How to bid in this country: portals, deadlines, thresholds →
Joint purchasing of electricity for Poreč-Parenzo, budget users and city companies
Zajednička nabava električne energije za Poreč-Parenzo, proračunske korisnike i gradske tvrtke — original title
Your path to submission
- Deadline: 2 November at 12:00 — 1 day left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Croatian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Joint procurement of electricity for the City of Poreč-Parenzo, budget users and city companies · The subject of this procedure is the procurement of goods - the supply of electricity for a period of 12 billing months from the conclusion of individual contracts or from the inclusion of billing metering points in the balance group of suppliers by the relevant system operator, all in accordance with the technical characteristics and other conditions referred to in this Tender documentation. The contracting authority shall conduct a green public procurement procedure and request that at least 50% of the total electricity to be supplied by the successful tenderer be produced from renewable energy sources (so-called "green energy"). In order to stimulate the production of energy from renewable sources, to make it more competitive with energy from conventional sources and to encourage the…
Show full description
… construction of new sources of renewable energy and achieve sustainable development, the Contracting Authority has determined that electricity must contain the above mentioned minimum percentage of electricity from renewable sources. Renewable energy sources are renewable non-fossil energy sources, i.e. wind energy, solar energy, aerothermal, geothermal and hydrothermal energy, sea energy, watercourse energy, biomass energy, landfill gas, sewage treatment plant gas and biogas (Electricity Market Act, NN Nos 111/21, 83/23 and 17/25). As a confirmation that the conditions on the origin of electricity have been met, the successful tenderer will be required to submit to the Contracting Authority, upon delivery of electricity, a certificate on the origin of electricity in accordance with the Methodology for determining the origin of electricity (NN Nos 133/14 and 127/19).
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (4 awards, most recently March 2026) — by that rhythm the next award was due around April 2026. The last award went to HEP-Opskrba d.o.o.n = 4
- The award came in at a median 115% of the estimated value (109 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 76%.n = 109
- 63% of this buyer's awards went to companies that had already won here before (169 awards since 2017, spread over 59 companies). That is well below the sector norm (79%) — this buyer switches suppliers more often than others.n = 169 awards since 2017
- The median procedure drew 3 bids (19 procedures with a bid count); 32% ended with a single bidder. Sector: median 2 bids.n = 19
- Across 13 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (13 of 13), References: services (11 of 13).n = 13
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Đusto d.o.o. Poreč | 26 | 2018–2024 |
| A1 Hrvatska d.o.o. | 13 | 2019–2024 |
| CESTA d.o.o. | 8 | 2018–2022 |
| CROATIA osiguranje d.d. | 7 | 2018–2026 |
| RIJEKA TRANS d.o.o. | 5 | 2018–2023 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 4 completed awards — not a statement about this procedure.)
This procedure allows 6 days between publication and deadline — typical in this country is 30 (median of 387 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Croatia · Petroleum & fuels, 1 contract went to a foreign company over the last 3 years (of 1,482 recorded awards).
Submission language: Croatian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now