How to bid in this country: portals, deadlines, thresholds →
Dynamic Acquisition System (D.A.S.) for works in the APB buildings
Sistema Dinámico de Adquisición (S.D.A.) para las obras en los edificios de la APB — original title
Your path to submission
- Deadline for requests to participate: 19 June 2029 at 23:59 — 962 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (162 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to UTE CONSTRUCCIONES GLESA - THICORCA HERRERÍA Y CONSTRUCCIÓN.n = 162
- The median procedure drew just one bid (915 procedures with a bid count); 63% ended with a single bidder. Sector: median 4 bids.n = 915
- 52% of this buyer's awards went to companies that had already won here before (1,515 awards since 2017, spread over 663 companies). 48% went to new names.n = 1,515 awards since 2017
- The award came in at a median 84% of the estimated value (702 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 702
- < 1% of the bids received came from other countries (220 procedures with a bid mix) — all bidders, not just the winners. Sector: 9%.n = 220
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Dynamic Purchasing System for Building Works of the Port Authority of the Balearic Islands
The input text concerns the establishment of a “Sistema Dinámico de Adquisición (S.D.A.)” for building and civil-engineering type works in the buildings of the Autoridad Portuaria de Baleares (APB), from the Spanish public procurement system’s point of view.
The documentation references Spanish law on public procurement (LCSP), an EU-regulated contract under Directive 2014/24/EU, and a publication in the EU’s Official Journal (DOUE/TED), all centred on a tender run by a Spanish contracting authority located in Palma de Mallorca, Spain.
Such as described in the announcement and the pliegos, the scope of the contract is a dynamic purchasing system with an estimated value of 5,000,000 EUR and a total budget of 6,050,000 EUR (5,000,000 EUR before tax).
It covers works with an individual contract amount (“obra específica”) below 500,000 EUR, to be executed in APB buildings on Mallorca (territorial code ES532).
The execution period for the overall system runs from 16/06/2026 to 19/06/2029, and the system’s validity is explicitly stated as “Hasta el 19/06/2029 a las 23:59”.
Typical works are grouped under CPV codes for refurbishment, sanitation works, repair and maintenance of installations, masonry and bricklaying, specialized construction, building transformation, finishing works, and restoration.
Such as set out under “Requisitos de participación” and “Condiciones de admisión”, bidders must submit a single electronic envelope via PLACSP containing administrative documentation.
This includes: (i) the DEUC (ESPD) proving capacity to contract; (ii) a certificate from the Tesorería General de la Seguridad Social confirming compliance with social security obligations; (iii) a positive certificate from the state tax administration confirming compliance with tax obligations; and (iv) evidence of technical-professional solvency and economic-financial solvency.
Technical solvency must be proven separately for each technical category/CPV and economic subcategory requested, via certificates of good execution for similar works in the last five years, meeting specific minimum cumulative amounts for three subcategories (up to 80,000 EUR PEM; 80,000–200,000 EUR; 200,000–500,000 EUR).
There is an exception for newly created companies (less than five years old) for works under 80,000 EUR, where the historic work requirement does not apply and the alternative accreditation method described in the “Forma de acreditación” section must be used.
Economic solvency requires that the bidder’s best annual turnover in the last three exercises is at least 25% of the maximum specific-contract amount (i.e. ≥125,000 EUR, given the 500,000 EUR cap).
Show all 26 statements
Insurance is not explicitly mentioned in the excerpt; any guarantees or other financial requirements would likely be in the PCAP_SDA26I01-signat.pdf, but are not detailed in the provided text.
Such as noted under “Condiciones de adjudicación”, the award criteria are purely price-based: there are no qualitative formula-based criteria, and the sole criterion is “Precio”, weighted at 100%.
The procedure is restricted (“Procedimiento Restringido”), with electronic submission, and the contracting authority may limit the number of tenderers invited to subsequent specific contracts based on objective criteria in the CCP, with a minimum of five candidates.
Subcontracting is explicitly permitted, and the documents mention social considerations linked to verifying payments to subcontractors and suppliers (art. 217 LCSP).
There is no electronic auction, and no EU co-financing.
Electronic ordering, invoicing and payment are foreseen as conditions of execution and/or licitation, and the tender is not subject to the Clean Vehicles Directive.
Such as indicated in the conditions of execution, there are several special risk-management and compliance obligations.
Environmentally, the contractor must properly manage construction waste and provide delivery notes (albaranes) proving that the waste has been handed to an authorised manager.
Socially, the contractor must comply with art. 217 LCSP regarding verification of payments to subcontractors and suppliers.
A specific operational condition to “combatir el paro” obliges the contractor, in case of unavailability or loss of authorisation of a driver or vehicle/equipment for reasons not attributable to the contracting authority, to provide an equivalent or superior replacement within a maximum of two hours at no additional cost, ensuring continuity of service.
The documents state acceptance of electronic invoices and electronic orders, and a 15-working-day period for lodging appeals after notification of the award.
Deadlines include: participation requests up to 20/07/2026 at 17:00, administrative-envelope opening on 22/07/2026 at 12:00 (private act), and no reference is made to mandatory site visits or a specific question deadline in the provided text extracts.
Such as can be seen from repeated segments, the input text largely reproduces consistent information with no substantive contradictions: the contract type, value, duration, CPVs, award criterion (price 100%), minimum number of candidates (five), dynamic system description, and participation requirements are the same across the “Anuncio de licitación” and the “Documento de Pliegos” references.
Where details are missing (e.g. precise guarantees, penalties), the applicable statements would be those in the PCAP_SDA26I01-signat.pdf and CCP referenced but not fully quoted here; based on the provided text, the applicable statements for your topics are those summarised above.
Only the contracting authority's tender documents are binding. As of: 20/10/2026
Eligibility analysis from the tender documents
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| THICORCA HERRERÍA Y CONSTRUCCIÓN SL | 27 | 2023–2026 |
| SERVEO SERVICIOS, S.A. | 25 | 2018–2026 |
| Servicios Profesionales Submarinos SL | 24 | 2018–2026 |
| ROUTE PONT SL | 18 | 2021–2025 |
| TECNOLOGÍA DE LA CONSTRUCCIÓN Y OBRAS PÚBLICAS, S.A. (TECOPSA) | 17 | 2018–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 12 completed awards — not a statement about this procedure.)
This procedure allows 1099 days between publication and deadline — typical in this country is 27 (median of 7,300 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,713 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now