How to bid in this country: portals, deadlines, thresholds →
Modernization of outdoor lighting in the communes of Turek, Mikstat and the Municipality of Turek
Modernizacja oświetlenia zewnętrznego na terenie Gmin Turek, Mikstat oraz Gminy Miejskiej Turek — original title
Your path to submission
- Deadline: 3 November at 10:00 — 2 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
1. The subject of the contract is the modernization of street lighting in the communes of Turek, Mikstat and the Municipality of Turek divided into 3 parts. The total scope of all works includes the replacement and installation of luminaires equipped with a remote management system with a subscription for 10 years in the amount of 1,404 sets. 2. The detailed scope of the modernisation includes a description of the subject-matter of the contract (hereinafter referred to as ‘OPZ’) constituting Annex 1 to the Terms of Reference (hereinafter referred to as ‘TEC’), which consists of: − assembly lists (Annex 1 to the CIP), − location maps with legend (Annexes 2 and 2A to the CIP), − photometric calculations (Annex 3 to the CIP) − bills of quantities (Annex 4 to the CIP). The above studies, which constitute the description of the subject-matter of the contract, are attached to the tender…
Show full description
… specifications. All the Contractor’s obligations are included in the draft contract in accordance with Annex 10 to the ToR. NOTE: 1) In view of the flat-rate nature of the remuneration, the Contracting Authority only provides, in the alternative, ‘Substances of works’ relating to the subject-matter of the contract, but they do not constitute a description of the subject-matter of the contract. The valuation of the works should also be made on the basis of other documents. 2) If questions are received at the stage of preparing the offer, the answers given by the Ordering Party are binding - they oblige the Contractor to perform the subject of the contract in accordance with the content of the answers given, regardless of the scope and description of the work to be performed contained in the tender specification. Other requirements of the Ordering Party: 1) The Contracting Authority recommends that the Contractor, in his interest, carry out an on-site visit to the area where the works covered by the subject of the contract are to be carried out. The Contracting Authority does not provide for the Contractor’s tender to be rejected on the grounds that the on-site visit referred to above has not been carried out; 2) Key parts of the order for personal performance by the Contractor: no provision is made for 3) The contracting authority authorises the submission of partial tenders for individual lots · 1. The subject of the contract is the modernization of street lighting in the area of Turek, in the scope covering the replacement of existing luminaires with new LED luminaires and the installation of new LED luminaires in the total amount of 498 kpl. 2. The detailed scope of the modernisation includes a description of the subject-matter of the contract, hereinafter referred to as ‘OPZ’, constituting Annex 1 to the ToR, which consists of: − assembly list (Annex 1 to the OPZ), − location maps with legend (Annex 2 to the OPZ), − photometric calculations (Annex 3 to the OPZ) − bill of quantities (Annex 4 to the OPZ). The above studies, which constitute the description of the subject-matter of the contract, are attached to the tender specifications. All the Contractor’s obligations are included in the draft contract in accordance with Annex 10 to the ToR. NOTE: 1) In view of the flat-rate nature of the remuneration, the contracting authority provides the ‘Substance of works’ relating to the subject-matter of the contract only in the alternative, but it does not constitute a description of the subject-matter of the contract. The valuation of the works should also be made on the basis of other documents. 2) If questions are received at the stage of preparing the offer, the answers given by the Ordering Party are binding - they oblige the Contractor to perform the subject of the contract in accordance with the content of the answers given, regardless of the scope and description of the work to be performed contained in the tender specification. · 1. The subject of the contract is the modernization of street lighting in the Mikstat area, in the scope covering the replacement of existing luminaires with new LED luminaires and the installation of new LED luminaires in the total amount of 729 kpl. 2. The detailed scope of the modernisation includes a description of the subject-matter of the contract, hereinafter referred to as ‘OPZ’, constituting Annex 1 to the ToR, which consists of: − assembly list (Annex 1 to the OPZ), − location maps with legend (Annex 2 to the OPZ), − photometric calculations (Annex 3 to the OPZ) − bill of quantities (Annex 4 to the OPZ). The above studies, which constitute the description of the subject-matter of the contract, are attached to the tender specifications. All the Contractor’s obligations are included in the draft contract in accordance with Annex 10 to the ToR. NOTE: 1) Due to the flat-rate nature of the remuneration
Contract
Type of service
What you must prove — eligibility criteria
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki dotyczące zdolności technicznej lub zawodowej, tj.: dysponują/będą dysponować następującymi osobami, które będą uczestniczyć w wykonywaniu zamówienia, tj.: - minimum 2 osobami posiada… read in fullcollapse
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki dotyczące zdolności technicznej lub zawodowej tj.: posiadają niezbędną wiedzę i doświadczenie, tzn.: w okresie ostatnich 5 lat, a jeżeli okres prowadzenia działalności jest krótszy - … read in fullcollapse
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki dotyczące zdolności technicznej lub zawodowej, tj.: dysponują/będą dysponować następującymi osobami, które będą uczestniczyć w wykonywaniu zamówienia, tj.: - minimum 2 osobami posiada… read in fullcollapse
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki dotyczące zdolności technicznej lub zawodowej tj.: posiadają niezbędną wiedzę i doświadczenie, tzn.: w okresie ostatnich 5 lat, a jeżeli okres prowadzenia działalności jest krótszy - … read in fullcollapse
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki dotyczące zdolności technicznej lub zawodowej, tj.: dysponują/będą dysponować następującymi osobami, które będą uczestniczyć w wykonywaniu zamówienia, tj.: - minimum 2 osobami posiada… read in fullcollapse
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki dotyczące zdolności technicznej lub zawodowej tj.: posiadają niezbędną wiedzę i doświadczenie, tzn.: w okresie ostatnich 5 lat, a jeżeli okres prowadzenia działalności jest krótszy - … read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| EUTRO sp. z o.o. | 1 | 2026 |
| Energa-Obrót SA | 1 | 2026 |
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 1,469 completed awards — not a statement about this procedure.)
This procedure allows 5 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Poland · Electrical machinery, 92 contracts went to foreign companies over the last 3 years (of 8,504 recorded awards) — mostly from Germany, France, Spain.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now