How to bid in this country: portals, deadlines, thresholds →
Secondary school of shipping and technical crafts Děčín – reconstruction of buildings in the Křešice area, including a complete change of heating of the entire area - PD + ID + DP
SŠ lodní dopravy a technických řemesel Děčín – rekonstrukce objektů v areálu Křešice včetně kompletní změny vytápění celého areálu - PD + IČ + DP — original title
Your path to submission
- Deadline: 19 November at 10:00 — 18 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Slovak, Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the public contract is the execution of design works (PD), engineering activities (IČ), supervision of the designer (DP) and cooperation in the selection of the contractor. The subject of performance is the processing of project documentation in two separate stages. Each stage will be processed as a separate project documentation with its own budget. Implementation will also include the preparation of a single general budget covering both stages. 1st stage – Reconstruction of the main building of the school and related infrastructure The project documentation will deal with building modifications of the main building on the school premises and related infrastructure, in particular: • insulation of the outer shell of the main building, including the design of a new facade, • replacement of external windowsills, • replacement of the roof cladding, • insulation of the attic…
Show full description
… space, • design and implementation of the elevator to ensure barrier-free access to the building, • construction modifications related to the installation of the elevator, • implementation of remediation walls in the basement premises of the building in order to reduce the negative effects of ground moisture and leakage, • design of rainwater sewer repair, including the elimination of the causes of rainwater penetration into the building, • repair of roads, pavements and paved areas affected by the construction, • repair of the fencing of the area in front of the building along the road, including the solution of the exit from the premises to the adjacent road. 2nd stage – Reconstruction of the object of vocational training and physical education The project documentation will deal with a complex reconstruction of a two-storey building used for teaching vocational training and physical education of school pupils, including modernization of technical facilities and modifications related to the expansion of educational capacities. The scope of the project work will include in particular: • complete repair and replacement of the sports decking in the gym, • renewal and modernization of the sports facilities of the gym, • expansion of the building with a grandstand for watching sports and social events (2 rows of seats), • complete reconstruction of the social facilities of the building, • replacement of the remaining original windows and luxfer, • comprehensive modernization of all technical facilities of the building (TZB), especially electrical installation, lighting, heating, medical technical installations, sewerage, air conditioning and related distribution, • construction modifications and modernization of professional workshops for teaching the field of Plumber, • construction of a new facility for the field of masonry work, including the necessary technical and operational equipment, • construction of an outdoor shelter with a paved area for practical training in the field of masonry work, • repair of the building facade, • replacement of the roof covering, • design of measures leading to reduce the energy performance of the building, • solution of barrier-free use of the building to the extent required by the applicable legal regulations, • design of a change in the heating system of the entire area, including related construction and technical modifications, • related construction and technical modifications necessary to ensure safe, economic and efficient operation of the building. • proposal to change the heating system of the entire complex and related construction work. Within the scope of the subject of performance, the method of creating an open structured database of building information modeling (hereinafter referred to as ‘BIM’) according to the annex to this contract ‘Digitalisation and BIM requirements’ will be used, in particular the processing of the digital building model (DIMS) in the stages ‘Documentation for project permitting’ and ‘Documentation for construction implementation’, the use of the Common Data Environment (hereinafter referred to as ‘CDE’) and the processing of the BIM Implementation Plan (BEP). The Contractor is obliged to use the Common Data Environment (CDE) and comply with the BIM requirements set out in the Contract and its annexes if it is part of the subject of performance.
Contract
Type of service
Clement What the numbers say about this buyer
- 11% of this buyer's awards went to companies that had already won here before (404 awards since 2015, spread over 120 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 404 awards since 2015
- In this sector the buyer awards roughly every 2 months (32 awards, most recently April 2026) — by that rhythm the next award was due around July 2026. The last award went to SATRA,spol.s r.o.n = 32
- The median procedure drew 3 bids (286 procedures with a bid count); 36% ended with a single bidder. Sector: median 4 bids.n = 286
- 19% of awards went to companies from abroad (404 awards with a known winner country). Sector average: 8%.n = 404
- The award came in at a median 74% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 24
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Český svaz ochránců přírody Krušnohoří | 5 | 2025–2026 |
| KHL-EKO, a.s. | 4 | 2025–2026 |
| HAGL, spol. s r.o. | 4 | 2025–2026 |
| Tomáš Podroužek | 4 | 2025–2026 |
| VR servise trades s.r.o. | 4 | 2025–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 22 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Czechia · Architecture & engineering, 456 contracts went to foreign companies over the last 3 years (of 16,225 recorded awards) — mostly from Germany, France, Austria.
Submission language: Slovak, Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now