How to bid in this country: portals, deadlines, thresholds →
Reconstruction and upgrading of Novalja Primary School
Rekonstrukcija i dogradnja Osnovne škole Novalja — original title
Your path to submission
- Deadline: 26 November at 12:00 — 25 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Croatian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Within the project co-financed by the Recovery and Resilience Facility, and on the basis of the Grant Agreement for projects financed by the Recovery and Resilience Facility, reference NPOO.C3.1.R1.-I2.01-V1.0143 "Project Reconstruction of A.G. Matoša Novalja Elementary School", the subject of this procurement procedure is the reconstruction and upgrading of an existing elementary school building: Elementary school A.G. Matoš Novalja at Zeleni put 1, 53291 Novalja (k.č.br. 1783/25, k.o. Novalja). · The subject of the procurement is the reconstruction and upgrading of the existing building of the elementary school with arranging the environment, at the address Zeleni put 1, 53291 Novalja (k.č.br. 1783/25, k.o. Novalja). The subject of the procurement is described in detail in the Costs and Project and Technical Documentation (Main and Performance Project), which are an integral part of…
Show full description
… this procurement documentation. Works shall be carried out in accordance with: 1. The main project, joint marking JH-01/25, from June 2025, made by the Office of the Authorized Architect Jurica Robert Hajdarović Haidar; 2. Building permit (CLASS: UP/I-361-03/25-01/000181, REF. NO: 2125-06-02/14-25-0018, of 03.07.2025.) issued by Lika-Senj County, Administrative Department for Physical Planning, Construction and Environmental Protection, Separate place of work of Novalja; 3. Performance project, joint marking JH-01/25, from November 2025, made by the Office of Authorized Architect Jurica Robert Hajdarović Haidar. Since, due to the size of the files, the design and technical documentation could not be published through the EOJN system, the Contracting Authority informs interested economic operators that it can be downloaded via the following link: https://ličko-senjska.hr/public/procurement/procurement-public-procurement Project-technical documentation in accordance with which works are carried out complies with the principle of ‘do no significant harm’. ‘Do not significant harm’ – DNSH; further DNSH principle), all in line with Regulation EU 2021/241 of the European Parliament and of the Council of 12 February 2021 establishing the Recovery and Resilience Facility and other applicable legislation.
Contract
Type of service
Clement What the numbers say about this buyer
- 53% of this buyer's awards went to companies that had already won here before (140 awards since 2018, spread over 59 companies). That is well below the sector norm (66%) — this buyer switches suppliers more often than others.n = 140 awards since 2018
- 50% of the bids received came from small and medium-sized enterprises (27 procedures with a bid mix). Sector: 82%.n = 27
- The award came in at a median 77% of the estimated value (69 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 93%.n = 69
- The median procedure drew 2 bids (33 procedures with a bid count); 39% ended with a single bidder. Sector: median 3 bids.n = 33
- Across 5 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (5 of 5), References: works (4 of 5), Technical staff for execution (4 of 5), References: services (1 of 5).n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Velebit tours | 12 | 2019–2023 |
| Autotrans d.d. | 9 | 2019–2023 |
| Apital d.o.o. | 7 | 2020 |
| PRIJEVOZ KNEŽEVIĆ d.o.o. | 7 | 2025–2026 |
| AUTOTRANS d. d. | 7 | 2024–2026 |
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 2,345 completed awards — not a statement about this procedure.)
This procedure allows 31 days between publication and deadline — typical in this country is 30 (median of 387 procedures). A normal window for this market.
Foreign bidders
In Croatia · Construction work, 14 contracts went to foreign companies over the last 3 years (of 2,224 recorded awards).
Submission language: Croatian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now