed by the above-mentioned owners, in the places indicated by them and uz

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerGMINA CZARNKÓW
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published21 September 2026
CategoryConstruction work · CPV 45233100-0

Who has won here before

CompanyAwardsPeriod
Zakład Usług Komunalnych Sp. z o.o.92022–2023
BINEK Usługi Transportowe Przewóz Osób Radosław Gieremek42022–2026
Viabud sp. z o.o. sp. k.32022–2026
OGRODO-BRUK MICHAŁ RYŻEK22022
Rejonowy Związek Spółek Wodnych w Czarnkowie z/s w Śmieszkowie22021–2023
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20215
202215
20236
202411
20254
20265

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 5 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →