How to bid in this country: portals, deadlines, thresholds →
Drinking water supply in the area of the Slovenian Istrian and Karst hinterland: development of municipal infrastructure and reduction of water losses
Oskrba s pitno vodo na območju slovenske istre in kraškega zaledja: Ureditev komunalne infrastrukture in zmanjševanje vodnih izgub v planini ii. Faza — original title
Your path to submission
- Deadline: 16 November at 10:00 — 15 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Slovenian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject of the public contract is the construction of a sewage network with all the necessary facilities in the Planina area (Phase 2). Construction is carried out in accordance with the contractual provisions of FIDIC (Red Book). The project covers: 1. 900 PE treatment plant with exterior layout and access road 2. Gravity sewerage (3968 m) 3. Pressure sewerage with pumping station (118 m) 4. Meteor sewerage (2496 m) 5. Plumbing (1998 m) 6. Resurfacing of the canals of Regional Road 7. Resurfacing of local roads 8. Fecal connectors 9. Meteor connections (road esophagus) 10. Plumbing connections 11. Electrical connection for pumping station 6 12. KBV 20kV Planina 13. TP 20/0.4 kV Snake village 14. TP 20/0.4 kV Planina šola Type, characteristics, quality and description of the subject of the public contract are defined in the contract specification - project documentation for the…
Show full description
… construction (PZI) ‘Construction of a sewage network with all the necessary facilities in the area of Planina’ (project No 17/58, February 2025, Detajl infrastruktura d.o.o.), which is an integral part of this procurement documentation. The contracting authority expects the successful tenderer to carry out the subject of the public contract professionally, responsibly and up-to-date, including the daily presence of the works manager, so it included in the model contract individual contractual penalties for certain delays and for the absence of the works manager.
Contract
Type of service
Clement What the numbers say about this buyer
- 11% of this buyer's awards went to companies that had already won here before (54 awards since 2018, spread over 16 companies). That is well below the sector norm (61%) — this buyer switches suppliers more often than others.n = 54 awards since 2018
- 93% of the bids received came from small and medium-sized enterprises (22 procedures with a bid mix). Sector: 49%.n = 22
- The median procedure drew just one bid (48 procedures with a bid count); 56% ended with a single bidder. Sector: median 3 bids.n = 48
- The award came in at a median 98% of the estimated value (14 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 81%.n = 14
- 13% of awards went to companies from abroad (54 awards with a known winner country). Sector average: 5%.n = 54
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovenian.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| WEBO.SI zaščitna oprema in ekologija d.o.o. | 4 | 2024–2026 |
| PROTIM RŽIŠNIK PERC arhitekti in inženirji d.o.o. | 2 | 2026 |
| MM IBIS, informacijske tehnologije, d.o.o. | 2 | 2026 |
| RAVNIKAR POTOKAR arhitekturni biro d.o.o. | 2 | 2024 |
| ARBA PLUS proizvodnja, trgovina in storitve, d.o.o. | 1 | 2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 18 days between publication and deadline — typical in this country is 31 (median of 368 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Slovenia · Construction work, 11 contracts went to foreign companies over the last 3 years (of 1,442 recorded awards).
Submission language: Slovenian.
How to bid
Don't miss the next one