Väylävirasto
Finland · 54 open tenders · 1,787 documented awards
Current tenders
Kiehimänjoen railway bridge; Paltamo, railway plan preparation
Deadline 5 Oct ·
Kiehimänjoki railway bridge; Paltamo, drawing up a railway plan
Deadline 5 Oct ·
Management and maintenance of locks and lifting bridges on the Pielisjoki route 2027 - 2031
Deadline 6 Oct ·
Maintenance and Operation of Canals and Openable Bridges on the Pielis River Route 2027 - 2031
Deadline 6 Oct ·
Operation and maintenance of locks and openable bridges on the Pielis River route 2027 - 2031
Deadline 6 Oct ·
Operation and maintenance of canals and opening bridges on the Pielinen River route 2027 - 2031
Deadline 6 Oct ·
Call for Participation Liminka-Oulu Double Track, Oulunlahti Grade Separation Bridge
Deadline 8 Oct ·
Request to participate Liminka-Oulu double track, Oulunlahti overpass
Deadline 8 Oct ·
Laajoen and Mynäjoen railroad bridges, construction planning
Deadline 9 Oct ·
Laajoen and Mynäjoen railway bridges, construction planning
Deadline 9 Oct ·
HERI2 Soil investigations framework agreement 2026-2030
3.000.000 €Deadline 12 Oct ·
VÄYLÄ/4675/Vv-02.01.02/2026; Renovation of Boom Turning Equipment 2026 - 2028 (Application for Participation)
Deadline 12 Oct ·
HERI2 Soil investigations framework agreement 2026-2030
3.000.000 €Deadline 12 Oct ·
VÄYLÄ/4675/Vv-02.01.02/2026; Renovation of Boom Turning Equipment 2026 - 2028 (Application for Participation)
Deadline 12 Oct ·
Call for Participation, Liminka-Oulu Double Track, Construction Planning Liminka-Kempele
Deadline 12 Oct ·
Call for Participation, Liminka-Oulu double track, construction planning Liminka-Kempele
Deadline 12 Oct ·
Operation and maintenance of Taipale and Konnuksen canals and Savonlinna opening bridges 2027-2031
Deadline 15 Oct ·
Operation and Maintenance of Taipaleen and Konnus Canals and Savonlinna Opening Bridges 2027 - 2031
Deadline 15 Oct ·
Construction of reindeer protection fences 2027-2029
2.000.000 €Deadline 16 Oct ·
Construction of Radan protective fences 2027-2029
2.000.000 €Deadline 16 Oct ·
Call for Participation: Improvement of Highway 8 in Kokkola City Centre; KU
Deadline 16 Oct ·
Participation Request: Improvement of Highway 8 Kokolan City Centre; KU
Deadline 16 Oct ·
Bottom surveys of the Vaasa fairway 2026
Deadline 19 Oct ·
HERI2 Automatic monitoring devices for railway structures
1.600.000 €Deadline 19 Oct ·
HERI2 Automatic monitoring devices for railway structures
1.600.000 €Deadline 19 Oct ·
Grounding studies of the Vaasa maritime fairway 2026
Deadline 19 Oct ·
Invitation to market dialogue: Framework agreement on expert services in road maintenance
BELOW THRESHOLDDeadline 21 Oct ·
Arolammin raw wood loading site, general plan
250.000 €Deadline 22 Oct ·
Arolammin raakapuun kuormauspaikka, yleissuunnitelma
250.000 €Deadline 22 Oct ·
Operation and Maintenance of Taipale and Konnuksen Canals and Savonlinna Movable Bridges 2027 - 2031
Deadline 26 Oct ·
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
201966
2020476
2021560
2022418
2023490
2024589
2025674
2026506
Clement What the numbers say about this buyer
- 73% of this buyer's awards went to companies that had already won here before (1,942 awards since 2018, spread over 364 companies). That is well above the national norm (38%) — newcomers have a harder time here than elsewhere.n = 1,942 awards since 2018
- 20% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Country: 67%.n = 9
- The median procedure drew 4 bids (1,319 procedures with a bid count); 13% ended with a single bidder. Country: median 4.3 bids.n = 1,319
- The award came in at a median 83% of the estimated value (48 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 87%.n = 48
- 0% of the bids received came from other countries (9 procedures with a bid mix) — all bidders, not just the winners. Country: 5%.n = 9
- 5% of awards went to companies from abroad (1,942 awards with a known winner country). National average: 6%.n = 1,942
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Expected next awards
From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 25% of 9,975 closed expectation windows produced a notice.
- Sept 2026R&D services
about every 3 months · 37 awards · last Jun 2026 to Tampereen Yliopisto - Oct 2026Business services
about every 3 months · 47 awards · last Jul 2026 to Lingsoft Language Services Oy - Nov 2026Architecture & engineering
about every 1 months · 580 awards · last Sept 2026 to AFRY Finland Oy (FI06259056)//FINNMAP Infra Oy (0921976-2)//Sweco Finland Oy (2661738-3)//WSP Finland Oy (0875416-5)//A-Insinöörit Suunnittelu Oy (0211382-6)//Sitowise Oy - Nov 2026Construction work
about every 1 months · 384 awards · last Oct 2026 to Sundström Infra Ab Oy - Nov 2026IT services
about every 2 months · 153 awards · last Oct 2026 to Infrakit Group Oy - Nov 2026Repair & maintenance
about every 2 months · 111 awards · last Sept 2026 to NRC Group Finland Oy - Dec 2026Transport equipment
about every 3 months · 48 awards · last Sept 2026 to Veho Oy Ab Erikoisajoneuvot - Apr 2027Education & training
about every 11 months · 7 awards · last May 2026 to Kisco Oy
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Welado Oy · OULU | 72 | 2019–2026 |
| Proxion Plan Oy (FI22615698)//NRC Group Finland Oy | 72 | 2018–2026 |
| GRK Rail Oy | 61 | 2020–2026 |
| Ramboll CM Oy · ESBO | 54 | 2019–2026 |
| Kreate Oy | 54 | 2019–2026 |
| Taratest Oy | 42 | 2019–2026 |
| Sundström Ab, Oy Entreprenad | 41 | 2019–2026 |
| NRC Group Finland Oy | 39 | 2020–2026 |
| Siemens Mobility Oy | 38 | 2020–2026 |
| Destia Rail Oy | 38 | 2019–2025 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.