How to bid in this country: portals, deadlines, thresholds →
Supply for hire of 2 reverse biosmosis water treatment and distribution plants (installation, maintenance and consumables included), lots 2, needed by SC nephrology and dialysis (Novara and Galliate sites) of A.O.U. greater than charity, lasting 60 months in addition to 24 months as a renewal option and 12 months as an extension option
Fornitura a noleggio di n. 2 impianti di trattamento e distribuzione acqua a biosmosi inversa (installazione, manutenzione e consumabili inclusi), lotti 2, occorrenti alla sc nefrologia e dialisi (sedi di novara e galliate) dell’a.o.u. Maggiore della carita’, durata mesi 60 oltre a mesi 24 come opzione di rinnovo e mesi 12 come opzione di proroga — original title
Your path to submission
- Deadline: 18 December at 14:00 — 47 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Italian.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
SUPPLY FOR RENT OF 2 INVERSE BOXMOSE WATER TREATMENT AND DISTRIBUTION SYSTEMS (INSTALLATION, MAINTENANCE AND CONSUMABLES INCLUDED), 2 BATTERIES, REQUIRED BY SC NEFROLOGY AND DIALYSIS (NOVARA AND GALLIATE SEATS) OF THE A.O.U. MAJEURE DELLA CARITA’, DURING 60 MONTHS MORE THAN 24 MONTHS AS AN OPTION FOR RENEWAL AND 12 MONTHS AS AN OPTION FOR RENEWAL · Rental supply of a reverse biosmosis water treatment and distribution plant at the Novara site · Rental supply of a reverse biosmosis water treatment and distribution plant at the Galliate site
Contract
Type of service
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Italian.
Tender documents — direct download
Tactics
When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 311 completed awards — not a statement about this procedure.)
This procedure allows 52 days between publication and deadline — typical in this country is 34 (median of 3,981 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Italy · Industrial machinery, 18 contracts went to foreign companies over the last 3 years (of 1,443 recorded awards).
Submission language: Italian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now