OC-LU-26003; 51.831/26 Reform of intersection N-642 and LU-152. Highway N-642, P.K. 30+400. T.M. Foz. Province of Lugo

OC-LU-26003; 51.831/26 Reforma de la intersección N-642 y LU-152. Carretera N-642, P.K. 30+400. T.M. Foz. Provincia de Lugo — original title

ESSpain · MadridBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 20 November at 15:00 — 20 days left.
  2. You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated value€422,824
Published7 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45233000

Clement What the numbers say about this buyer

  • The median procedure drew 13 bids (1,513 procedures with a bid count); 5% ended with a single bidder. Sector: median 4 bids.n = 1,513
  • In this sector the buyer awards roughly every 2 months (431 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to VILOR INFRAESTRUCTURAS, S.L.n = 431
  • 47% of this buyer's awards went to companies that had already won here before (2,430 awards since 2017, spread over 679 companies). 53% went to new names.n = 2,430 awards since 2017
  • The award came in at a median 80% of the estimated value (1,083 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 1,083
  • 49% of the bids received came from small and medium-sized enterprises (561 procedures with a bid mix). Sector: 68%.n = 561

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Public works tender for road intersection reform in Foz (Lugo, Spain)

The input text concerns a Spanish public procurement procedure for a construction works contract, specifically a road infrastructure project in the municipality of Foz, province of Lugo, Spain.

It is issued by the Ministerio de Transportes y Movilidad Sostenible (Ministry of Transport and Sustainable Mobility) through the Dirección General de Carreteras, so the point of view is that of the Spanish central administration applying the Spanish Public Sector Contracts Law (Ley 9/2017, LCSP).

No other countries are mentioned; references to “ES112”, “ES300” etc. are territorial codes within Spain and to the EU context only to clarify there is no EU co‑financing.

As background, the text sets out the administrative history and legal framework of the contract.

It explains that the project to reform the intersection of the national road N‑642 with the regional road LU‑152 at PK 30+400 in Foz has gone through study order, provisional and definitive approval of the design, and approval of the construction project.

It also clarifies that the contract is processed as a “tramitación anticipada del gasto” under article 117.2 LCSP, meaning the tender and award may occur before the relevant budget year, with the award subject to the existence of adequate and sufficient credit in the 2027 State budget.

The budget is fully allocated to the year 2027, and the execution start is planned for March 2027 with a 4‑month execution period.

Regarding what the bidder must submit and the minimum qualification requirements, the text indicates that offers are to be presented electronically via the Plataforma de Contratación del Sector Público (PLACSP) in two envelopes (sobre 1 – administrativo, sobre 2 – económico).

Sobre 1 must contain “documentación administrativa” as per the Pliego de Cláusulas Administrativas Particulares (PCAP), including such elements as capacity to contract (Capacidad de obrar according to Chapter II, Title II LCSP) and the required company classification “G4‑3 – Con firmes de mezclas bituminosas (superior a 360.000 euros e inferior o igual a 840.000 euros)”.

Furthermore, the text refers to solvency criteria to be detailed in point 8 of the “Cuadro de Características” (not reproduced here): bidders must meet “Otros” criteria of technical‑professional solvency and economic‑financial solvency specified there.

The documents available to bidders include the PCAP, the Pliego de Prescripciones Técnicas (PPT), the OC‑LU‑26003 project file (PDF/XML) and DEUC instructions, implying use of the European Single Procurement Document (DEUC) for standard self‑declarations of suitability and solvency.

Concerning the scope of the contract (what, how much, where, when), the text clearly defines the object as “Reforma de la intersección N‑642 y LU‑152.

Show all 29 statements

Carretera N‑642, P.K. 30+400. T.M. Foz. Provincia de Lugo”.

The works consist basically in transforming the current intersection into a roundabout‑type solution: such as implementing a central deceleration and waiting lane on N‑642 for left turns to LU‑152, a central lane for acceleration and incorporation from LU‑152 to N‑642 toward Foz, a “semiglorieta” at the confluence of LU‑152 with N‑642, and an island to channel right‑turn movements from a nearby access road to N‑642 toward Ribadeo.

Financially, the contract has an estimated value of 422.824,18 € (before VAT), a base tender budget of 511.617,26 € (including 21% VAT), broken down into execution material, general expenses (13%) and industrial profit (6%).

The execution period is 4 months, and the place of performance is the province of Lugo (Subentidad Nacional ES112), with telematic administrative handling from Madrid.

Concerning award criteria and weighting, the procedure is “abierto con varios criterios de adjudicación, todos evaluables mediante fórmulas, ninguno mediante juicio de valor”, justified under LCSP articles 116.4, 131, 145, 149‑152 and 156‑158.

The XML/listing of criteria shows two formula‑based criteria in Sobre 2: such as “Precio” (price) with 90 units and “Incremento de gastos de ensayos” (increase in testing costs) with 10 units.

Although the snippet repeats “Ponderación: 0”, the “Cantidad mínima/máxima” values of 90 and 10 respectively indicate a weighting of 90% for price and 10% for the testing‑cost criterion; the detailed PCAP and its “Cuadro de Características” would clarify the exact scoring formula.

There are no qualitative criteria assessed by value judgment, and all evaluation is automatic based on formulas applied to the economic offer.

On risks and special conditions, the text highlights several important aspects.

Firstly, the contract is subject to guarantees: such as a definitive guarantee of 5% of the contract amount and a complementary guarantee of an additional 5%, as stated under “Garantía requerida definitiva” and “Garantía requerida complementaria”.

Subcontracting is explicitly “permitida”, subject to LCSP rules and PCAP conditions.

The tender is processed as “tramitación anticipada del gasto”, and the PCAP includes a condition suspending adjudication/formalisation until there is adequate budget credit (condition suspensiva), which is a financial‑legal risk for bidders as the award may depend on the approval of the 2027 budget.

Also, the validity period of the offer is 4 months (“Plazo de validez de la oferta 4 Mes(es)”), and the acts of opening offers (administrative envelope on 23/11/2026, economic envelope on 30/11/2026) are private acts held telematically at the Ministry in Madrid.

The text mentions standard recourse possibilities before the Tribunal Administrativo Central de Recursos Contractuales, in line with articles 44 and 50 LCSP; penalties, specific performance conditions, insurance obligations, and site‑visit requirements would be detailed in the PCAP and PPT, but are not spelled out in the excerpt.

No explicit question deadline beyond the general “Plazo de obtención de pliegos” (20/11/2026 15:00) is mentioned in the provided text.

Regarding contradictions or corrections within the documents, the reproduced content is largely consistent: such as identical values for the estimated contract amount, budget, execution period, procedure type, classification requirement, and scheduling of envelope openings across the different PDF/TXT extracts.

Likewise, while one administrative note emphasises “tramitación anticipada” for the expenditure and another listing mentions “Tramitación ordinaria” for the procedure, these are distinct concepts in Spanish procurement: the expenditure is processed in advance (anticipada), whereas the procedure itself is not urgent (“Tramitación del procedimiento: Ordinaria / Urgente”), so both statements are compatible and the PCAP/expediente clarify that the applicable regime is ordinary procedure with anticipated expenditure.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 19/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
OC-LU-26003.pdf
Further document
⤓
OC-LU-26003.xml
Further document
⤓
Instrucciones DEUC.pdf
Further document
›
Security deposit: 2 5

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ALAUDA INGENIERÍA, S.A. · Madrid382017–2025
LRA INFRASTRUCTURES CONSULTING, S.L.322019–2025
Técnica y Proyectos S.A. - TYPSA · San Sebastián de los Reyes292018–2025
WSP SPAIN APIA S.A.292019–2026
TPF GETINSA EUROESTUDIOS SL. · Madrid272017–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2020
1
2022
82
2023
126
2024
191
2025
118
2026
520 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 20 November at 15:00

Tactics

When this buyer has awarded in this sector, usually 13 or more bids came in. Many compete here — price and references decide. (Based on 114 completed awards — not a statement about this procedure.)

This procedure allows 44 days between publication and deadline — typical in this country is 27 (median of 7,300 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,713 recorded awards) — mostly from Portugal, Italy, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on PLACSP — Plataforma de Contratación del Sector Público. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via PLACSP — Plataforma de Contratación del Sector Público before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now