Repair of the energy supply flood barrier Duisburg
Instandsetzung der Energieversorung Hochwassersperrtor Duisburg — original title
Your path to submission
- Deadline: 26 November at 09:00 — 25 days left.
- You submit on e-Vergabe des Bundes — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The services to be awarded include the renewal of the energy cable between the lock and the flood barrier gate Dbg.-Meiderich. Cables and fibre-optic empty pipes must be installed in manual shafts, some of which must be retracted. Furthermore, cable shafts, various conduits and signal masts must be erected, as well as core drilling, concrete cutting, building introductions, road surface repair and some ancillary work.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (17 awards, most recently July 2026) — by that rhythm the next award was due around October 2026. The last award went to Becker GmbH & Co. KG.n = 17
- The median procedure drew 2 bids (42 procedures with a bid count); 38% ended with a single bidder. Sector: median 4 bids.n = 42
- 41% of this buyer's awards went to companies that had already won here before (42 awards since 2021, spread over 25 companies). 59% went to new names.n = 42 awards since 2021
- The award came in at a median 79% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 13
- From notice to award takes a median 173 days here (8 procedures). Sector: 84 days.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Festmachereigesellschaft Nord-Ostsee-Kanal mbH · Kiel | 5 | 2022–2026 |
| Becker GmbH & Co. KG | 3 | 2026 |
| Meidericher Schiffswerft GmbH & Co. KG · Duisburg | 3 | 2025 |
| Robert Nyblad GmbH · Papenburg | 3 | 2025 |
| HRPI GmbH · Weimar | 3 | 2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 17 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
How to bid
Guide: how to apply on e-Vergabe des Bundes (evergabe-online.de) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now