Thüga AG
Germany · 28 open tenders · 229 documented awards
Current tenders
Medium Power Transformations
Deadline 30 Dec ·
E-Spool_up_to_123kV
Deadline 30 Dec ·
Grounding Transformers up to 36kV
Deadline 30 Dec ·
123kV Disconnecting and Earthing Switch
Deadline 30 Dec ·
Cable protection tubes - PVC
Deadline 30 Dec ·
Steel Applications: Isolation Gate Valves DP up to 16 bar and over 16 bar
Deadline 30 Dec ·
Protective Equipment and Station Automation Systems
Deadline 30 Dec ·
Cable protection tubes - PE-HD
Deadline 30 Dec ·
HFW longitudinally seam-welded steel pipe tubes
Deadline 30 Dec ·
123kV Measuring Transformer
Deadline 30 Dec ·
Erdungstransformatoren_bis_36kV
Deadline 31 Dec ·
Protection Equipment and Station Automation Systems
Deadline 31 Dec ·
Steel Applications: Isolation Ball Valves DP up to 16 bar and over 16 bar
Deadline 31 Dec ·
123kV Messwandler
Deadline 31 Dec ·
HFW - Long Seam Welded Steel Line Pipes
Deadline 31 Dec ·
Cable protection tubes - PE-HD
Deadline 31 Dec ·
Cable protection tubes - PVC
Deadline 31 Dec ·
E-Spool up to 123kV
Deadline 31 Dec ·
123kV Isolation and Grounding Switches
Deadline 31 Dec ·
Medium-voltage switchgear up to 36 kV - air-insulated - metal-enclosed -
Deadline 30 Jun ·
Switch disconnector systems up to 36 kV - air-insulated - metal-enclosed -
Deadline 30 Jun ·
Leistungsschalteranlagen bis 36 kV - luftisoliert - metallgekapselt -
Deadline 30 Jun ·
Gas Pipe Network Inspection
Deadline 30 Dec ·
Pipe fittings and tapping valves
Deadline 30 Dec ·
Gas Rohrnetzüberprüfung
Deadline 31 Dec ·
Formstücke und Anbohrarmaturen
Deadline 31 Dec ·
Deodorant
Deadline 31 Dec ·
Germany – Chemical Specialty Products – Odorants
Deadline 31 Dec ·
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
201810
201940
202053
202141
20225
202333
2024176
202514
202632
Clement What the numbers say about this buyer
- The median procedure drew 10 bids (12 procedures with a bid count); 8% ended with a single bidder. Country: median 3.1 bids.n = 12
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2018, spread over 14 companies). That is well below the national norm (45%) — this buyer switches suppliers more often than others.n = 14 awards since 2018
- Across 5 procedures with structured selection criteria, this buyer most often required: Quality management (4 of 5), Independent quality certificate (e.g. ISO 9001) (3 of 5), Quality control by institutes (2 of 5).n = 5
- Not one of the 14 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ABB AG · Mannheim | 8 | 2010–2017 |
| Philips GmbH | 7 | 2011–2015 |
| Nexans Deutschland GmbH · Hannover | 6 | 2010–2013 |
| Siteco Beleuchtungstechnik GmbH · Traunreut | 5 | 2011–2015 |
| Siemens AG | 5 | 2011–2017 |
| Prysmian Kabel und Systeme GmbH · Berlin | 4 | 2013–2016 |
| Bechtle GmbH | 4 | 2011–2018 |
| Schneider Electric GmbH · Ratingen | 4 | 2014–2017 |
| TELE-FONIKA Kable Sp. z o.o. S.K.A. · 30-663 PL | 4 | 2013–2016 |
| Frank GmbH · Mörfelden-Walldorf | 4 | 2008–2011 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.