How to bid in this country: portals, deadlines, thresholds →
Construction of the Chmielnik ring road within DK 73 and DK 78 section Dutch - Chmielnik
Budowa obwodnicy Chmielnika w ciągu DK 73 i DK 78 odc. Holendry - Chmielnik — original title
Your path to submission
- Deadline: 25 November at 09:00 — 24 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The investment is located in the Świętokrzyskie Voivodship, Kielce County, in the City and Commune of Chmielnik. The planned investment starts in km 4+300 on national road No. 78 in km approx. 227+975, then in a south-easterly direction. The end of the planned bypass is located in km approx. 43+600 DK No 73. The route of the proposed variant runs on flat and wavy terrain. The implementation of the above-mentioned section of the road will enable transit traffic to be carried out bypassing dense buildings located along the existing road. The construction of the Chmielnik bypass, engineering facilities, including animal crossings, carriageways additional to the service of adjacent areas will improve traffic conditions and increase the level of road safety. The material scope of the task includes: • construction of a section of the main road of the GP class accelerated traffic, following a…
Show full description
… new trace - the bypass of the town of Chmielnik; • construction of 2 engineering structures: - 1 lower passage for small animals PZM-10 with a length of approx. 17m, horizontal light approx. 1.5m, relative narrowness factor ≥ 0.09, - 1 lower passage for small animals PZDs-11 with a length of approx. 17m, horizontal light approx. 6,0m, vertical light approx. 3,5m, relative narrowness factor ≥ 1,25, • reconstruction of existing roads intersecting with the built main highway of accelerated traffic; • construction of additional carriageways/other public roads to serve the adjacent area; • construction of traffic safety devices; • construction of pavements; • construction of a drainage system, including: retention and evaporation tanks, • construction of 1 vehicle inspection and weighing site, • construction and reconstruction of technical infrastructure related and not related to the road, including technological channels, and necessary for the implementation of the investment, • Traffic Management System, in the scope of: technological channels, traffic management system concepts, detour management, meteorological data acquisition, etc. Contract value over €20 million
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (319 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to Budimex S.A.n = 319
- 33% of this buyer's awards went to companies that had already won here before (1,302 awards since 2015, spread over 737 companies). 67% went to new names.n = 1,302 awards since 2015
- The median procedure drew 4 bids (967 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 967
- The award came in at a median 85% of the estimated value (116 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 116
- 5% of awards went to companies from abroad (1,302 awards with a known winner country). Sector average: 0%.n = 1,302
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.
What you must prove — eligibility criteria
Średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „Przychód netto ze sprzedaży produktów, towarów i materiałów” lub „Przychód netto ze sprze… read in fullcollapse
Posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 10 000 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych „środków finansowych/zdolności kredyt… read in fullcollapse
Wykonawca musi wykazać się wiedzą i doświadczeniem, w wykonaniu (zakończeniu) w okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, co najmniej: 1 zadania polegającego na budowie… read in fullcollapse
Wykonawca musi wskazać osobę, która będzie uczestniczyć w wykonywaniu zamówienia, legitymującą się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jaka zostanie jej powierzona. Wykonawca, na funkcję wymienioną poniżej, wskaże osobę, którą m… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ZABERD Sp. z o.o. | 18 | 2024–2026 |
| Budimex S.A. | 17 | 2023–2026 |
| ELEKTROTIM S.A. | 14 | 2022–2024 |
| KM MANAGEMENT GROUP sp. z o.o. | 11 | 2024–2026 |
| InQubator Sp. z o.o. | 11 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 146 completed awards — not a statement about this procedure.)
This procedure allows 27 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now