rekoSUN, BP2 - Bauabschnitt 0 – Neubau Bereitstellungshalle, Gebäude F10
Germany · Nürnberg · how to bid here →
Your path to submission
- Deadline: 12 October at 07:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 1 months (4 awards, most recently February 2026) — by that rhythm the next award was due around April 2026. The last award went to Josef Fösel GmbH.n = 4
- 29% of this buyer's awards went to companies that had already won here before (22 awards since 2024, spread over 16 companies). That is well below the sector norm (41%) — this buyer switches suppliers more often than others.n = 22 awards since 2024
- The median procedure drew just one bid (22 procedures with a bid count); 91% ended with a single bidder. Sector: median 3 bids.n = 22
- Not one of the 22 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 22
- From notice to award takes a median 89 days here (18 procedures). Sector: 73 days.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Germany · Construction work, 649 contracts went to foreign companies over the last 3 years (of 238,564 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 1 (from 4 awards).
What the buyer is looking for
Übergeordnete Baustelleneinrichtung einschl. Verkehrssicherungsmaßnahmen 70 m geschlosserner Bauzaun; 80m offener Bauzaun, Baustrom- und Bauwasseranschlüsse Herstellen 72 m2 gebohrten Trägerbohlverbau mit 20 Stck 4,85m Verbauträgern 800 m3 Erdarbeiten / Bodenaustausch, Rohbauarbeiten Ortbeton; 30m3 Einzel- und Streifenfundamente, 15m3 Bodenplatten, 140m3 Innen-und Außenwände + Stützen, 25m3 Unterzüge mit oberseitigen Gefälle, umlaufende Attikaausbildung tragende Dachfläche mit Trapezblech auf umlaufenden Auflagerwinkel Rohbauarbeiten mit Erdungs- und Blitzschutzleistung 120 m Rohrleitungen bis DN200 einschl. Rohrgräben für Entwässerung Regenwasser Erdarbeiten und Herstellung Tunnelrigole einschl. der Schächte
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| HELM AG · Hamburg | 3 | 2025–2026 |
| john becker ingenieure GmbH & Co. KG | 2 | 2025–2026 |
| Assmann GmbH | 2 | 2024–2026 |
| Sidra Wasserchemie GmbH | 2 | 2024–2025 |
| MAN Truck & Bus Deutschland GmbH | 2 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.