How to bid in this country: portals, deadlines, thresholds →
Provision of horn tubes for Bam 7/8
Suministro de tubos de bocina para Bam 7/8 — original title
Your path to submission
- Deadline: 13 November at 12:00 — 13 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 7 months (9 awards, most recently July 2026) — the next award is due around February 2027 by that rhythm. The last award went to REMO SPERONI S.R.L.n = 9
- 54% of this buyer's awards went to companies that had already won here before (1,850 awards since 2020, spread over 788 companies). 46% went to new names.n = 1,850 awards since 2020
- The median procedure drew 3 bids (197 procedures with a bid count); 24% ended with a single bidder. Sector: median 2 bids.n = 197
- The award came in at a median 85% of the estimated value (1,313 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 1,313
- 8% of the bids received came from other countries (196 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 196
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Supply of stern tubes for Navantia BAM 7/8 – overview of tender conditions
The input text concerns a public procurement procedure in Spain, launched by Navantia S.A., S.M.E.
(a Spanish state‑controlled public company).
It is a supply contract (“Suministros”) for “Suministro de tubos de bocina para Bam 7/8”.
All data, deadlines and legal references are from the Spanish public procurement context, and the point of view is that of a Spanish contracting authority.
No other countries than Spain are mentioned, except indirectly for “empresas extranjeras” (foreign companies) that must submit to Spanish law.
Firstly, regarding the scope of the contract, the documents describe a supply contract (subtype “Adquisición”, not mixed) for stern tubes for BAM units 7 and 8, divided into two lots: such as “Lote 1. Piezas Fundidas de Tubo Bocina” (cast pieces of stern tube) and “Lote 2. Calderería de Tubo de Bocina” (fabrication/boilerwork of stern tube).
The place of execution is ES612 Cádiz, specifically Cádiz / Puerto Real / San Fernando.
The overall estimated value of the contract is 175,144.18 EUR (excluding taxes), with a base budget of 211,924.46 EUR.
Lot 1 has an estimated value of 70,057.68 EUR (base budget 84,769.79 EUR), and Lot 2 an estimated value of 105,086.50 EUR (base budget 127,154.67 EUR).
The performance period is from 11/12/2026 for 6 months.
Secondly, on what the bidder must submit and minimum qualification requirements, the excerpts show only general admission conditions: such as “Capacidad de obrar”, “No prohibición para contratar”, “No estar incurso en incompatibilidades”, “Cumplimiento con las obligaciones con la Seguridad Social”, “Cumplimiento con las obligaciones tributarias”, and, for foreign companies, a “declaración de sometimiento a la legislación española”.
Show all 26 statements
There is no explicit mention in the text of required forms, specific references, minimum turnover, insurance levels or certificates; these are likely detailed in the “Pliego de Prescripciones Técnicas (PPT)” and the “Pliego de Cláusulas Administrativas (PCP)”, which are referenced but not reproduced in the provided excerpt.
Thirdly, on award criteria and weighting, the documents state that there are “Criterios evaluables mediante un juicio de valor SEGÚN PPT Y PCP: Otros” with a single criterion subtype “Criterio: 100 Ponderación”.
This indicates that the award decision is based on qualitative criteria (not an electronic auction), fully defined in PPT and PCP, and that the total weighting (100%) is assigned to those qualitative aspects.
There is no breakdown between price and quality in the excerpt; price and other elements are presumably governed in detail by the referenced pliegos.
The validity period of the offer is set at 6 months (“Plazo de Validez de la Oferta 6 Mes(es)”).
Fourthly, regarding risks and special conditions, the text explicitly mentions: such as “Subcontratación permitida”, meaning subcontracting is allowed, and “No hay financiación con fondos de la UE”, so there is no EU co‑financing.
The procedure is “Negociado con Publicidad”, with reduction of candidates in successive phases (“Reducción de candidatos en fases sucesivas: Sí”).
Opening of economic offers is internal/private (“Acto interno (no público de apertura de ofertas)” and “Tipo de Acto: Privado”), and there is no electronic auction (“Se adjudicará mediante subasta electrónica: No”).
The deadlines and risks for bidders include: requests to participate and obtaining pliegos until 04/11/2026 at 10:00; submission of offers until 13/11/2026 at 12:00; economic opening on 13/11/2026 at 12:30.
There is no explicit mention of penalties, guarantees, performance bonds or site visits in the excerpt; these will almost certainly be in the PCP and PPT.
Finally, on contradictions or corrections among the documents, the information in the two PDFs (01‑placsp‑4 and 02‑placsp‑7) is substantively identical and repetitive.
The values for each lot and for the total contract, the CPV classifications (43415000 – Moldes de fundición; 14711100 – Fundición en bruto), the execution period (from 11/12/2026 for 6 months), the place of performance (Cádiz / Puerto Real / San Fernando), and all procedural dates (04/11/2026 for participation and pliegos; 13/11/2026 for offers and opening) coincide.
There are no conflicting dates, amounts or conditions in the text provided; where the same information appears more than once, the repeated statement applies consistently.
Any further detail or specific conditions not visible here must be taken from the PPT and PCP referenced by the tender notice.
Only the contracting authority's tender documents are binding. As of: 29/10/2026
Eligibility analysis from the tender documents
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ALTEN SOLUCIONES PRODUCTOS AUDITORIA E INGENIERIA, S.A.U | 26 | 2023–2026 |
| SUMINISTRO Y MANTENIMIENTOS IND SUR SLU | 26 | 2023–2026 |
| Fonsan Gestión y Construcción, S.L | 23 | 2022–2024 |
| ELECTRORAYMA S.L · NARON | 23 | 2023–2026 |
| QUEST GLOBAL ENGINEERING SPAIN SLU | 21 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 519 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 27 (median of 7,300 procedures). A normal window for this market.
Foreign bidders
In Spain · Mining & construction machinery, 1 contract went to a foreign company over the last 3 years (of 2,058 recorded awards).
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now