Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

The service of drawing up design-technical documentation and design supervision for the extension of the Special Hospital for Prolonged Treatment Duga Resa

Uslugu izrade projektno-tehničke dokumentacije i projektantskog nadzora za dogradnju Specijalne bolnice za produženo liječenje Duga Resa — original title

HRCroatia · Karlovac

Your path to submission

  1. Deadline: 3 December at 12:00 — 32 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Croatian.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of this public procurement procedure is the procurement of project technical documentation and design supervision services for the extension of the Special Hospital for Prolonged Treatment of Duga Resa in all according to the attached Project Task. The services essentially include the preparation/activities: 1. Design substrates (ACTIVENESS 1) : DATA: 1.1 Environmental protection study 1.2 Geodetic survey of the existing state and development of geodetic substrates and studies 1.3 Geotechnical investigation works with the Study or Report 1.4 Elaborate of functional-technological solution and non-medical and medical equipment 2. Analysis of the existing state of the hospital's location and proposal for a new spatial solution. (ACTIVENCE 2) 3. Preparation of the conceptual design, i.e. description and graphical representation of the building on the catastrophic plan and/or…

Show full description

… study that is a condition for determining the special conditions and conditions of connection and obtaining the same (ACTIVNOST 3); 4. Preparation of the main project, obtaining the certificates of the main project and obtaining the building permit (ACTIVE 4); 5. Preparation of the execution project (ACTIVE 5) 6. Preparation of the basis for the procurement documents for the execution of works (ACTIVE 6) 7. Design supervision services during the construction of the building and consulting services during the implementation of the public procurement for the execution of works (ACTIVE 7)

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated value€200,000
Published28 Oct 2026
ProcedureOpen procedure
Reserved for SMEs

Type of service

71 · Architecture & engineering
CPV 71242000

Clement What the numbers say about this buyer

  • The award came in at a median 79% of the estimated value (104 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 53%.n = 104
  • 51% of this buyer's awards went to companies that had already won here before (300 awards since 2018, spread over 126 companies). 49% went to new names.n = 300 awards since 2018
  • < 1% of the bids received came from other countries (142 procedures with a bid mix) — all bidders, not just the winners. Sector: 13%.n = 142
  • The median procedure drew 3 bids (159 procedures with a bid count); 28% ended with a single bidder. Sector: median 3 bids.n = 159
  • Across 22 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (22 of 22), Minimum annual turnover (17 of 22), References: works (16 of 22), References: supplies (4 of 22).n = 22

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

What you must prove — eligibility criteria

›
Trade register enrolment
Detalji opisani u dokumentaciji o nabavi
›
Minimum annual turnover
Detalji opisani u dokumentaciji o nabavi
›
References: services
Detalji opisani u dokumentaciji o nabavi
›
Technical staff for quality control
Detalji opisani u dokumentaciji o nabavi
›
Security/guarantee required
Requirement texts are quoted in the notice's original language — only the official wording is binding.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
HEP-Opskrba d.o.o.152024–2026
EUROHERC osiguranje d.d.132024–2026
INA - Industrija nafte d.d., Zagreb92025–2026
AB gradnja d.o.o.92019–2024
RIJEKA TRANS d. o. o.72025–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

10
2024
8
2025
10
2026
28 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 3 December at 12:00

Tactics

When this buyer has awarded in this sector, usually 15 or more bids came in. Many compete here — price and references decide. (Based on 10 completed awards — not a statement about this procedure.)

This procedure allows 37 days between publication and deadline — typical in this country is 30 (median of 387 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Croatia · Architecture & engineering, 33 contracts went to foreign companies over the last 3 years (of 2,180 recorded awards) — mostly from France, Germany, Spain.

Submission language: Croatian.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Croatian
The 4 criteria on the left, plus your price.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now