How to bid in this country: portals, deadlines, thresholds →
Works at the Bank of Spain complexes in Barcelona, Cercedilla and Roda de Bará through the establishment of a JDA
Obras en los complejos del Banco de España en Barcelona, Cercedilla y Roda de Bará mediante la constitución de un SDA — original title
Your path to submission
- Deadline for requests to participate: 30 July 2027 at 23:59 — 272 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (90 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to MONTAJES ELECTRICOS VIZCAINO, S.L.n = 90
- 27% of the bids received came from small and medium-sized enterprises (440 procedures with a bid mix). Sector: 68%.n = 440
- 54% of this buyer's awards went to companies that had already won here before (1,727 awards since 2018, spread over 623 companies). 46% went to new names.n = 1,727 awards since 2018
- The median procedure drew 3 bids (754 procedures with a bid count); 26% ended with a single bidder. Sector: median 4 bids.n = 754
- The award came in at a median 83% of the estimated value (683 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 683
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Dynamic System for Construction Works in Banco de España Complexes (LIC-9865)
The input text concerns the restricted tender procedure LIC‑9865 launched by the Banco de España (Spain) for construction works in its complexes in Barcelona, Cercedilla and Roda de Bará, to be awarded through the establishment of a Sistema Dinámico de Adquisición (SDA, Dynamic Purchasing System).
The country point of view is clearly Spanish: the contracting authority is a Spanish public body, the legal references are to Spanish procurement law (LCSP) and EU Directive 2014/24/EU, and the places of performance are in Spain (Barcelona, Cercedilla, Roda de Bará; administrative references ES300 Madrid).
The background is a restricted procedure to create an SDA for “Trabajos de construcción” (CPV 45000000) with three geographic categories/lots.
As such, candidates first submit requests to participate, and then invited bidders submit offers electronically via the PLACSP platform.
The procedure is subject to EU harmonised procurement rules and based on standard works commonly available on the market, with the aim of ensuring competition and transparency.
The total estimated value is 5,960,000 EUR, with a base budget of 3,605,800 EUR (2,980,000 EUR before taxes) for the overall SDA.
Regarding what bidders must submit and minimum qualification requirements, the text refers to a “Sobre Único” (single envelope) containing “Documentación administrativa” per lot (Lotes 1, 2, 3), in accordance with clause 17 of the Pliego de Cláusulas Particulares (PCP).
As such, bidders must provide administrative forms and declarations evidencing: (i) capacity to contract (“Capacidad de obrar” per clause 13 PCP); (ii) absence of national exclusion grounds (prohibitions to contract under article 71 LCSP); (iii) technical-professional solvency (trabajos realizados, and for SMEs, accredited “técnicos o unidades técnicas” per clause 15 PCP); and (iv) economic-financial solvency (annual turnover per clause 15 PCP).
For Lot 3 (Roda de Bará) a specific “clasificación empresarial” is requested: C4‑1 “Albañilería, revocos y revestidos (inferior o igual 150.000 euros)”.
Insurance is not explicitly detailed in the excerpts, but solvency and classification implicitly assume standard insurance and professional coverage under Spanish law.
Concerning the scope of the contract (what, how much, where, when), the object is “Obras en los complejos del Banco de España en Barcelona, Cercedilla y Roda de Bará mediante la constitución de un SDA”, with three lots: Lot 1 “Obras en la sucursal de Barcelona”, Lot 2 “Obras en el complejo de Cercedilla”, Lot 3 “Obras en el complejo de Roda de Bará”.
Show all 27 statements
As such, each category of the SDA will have its specific location and detailed technical requirements described in the Pliego de Prescripciones Técnicas (PPT), though the precise quantities of works are not spelled out in the provided text.
The execution period for derived specific contracts is from 01/08/2025 to 30/07/2027, with up to two possible extensions under clause 7 PCP.
Orders, invoices and payments will generally be electronic (“pedido electrónico”, “factura electrónica”, “pago electrónico”), except that for Lot 3 the text says “Se utilizará el pago electrónico” but also notes in one place that payment electronic will be used; in all, the main rule is the use of electronic tools.
As such, the following criteria appear, each with a points-based weighting and evaluation ranges: (i) “Oferta económica: Precio” – 100 points, evaluated on a scale from 50 to 100 points, making price the most important single criterion; (ii) “Disponibilidad de un instalador autorizado” – 50 points, evaluation range 0–50; (iii) “Presencia del jefe de obra” – 50 points, evaluation range 20–50; (iv) “Mejora del plazo de garantía establecido” – 15 points, evaluation range 0–15; (v) “Reducción en el plazo de ejecución” – 50 points (though in the text, its “Ponderación” is marked 0, which is likely a transcription or formatting issue), evaluation range 50; and (vi) three environmental criteria: “Uso de maquinaria eléctrica”, “Uso de materiales reciclados”, and “Uso de vehículos con etiqueta CERO o ECO”, each worth 15 points with evaluation ranges 0–15.
As such, bidders must structure their technical offer around demonstrating these aspects, particularly price, presence of a dedicated site manager, authorised installer capacity, improved warranty, faster execution, and environmental performance.
As for risks and special conditions, the SDA framework itself implies that once admitted, contractors may receive specific orders over the two‑year period (extendable) and must comply with environmental and training obligations: “Condiciones especiales de ejecución de contrato” include “Consideraciones de tipo medioambiental – Formación sobre asuntos medioambientales” and “Favorecer la formación en el lugar de trabajo (cláusula 8 PCP)”.
The Directiva de Vehículos Limpios does not apply.
Penalties, guarantees and subcontracting rules are not detailed in the text but will be governed by the PCP and LCSP; bidders should assume standard Spanish public‑works provisions on performance guarantees and contractual penalties.
Appeals (“Presentación de recursos TACRC”) can be lodged with the Tribunal Administrativo Central de Recursos Contractuales until 10/07/2025 at 23:59 for the announcement and the tender documents, as indicated.
There is a “sesión informativa” (informative session) on 7 July 2025 at 11:00, held via Microsoft Teams, with participation limited to two connections per bidder; companies must register by email at [email protected] at least 24 hours beforehand.
No physical site visit is expressly mentioned in the supplied text; thus, the informative session is the main formal opportunity to ask questions.
With respect to contradictions or corrections in the documents, there is a discrepancy on the deadline for receipt of requests to participate: some notices state “Hasta el 21/07/2025 a las 14:00” (in the anuncio previo), while others state “Hasta el 24/07/2025 a las 14:00” (in the anuncio de licitación/documento de pliegos).
As such, the later published “Anuncio de licitación” and the tender documentation (Documento de Pliegos, published 25‑06‑2025) should be understood as the operative statement, so the 24/07/2025 deadline applies to requests to participate.
Another apparent inconsistency is the “Ponderación: 0” attached to the “Reducción en el plazo de ejecución” criterion despite its point scale, which likely reflects either a formatting error or a specific weighting rule clarified in clause 18 or similar of the PCP; bidders should verify this directly in the detailed PCP on the PLACSP portal.
Otherwise, the repeated financial and location data across documents align: Lot 2 and Lot 3 amounts and the overall SDA value are consistently presented, and references to electronic ordering, invoicing and payment, plus environmental execution conditions, are stable across the announcement, prior notice and pliegos.
Only the contracting authority's tender documents are binding. As of: 20/10/2026
Eligibility analysis from the tender documents
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Indra Soluciones Tecnológicas de la información S.L. · Madrid | 74 | 2019–2026 |
| ATOS SPAIN, S.A. · Santiago de Compostela | 42 | 2019–2026 |
| ACCENTURE, S.L.U. · MADRID | 29 | 2021–2026 |
| INETUM ESPAÑA, S.A. | 22 | 2019–2025 |
| VIAJES OLYMPIA, S.A. | 20 | 2023–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 11 or more bids came in. Many compete here — price and references decide. (Based on 23 completed awards — not a statement about this procedure.)
This procedure allows 770 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now