PRELIMINARY VERIFICATION OF THE TECHNICAL AND ECONOMIC FEASIBILITY PROJECT (PFTE) AND VERIFICATION OF THE EXECUTIVE DESIGN (PE) TO BE CARRIED OUT BY THE CONTRACTOR COMPANY WITHIN THE PROJECT FINANCING FOR THE MANAGEMENT OF PUBLIC LIGHTING SYSTEMS WITH PREPARATION OF THE SAME FOR SMART CITIES SERVICES OF THE MUNICIPALITY OF ACIREALE.
VERIFICA PREVENTIVA PROGETTO DI FATTIBILITÀ TECNICA ED ECONOMICA (PFTE) E VERIFICA DELLA PROGETTAZIONE ESECUTIVA (PE) DA ESEGUIRSI DALL'IMPRESA APPALTATRICE NELL'AMBITO DEL PROJECT FINANCING PER LA GESTIONE DEGLI IMPIANTI DI ILLUMINAZIONE PUBBLICA CON PREDISPOSIZIONE DEGLI STESSI AI SERVIZI DI SMART CITIES DEL COMUNE DI ACIREALE.
Italy · CATANIA · how to bid here →
Your path to submission
- Deadline: 14 September at 00:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew just one bid (289 procedures with a bid count); 78% ended with a single bidder. Sector: median 6 bids.n = 289
- 26% of this buyer's awards went to companies that had already won here before (452 awards since 2021, spread over 327 companies). That is well above the sector norm (14%) — newcomers have a harder time here than elsewhere.n = 452 awards since 2021
- Not one of the 452 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 452
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 11/09/2026.
Foreign bidders
In Italy · Architecture & engineering, 107 contracts went to foreign companies over the last 3 years (of 14,299 recorded awards) — mostly from Germany, France, Spain.
Typical field: median 8 (from 4,220 awards).
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| COMPUNET PRINT S.R.L. | 10 | 2024–2026 |
| ARCOBALENO SRL | 7 | 2025–2026 |
| FG SRL | 5 | 2024–2026 |
| G.T.E. Informatica s.r.l. | 4 | 2025–2026 |
| Dott. Marco Angelo Russo | 4 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.