Construction of a collision-free two-level intersection between Justynów and Janówka’
Budowa bezkolizyjnego skrzyżowania dwupoziomowego pomiędzy miejscowościami justynów i janówka” — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject of the contract is the preparation of complete design documentation and the execution of construction works in the ‘design and build’ system for the task entitled: ‘Construction of a collision-free two-level intersection between Justynów and Janówka’ as part of the project ‘Improving safety at railway-road intersections, including their conversion to two-level intersections’. The investment is located within ul. The main one at the junction with railway lines No 17 (Łódź Fabryczna – Koluszki) and No 25 (Łódź Kaliska – Dębica), in the villages of Justynów and Janówka, Andrespol municipality, Łódź eastern district, Łódź province. The scope of the subject of the contract includes in particular: • preparation of comprehensive multi-discipline design documentation to the extent necessary to implement the investment in the ‘design and build’ system, together with obtaining the…
Show full description
… required arrangements, opinions and administrative decisions, • design and construction of a collision-free intersection with railway lines No 17 and No 25 in the form of a road viaduct over PKP tracks during the newly designed route of ul. Main and tunnel for pedestrians and cyclists within the existing route of ul. the Principal; • Elimination of existing level crossing cat. A no. 017 016 046 located in km 16+046 of railway line no. 17 and km 21+056 of railway line no. 25 with accompanying infrastructure and adaptation of the control-command and signalling system; • reconstructing the existing platforms of Justynów station and ensuring that the planned tunnel is accessed via stairs and ramps; • extension and reconstruction of the adjacent road system (ul. Main, ul. Lokatorska, ul. Border, ul. Rumiankowa) together with the construction of sidewalks, parking spaces and road lighting; • demolition, construction and/or reconstruction of conflicting ground, underground and above-ground infrastructure networks, to the extent necessary and necessary to carry out the planned construction project (electricity, telecommunications, overhead contact line, gas, water supply and sewage networks); • construction of technological channels; • construction of a drainage system for the designed road system (including a power generator for a water pumping station), engineering structures, platforms and tracks; • felling of trees and shrubs colliding with the investment and carrying out compensatory plantings; • obtaining all the necessary administrative decisions on behalf of the Contracting Authority, in particular the decision on the permit for the implementation of a road investment (ZRID), the decision on environmental conditions, water permits and other consents, agreements and opinions required by law. The design documentation that is the subject of the contract should be developed in such a way as to obtain a final decision on the road investment permit (ZRID) and then carry out the designed construction works in accordance with the law and the principles of technical knowledge. The Contractor is obliged to obtain, on behalf of the Investor, a final decision on the permit to implement a road investment (ZRID) or, to the extent that it is not required, a building permit or a notification of the intention to perform construction works. The Contractor shall also be required to complete, clarify and correct the prepared documents after the submission of applications for administrative decisions, opinions, arrangements or authorisations, until they become final. Implementation of the task is aimed at improving road and rail traffic safety, eliminating collisions at the level of tracks and improving communication between Justynów and Janówka.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (77 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to SP-INSTAL SP. Z O.O.n = 77
- 23% of this buyer's awards went to companies that had already won here before (143 awards since 2015, spread over 104 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 143 awards since 2015
- The median procedure drew 4 bids (10 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 10
- Across 6 procedures with structured selection criteria, this buyer most often required: Equipment, plant and technical facilities (5 of 6), Staff qualifications (5 of 6), References: works (3 of 6), References: services (2 of 6).n = 6
- 1% of awards went to companies from abroad (143 awards with a known winner country). Sector average: 0%.n = 143
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
w zakresie zdolności technicznej i zawodowej : a)wymagane jest wykazanie przez Wykonawcę, że w okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie wykonał: Budowę lub Przebudowę c… read in fullcollapse
dysponowania lub możliwość dysponowania osobami zdolnymi do wykonania Zamówienia: 1. Kierownik Budowy – 1 osoba , która posiada a) uprawnienia budowlane bez ograniczeń do kierowania robotami budowlanymi w specjalności inżynieryjnej kolejowej w zakresie kolejow… read in fullcollapse
dysponowania lub możliwości dysponowania do niżej wymienionych narzędzi i urządzeń technicznych w celu realizacji Zamówienia: a. co najmniej 1 szt. - żuraw samojezdny kolejowy o maksymalnym udźwigu co najmniej 30 t; b. co najmniej 1 szt. - oczyszczarka tłuczni… read in fullcollapse
sytuacji ekonomicznej lub finansowej zapewniającej wykonanie Zamówienia, tj.: - posiada środki finansowe lub zdolność kredytową - w wysokości nie mniejszej niż 4 800 000,00 PLN. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie spełniania warunkó… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| INSTYLE24 Sp. z o.o., | 5 | 2023–2024 |
| "STRADA" ADAM OLCZAK ŁUKASZ PIATEK SPÓŁKA CYWILNA | 5 | 2022–2024 |
| Usługi Handel Transport Anna Chmiel | 4 | 2022–2024 |
| ŻWIR-MAX FIRMA PRZEMYSŁAW SKUPIŃSKI | 3 | 2022–2024 |
| ŚLIW-BRUK Sebastian Śliwiński | 3 | 2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 9 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now