Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Designation of a surveyor as part of the conversion of the Chertal industrial site

Désignation d'un géomètre dans le cadre de la reconversion du site industriel de Chertal — original title

BEBelgiumBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 10 November at 11:00 — 9 days left.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Le présent marché a pour objet la désignation d'un géomètre chargé de réaliser les prestations décrites dans le présent cahier des charges dans le cadre de la reconversion du site industriel de « Chertal », situé sur les communes de HERSTAL et OUPEYE. Le périmètre de la mission correspond à l'ensemble du site repris au plan et au tableau parcellaire annexés. Le plan annexé précise les limites du périmètre, les parcelles cadastrales concernées, les accès autorisés ainsi que les principaux propriétaires connus. Le site est propriété de SORECHER SA. Spi est également propriétaire de deux petites emprises en bordure de la propriété SORECHER ; elles sont à intégrer au site à investiguer. La SORASI intervient en qualité de prestataire de services pour le compte de SORECHER SA. Le site est bordé par la Meuse et le Canal Albert et couvre approximativement 189 hectares. Le site est accessible par…

Show full description

… le Pont de Wandre et est traversé par la E40/42. Le site fait l’objet d’opérations de démantèlement en exécution d’un permis délivré le 29 juillet 2021. Ces opérations sont effectuées par l’entreprise WANTY et devraient se finaliser à l’automne 2026. L’extrait de l’acte d’acquisition de SORECHER avec les parcelles cadastrales, la copie du permis de démantèlement ou l’extrait des pages pertinentes (description des interventions à réaliser, par Wanty), la copie de l’état des lieux d’entrée établi and prévision des opérations de démantèlement de WANTY et les documents cadastraux sont fournis à titre informatif. Le géomètre vérifiera leur cohérence avec la situation observée sur le terrain. À l'issue des travaux de démantèlement réalisés par l'entreprise WANTY, un plan reprenant le levé des interventions effectuées est joint. Ce plan de levé contient notamment : le périmètre des bâtiments démolis, des bâtiments maintenus, le tracé des voiries existantes, l’emplacement de certaines citernes enterrées ou toute autre information susceptible de traduire les actes et travaux réalisés. Ce document constitue une base de travail que le géomètre devra compléter et vérifier au regard des constats de terrain. Toute incohérence importante devra être signalée à la SORASI. La SORASI cherche à s’entourer de l’expertise d’un géomètre en vue de réaliser : - Tranche 1 (ferme): mission fouillée de levé général ; - Tranche 2 (optional): mission de compléments and régie ; - Tranche 3 (optional): mission de contre-expertise d’implantation en régie.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published8 Oct 2026
ProcedureOpen procedure

Type of service

71 · Architecture & engineering
CPV 71353000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 5 months (12 awards, most recently August 2026) — the next award is due around February 2027 by that rhythm. The last award went to SGS BELGIUM SA.n = 12
  • 0% of this buyer's awards went to companies that had already won here before (43 awards since 2015, spread over 22 companies). 100% went to new names.n = 43 awards since 2015
  • The median procedure drew 5 bids (40 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 40
  • Across 3 procedures with structured selection criteria, this buyer most often required: References: services (3 of 3), Average minimum annual turnover (3 of 3).n = 3
  • 14% of awards went to companies from abroad (43 awards with a known winner country). Sector average: 16%.n = 43

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
GEOLYS12025
ARCADIS Belgium SA---BIEMAR & BIEMAR12022
SM NELLES - AERTSSEN INFRA NV - AERTSSEN INFRA SUD SA12025
Aries Consultants sa12026
ARCADIS Belgium SA12024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2022
23
2024
23
2025
22
2026
69 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Tuesday 10 November at 11:00

Tactics

When this buyer has awarded in this sector, usually 10 or more bids came in. Many compete here — price and references decide. (Based on 11 completed awards — not a statement about this procedure.)

This procedure allows 33 days between publication and deadline — typical in this country is 34 (median of 3,181 procedures). A normal window for this market.

Foreign bidders

In Belgium · Architecture & engineering, 280 contracts went to foreign companies over the last 3 years (of 2,188 recorded awards) — mostly from France, Germany, Netherlands.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on BDA / e-Procurement Belgium. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BDA / e-Procurement Belgium before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now