How to bid in this country: portals, deadlines, thresholds →
Paving of several streets in Olivenza and its districts
Pavimentación de varias calles en Olivenza y sus pedanías — original title
Your path to submission
- Deadline: 16 November at 14:00 — 15 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 9 months (5 awards, most recently January 2025) — by that rhythm the next award was due around October 2025. The last award went to MOGUER PROYECTOS Y GESTIÓN S.L.n = 5
- 0% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 68%.n = 5
- 20% of this buyer's awards went to companies that had already won here before (51 awards since 2020, spread over 39 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 51 awards since 2020
- The award came in at a median 74% of the estimated value (34 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 34
- The median procedure drew 3 bids (6 procedures with a bid count); 33% ended with a single bidder. Sector: median 3 bids.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Contracting of Asphalt Pavement Works in Olivenza and Pedanías
The input text concerns a public works tender launched by the Junta de Gobierno Local del Ayuntamiento de Olivenza for asphalt paving of streets in Olivenza and its pedanías.
It is clearly situated in Spain, referring to Spanish local authorities, Spanish legislation (Ley 7/1985, Ley 9/2017/Texto Refundido 2015), and the Diputación Provincial de Badajoz.
All information, including procedural rules, contract scope, and bidder requirements, is presented from the Spanish public procurement framework point of view.
The documents define the scope of the contract as “Pavimentación de varias calles en Olivenza y sus pedanías”, with a CPV code 45233222 (Trabajos de pavimentación y asfaltado).
The estimated value is 454.545,45 EUR, with a budget base of licitation of 454.545,45 EUR plus 21% VAT (95.454,55 EUR), totaling 550.000 EUR.
The place of performance is Olivenza (ES431) and its pedanías; the execution period is three months, with no options or prorrogas (maximum number of extensions: 0).
The contracting procedure is “procedimiento abierto, tramitación ordinaria”, electronic submission via the Diputación de Badajoz platform, with offer reception from 20/10/2026 00:01 until 16/11/2026 14:00, and opening of economic offers on 17/11/2026 at 09:00 in Olivenza.
Regarding what bidders must submit and minimum qualification requirements, the text points to the “pliegos de cláusulas administrativas particulares” and “pliego de prescripciones técnicas” for full detail, but it does specify solvency criteria.
Technical-professional solvency requires, such as, a relation of works executed in the last five years, supported by certificates of good execution indicating amount, dates, place, and confirming that works were performed according to professional rules and completed satisfactorily; those certificates may be sent directly by the competent authority to the contracting body.
Economic-financial solvency requires, such as, evidence of annual turnover (overall or in the sector related to the contract) in the best of the last three available financial years, in an amount equal or superior to what is set in the announcement or pliegos or, failing that, the regulatory minimum.
The documents also mention general conditions of admission, such as capacity to act and absence of exclusion grounds in accordance with Spanish national law.
Specific references to forms, insurance, or particular certificates beyond these standard solvency proofs are not detailed in the provided excerpts and would be in the pliegos.
Show all 26 statements
Award criteria are described as “criterios evaluables mediante aplicación de fórmulas”.
The text mentions, such as, a criterion “Mejora: Otros, Subtipo Criterio: 9, Ponderación” and a price criterion “Precio ofertado (IVA excluido): Precio, Subtipo Criterio: 1, Ponderación”.
However, the exact numerical weighting percentages are not shown in the excerpts.
The contract is awarded to the economically most advantageous offer, in line with the Ley de Contratos del Sector Público, and there is explicitly no electronic auction (“Subasta electrónica: No”).
The validity period of the offer is set at two months (“Plazo de Validez de la Oferta 2 Mes(es)”).
Risks and special conditions reflected in the text include, such as, the requirement of a definitive guarantee of 5% of the contract amount.
Subcontracting is permitted “según pliegos”, meaning under conditions and limits set in the administrative clauses.
The contract accepts electronic invoicing but does not use electronic orders or payments.
The decision not to divide the contract into lots is justified for operational efficiency and technical viability, emphasizing continuous coordination of heavy machinery, laying equipment, and bituminous mix to meet tight execution deadlines linked to co-financing by the Plan Avanzamos 2026 of the Diputación de Badajoz.
Penalties, specific guarantees, deadlines for questions, or mandatory site visits are not explicitly detailed in the provided text and would be governed by the pliegos and general Spanish procurement rules.
The place for lodging resources (appeals) is indicated generally as the Ayuntamiento, with observation “Según normativa aplicable”.
As for contradictions or corrections within the documents, the content is largely consistent across the various announcements and the “memoria”: same object (pavement of several streets), amounts (454.545,45 EUR estimated, 550.000 EUR with VAT), execution period (3 months, duration 2026), procedure (open, ordinary), no prórroga, and definitive guarantee of 5%.
One textual peculiarity is the reference to “Texto Refundido de la Ley 9/2015” alongside Ley 9/2017, which reflects how the municipality cites transposition of EU directives; in practice, the applicable regime for the tender is the current Ley de Contratos del Sector Público (Law 9/2017 as referenced at the beginning).
Whenever there is divergence between generic announcements and detailed pliegos, Spanish practice and the text itself (“según pliegos”) indicate that the pliegos de cláusulas administrativas particulares and the pliego de prescripciones técnicas are the binding documents that prevail.
Only the contracting authority's tender documents are binding. As of: 20/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| FERRAM, S.L. MOVIMIENTOS DE TIERRAS · RIBERA DEL FRESNO | 4 | 2023–2025 |
| GUILLERMO SANTOS GONZALEZ | 3 | 2023–2025 |
| LOS ANGELES MATERIALES DE CONSTRUCCION,SL | 3 | 2023–2025 |
| AUTOCARES ÑUCO SL | 2 | 2023–2026 |
| HEURISTIC SOLUTION SL | 2 | 2022–2023 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 17,996 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now