"Construction of a new route of provincial road No 721 on the section from national road No 7 to the intersection with Mleczarska Street in Piaseczno, section II - from the S7 road junction to the intersection with Mleczarska Street in Piaseczno" – procedure No 194/26

,,Budowa nowego przebiegu drogi wojewódzkiej nr 721 na odcinku od drogi krajowej nr 7 do skrzyżowania z ulicą Mleczarską w Piasecznie, odcinek II - od węzła drogowego S7 do skrzyżowania z ulicą Mleczarską w Piasecznie” – nr postępowania 194/26 — original title

PLPoland · Warszawa

Your path to submission

  1. Deadline: 19 November at 08:00 — 18 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Polish.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1.A detailed description of the subject of the contract can be found in the Tender Documentation (Part IV of the Terms of Reference), in the Works Quantity - made available only illustratively (Part V of the Terms of Reference) and in the Offering Estimate (with regard to the disposal of destruction containing exceeded permissible standards for the content of polycyclic aromatic hydrocarbons - Part VI of the Terms of Reference). 2.The Contractor is obliged to ensure, at his own expense, safe conditions for road and pedestrian traffic in the area of the works covered by the contract on the basis of the traffic organisation project, "for the time of construction" drawn up by and at the expense of the Contractor. The Contractor shall be obliged to update the design of the permanent traffic organisation. 3.The project has been adapted to the needs of all users, including ensuring…

Show full description

… accessibility for people with disabilities. As a public facility, it does not have restrictions on accessibility by all road users, which is required by the provisions in force at the time of drafting the project documentation regarding the requirements, among others, for the technical conditions that roads should meet: Regulation of the Minister of Transport and Maritime Economy on technical conditions to be met by public roads and their location (i.e. OJ 2016. Poz. 124 as amended). In order to provide facilities for the disabled and the elderly, the documentation provided for: at pedestrian crossings, underestimation of curbs separating the roadway from the sidewalk, on sidewalks in front of pedestrian crossings and on platforms of bus bays, the use of warning pavement plates and the implementation of road lighting. 4.In the case of indicating in the description of the subject of the contract trademarks, patents or origin, source or specific process that characterizes the product or services provided by a specific contractor, the Ordering Party accepts equivalent solutions. 5.When reference is made in the description of the subject of the contract to standards, European technical assessments, approvals, technical specifications and technical reference systems, the Ordering Party shall accept solutions equivalent to those described. 6. The contracting authority shall provide for the award of the contracts referred to in Article 214(1)(b) CTMR. 1 point 7 of the Public Procurement Act up to the total value of: PLN 164 903 414.96 net. A similar contract shall provide for the execution of: - preparatory works, - measuring works - demolition works, - earthworks, - foundations, - surfaces, - works in the bridge industry, - works in the installation industry, - works in the drainage industry - works in the electricity industry - works in the telecommunications industry - works in the construction industry - construction works - road body drainage works, - street elements, - traffic organization works and BRD, - finishing works, - greenery works The works concern a section on which construction works and/or adjacent sections will be carried out. 7. The Contractor is obliged to have a third party liability insurance policy for damage caused during the performance of the contract and to third parties for the entire duration of the contract and for a guarantee amount not less than PLN 75,000,000.00. 8. Deadline for performance of the contract: 27 months from the date of signing the contract, including: - 24 months from the date of signing the contract – the date of completion of the works; - up to 27 months from the date of signing the contract - the date of completion of the subject of the contract. The Contractor shall comply with the following fixed milestones for the execution of the works and the order in which they are to be carried out: Milestone I – execution of works (confirmed by a partial acceptance protocol of works) with a value of not less than 25% of the gross remuneration for the performance of the entire subject of the contract (excluding remuneration for the disposal together with the transport of asphalt destruction containing exceeded permissible standards for the content of polycyclic aromatic hydrocarbons) no later than 8 months from the date of signing the contract. II Milestone - w

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published23 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45233000 · 45100000 · 45231000 · 45221000 · 45231300

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (951 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to PRZEDSIĘBIORSTWO ROBÓT INŻYNIERYJNO-DROGOWYCH W GRÓJCU Sp. z o. o.n = 951
  • 62% of this buyer's awards went to companies that had already won here before (1,622 awards since 2015, spread over 515 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 1,622 awards since 2015
  • The median procedure drew 6 bids (333 procedures with a bid count); 5% ended with a single bidder. Sector: median 5 bids.n = 333
  • 100% of the bids received came from small and medium-sized enterprises (59 procedures with a bid mix). Sector: 84%.n = 59
  • 2% of awards went to companies from abroad (1,622 awards with a known winner country). Sector average: 0%.n = 1,622

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
STRABAG Sp. z o.o.732021–2026
Przedsiębiorstwo Robót Drogowo – Budowlanych S.A.562021–2026
Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o.552021–2025
COLAS Polska Sp. z o.o.382020–2026
BUDROMOST-STARACHOWICE” Sp. z o.o.342021–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

78
2021
130
2022
161
2023
224
2024
226
2025
158
2026
977 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 19 November at 08:00

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 52 completed awards — not a statement about this procedure.)

This procedure allows 27 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.

Submission language: Polish.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Polish
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now