How to bid in this country: portals, deadlines, thresholds →
Maintenance with full warranty of gas equipment, VMC, water overpressure modules, various energy installations and DAAF - Years 2027-2030
Maintenance avec garantie totale des équipements gaz, VMC, modules de surpression d'eau, installations énergétiques diverses et DAAF - Années 2027-2030 — original title
Your path to submission
- Deadline: 2 November at 17:00 — 2 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The services relate in particular to the maintenance of the following equipment: - wall-mounted gas-fired boilers - various energy installations (heat pumps, thermodynamic balloons, etc.) - controlled mechanical ventilation installations - water overpressure modules - DAAF The services are divided into 2 lots · Lot 1 concerns in particular 2687 boilers and 3162 VMC installations · Lot 2 concerns in particular 2293 boilers and 2610 VMC installations
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 10 months (3 awards, most recently September 2026) — the next award is due around July 2027 by that rhythm. The last award went to PROXISERVE.n = 3
- 13% of this buyer's awards went to companies that had already won here before (68 awards since 2018, spread over 39 companies). That is well below the sector norm (25%) — this buyer switches suppliers more often than others.n = 68 awards since 2018
- The median procedure drew 4 bids (41 procedures with a bid count); 5% ended with a single bidder. Sector: median 3 bids.n = 41
- 3% of awards went to companies from abroad (68 awards with a known winner country). Sector average: 5%.n = 68
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SYGMATEL ELECTRICITE | 3 | 2025 |
| LUCAS LE MANS | 3 | 2025–2026 |
| SOGEA ATLANTIQUE BTP | 3 | 2025–2026 |
| BOULFRAY | 2 | 2025–2026 |
| ETS JOUVET | 2 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 8 days between publication and deadline — typical in this country is 32 (median of 12,234 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In France · Repair & maintenance, 300 contracts went to foreign companies over the last 3 years (of 9,400 recorded awards) — mostly from Germany, Spain, Romania.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now