You submit on Vergabemarktplatz (cosinex) — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
Offer and evidence in: German, English.
Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.
What the buyer is looking for
Lot (1) and Lot (4) Flanged gate valve Lot (2) and Lot (5) Sewage pump Lot (3) and Lot (6) Water supply pump · GIZ will announce the specific delivery addresses in Germany once the contract has been awarded. The address will be located within a 200-km radius of Eschborn/German
Place of performanceDDP Supplier Plant (200 km around Eschborn 65760 Germany)
6 lots
Type of service
42 · Industrial machinery
CPV 42122130
Clement What the numbers say about this buyer
In this sector the buyer awards roughly every 4 months (34 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to Aramark GmbH.n = 34
59% of this buyer's awards went to companies that had already won here before (3,862 awards since 2017, spread over 1,552 companies). That is well above the sector norm (37%) — newcomers have a harder time here than elsewhere.n = 3,862 awards since 2017
The median procedure drew 3 bids (3,733 procedures with a bid count); 24% ended with a single bidder. Sector: median 1 bid.n = 3,733
26% of the bids received came from other countries (270 procedures with a bid mix) — all bidders, not just the winners. Sector: 9%.n = 270
The award came in at a median 92% of the estimated value (229 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 99%.n = 229
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Clement
In this buyer's last 44 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
What you must prove — eligibility criteria
›
Average minimum annual turnover
Net annual turnover - Proof of annual net turnover of more than 300.000 EUR in the years 2023, 2024, 2025 in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
References: supplies
Reference projects - Proof of at least two reference projects during the last 3 years in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
Other economic requirementSelf-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) pers… read in fullcollapse
Self-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) person(s), entity(ies) or body(ies) with a connection to Russia referred to in Article 5 k) (1) of Council Regulation (EU) No. 833/2014 in the most recent version concerning restrictive measures in view of Russia"s actions destabilising the situation in Ukraine , a) by the Russian nationality of the candidate/bidder or the establishment of the candidate/bidder in Russia, b) by a natural person, entity or body to which one of the criteria referred to in letter (a) applies holding a stake in the candidate/bidder by owning proprietary rights of more than 50%, c) by the candidate/bidder acting on behalf or at the direction of persons, entities or bodies to which the criteria referred to in letters (a) and/or (b) apply. 2. Companies involved in the contract as subcontractors, suppliers or companies whose capacities are used in connection with the provision of proof of eligibility which account for more than 10% of the contract value also do not belong to the group of persons with a connection to Russia within the meaning of the provision. 3. We confirm and will ensure, including but not limited to the term of the contract, that no companies involved as subcontractors, suppliers or companies whose capacities are used in connection with the provision of the proof of suitability are used which account for more than 10% of the contract value.
›
Average minimum annual turnover
Net annual turnover - Proof of annual net turnover of more than 300.000 EUR in the years 2023, 2024, 2025 in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
References: supplies
Reference projects - Proof of at least two reference projects during the last 3 years in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
Other economic requirementSelf-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) pers… read in fullcollapse
Self-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) person(s), entity(ies) or body(ies) with a connection to Russia referred to in Article 5 k) (1) of Council Regulation (EU) No. 833/2014 in the most recent version concerning restrictive measures in view of Russia"s actions destabilising the situation in Ukraine , a) by the Russian nationality of the candidate/bidder or the establishment of the candidate/bidder in Russia, b) by a natural person, entity or body to which one of the criteria referred to in letter (a) applies holding a stake in the candidate/bidder by owning proprietary rights of more than 50%, c) by the candidate/bidder acting on behalf or at the direction of persons, entities or bodies to which the criteria referred to in letters (a) and/or (b) apply. 2. Companies involved in the contract as subcontractors, suppliers or companies whose capacities are used in connection with the provision of proof of eligibility which account for more than 10% of the contract value also do not belong to the group of persons with a connection to Russia within the meaning of the provision. 3. We confirm and will ensure, including but not limited to the term of the contract, that no companies involved as subcontractors, suppliers or companies whose capacities are used in connection with the provision of the proof of suitability are used which account for more than 10% of the contract value.
›
Average minimum annual turnover
Net annual turnover - Proof of annual net turnover of more than 300.000 EUR in the years 2023, 2024, 2025 in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
References: supplies
Reference projects - Proof of at least two reference projects during the last 3 years in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
Other economic requirementSelf-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) pers… read in fullcollapse
Self-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) person(s), entity(ies) or body(ies) with a connection to Russia referred to in Article 5 k) (1) of Council Regulation (EU) No. 833/2014 in the most recent version concerning restrictive measures in view of Russia"s actions destabilising the situation in Ukraine , a) by the Russian nationality of the candidate/bidder or the establishment of the candidate/bidder in Russia, b) by a natural person, entity or body to which one of the criteria referred to in letter (a) applies holding a stake in the candidate/bidder by owning proprietary rights of more than 50%, c) by the candidate/bidder acting on behalf or at the direction of persons, entities or bodies to which the criteria referred to in letters (a) and/or (b) apply. 2. Companies involved in the contract as subcontractors, suppliers or companies whose capacities are used in connection with the provision of proof of eligibility which account for more than 10% of the contract value also do not belong to the group of persons with a connection to Russia within the meaning of the provision. 3. We confirm and will ensure, including but not limited to the term of the contract, that no companies involved as subcontractors, suppliers or companies whose capacities are used in connection with the provision of the proof of suitability are used which account for more than 10% of the contract value.
›
Average minimum annual turnover
Net annual turnover - Proof of annual net turnover of more than 300.000 EUR in the years 2023, 2024, 2025 in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
References: supplies
Reference projects - Proof of at least two reference projects during the last 3 years in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
Other economic requirementSelf-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) pers… read in fullcollapse
Self-declaration on EU Russia sanctions - The bidder has to submit the following binding declaration (if applicable, also on behalf of the persons represented in the request to participate/offer): 1. The candidate(s) / bidder(s) does/do not qualify as (a) person(s), entity(ies) or body(ies) with a connection to Russia referred to in Article 5 k) (1) of Council Regulation (EU) No. 833/2014 in the most recent version concerning restrictive measures in view of Russia"s actions destabilising the situation in Ukraine , a) by the Russian nationality of the candidate/bidder or the establishment of the candidate/bidder in Russia, b) by a natural person, entity or body to which one of the criteria referred to in letter (a) applies holding a stake in the candidate/bidder by owning proprietary rights of more than 50%, c) by the candidate/bidder acting on behalf or at the direction of persons, entities or bodies to which the criteria referred to in letters (a) and/or (b) apply. 2. Companies involved in the contract as subcontractors, suppliers or companies whose capacities are used in connection with the provision of proof of eligibility which account for more than 10% of the contract value also do not belong to the group of persons with a connection to Russia within the meaning of the provision. 3. We confirm and will ensure, including but not limited to the term of the contract, that no companies involved as subcontractors, suppliers or companies whose capacities are used in connection with the provision of the proof of suitability are used which account for more than 10% of the contract value.
›
Average minimum annual turnover
Net annual turnover - Proof of annual net turnover of more than 300.000 EUR in the years 2023, 2024, 2025 in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
›
References: supplies
Reference projects - Proof of at least two reference projects during the last 3 years in the supply of Pumps and valves. Bidding/service delivery consortia that cannot provide them are deemed unsuitable and excluded from the procedure.
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 44 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
In Germany · Industrial machinery, 230 contracts went to foreign companies over the last 3 years (of 6,872 recorded awards) — mostly from Switzerland, Italy, France.
Submission language: German, English.
Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.