Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Supply and installation of boiler for heating in temporary warehouse of the integral maintenance base of madrid

Suministro e instalación de caldera para calefacción en almacén provisional de la base de mantenimiento integral de madrid — original title

ESSpain · MadridBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 9 November at 12:00 — 8 days left.
  2. You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The purpose of this technical specification is to establish the technical conditions for the supply/assembly, in turnkey mode, of a modular condensing boiler, which feeds the existing air and duct system in the building called Manufacture in the Integral Maintenance Base of Madrid. The dimensions of the ship are 12 x 100 meters in plant by 6 meters high. The cover is of folded sheet and the sides are of sandwich panel with skirting of 1 meter of height of concrete. The boiler system will be mounted outdoors so it must be supplied with its corresponding protection. NOTE: The environmental conditions to which they will be ...

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeSupplies
Estimated value€48,000
Published27 Oct 2026
Procedureinternal-rules

Type of service

44 · Construction materials
CPV 44620000

Clement What the numbers say about this buyer

  • 92% of this buyer's awards went to companies that had already won here before (14,527 awards since 2021, spread over 959 companies). That is well above the sector norm (62%) — newcomers have a harder time here than elsewhere.n = 14,527 awards since 2021
  • The median procedure drew 2 bids (1,913 procedures with a bid count); 36% ended with a single bidder. Sector: median 3 bids.n = 1,913
  • From notice to award takes a median 102 days here (339 procedures). Sector: 17 days.n = 339
  • The award came in at a median 88% of the estimated value (3,887 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 3,887
  • 64% of the bids received came from small and medium-sized enterprises (1,800 procedures with a bid mix). Sector: 80%.n = 1,800

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Eligibility analysis from the tender documents

Tender documents — direct download

›
Security deposit: 2 5

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
I2M SOLUCIONES TECNICAS S.L. · CIEMPOZUELOS8722024–2026
CASTRO PERERO ROBERTO · VALLADOLID7812024–2026
FAIVELEY TRANSPORT IBERICA, SA6322022–2026
RAILWAY SPARE PARTS S.L. · ALDEAMAYOR DE SAN MARTIN4582024–2026
TEKNIK DESARROLLOS MECANICOS, S.L.4492024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

347
2024
334
2025
233
2026
914 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 9 November at 12:00

Tactics

When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 115 completed awards — not a statement about this procedure.)

This procedure allows 13 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). Much tighter than usual: the first week counts.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Spain · Construction materials, 36 contracts went to foreign companies over the last 3 years (of 29,394 recorded awards) — mostly from France, Italy, Germany.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on PLACSP — Plataforma de Contratación del Sector Público. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via PLACSP — Plataforma de Contratación del Sector Público before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now