How to bid in this country: portals, deadlines, thresholds →
Reconstruction of the building of the Tax Office in Lubaczów as part of the task ‘Reconstruction to improve the energy efficiency of the building of the Tax Office in Lubaczów at ul. Jana III Sobieskiego 6’.
Przebudowa budynku Urzędu Skarbowego w Lubaczowie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Lubaczowie przy ul. Jana III Sobieskiego 6”. — original title
Your path to submission
- Deadline: 3 November at 10:00 — 2 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject of the contract are construction works related to the reconstruction of the office building of the Tax Office in Lubaczów at ul. Jan III Sobieski 6. The investment task carried out includes: reconstruction of the existing building at ul. Jan III Sobieski 6 in Lubaczów, with regard to the works covered by the building permit, Decision No 242/2024 of 4 July 2024, in accordance with the documentation prepared by mgr. inż. arch. Charles Bulanda. The subject matter of the Agreement shall include, within the framework of eligible measures: 1) Guaranteed scope: a) insulation of external walls; b) insulation of the floor ceiling; c) reconstruction of the building envelope and ceilings due to the planned mechanical ventilation - making punctures under the ducts of the mechanical ventilation system; d) construction of a photovoltaic installation on the roof of a building with a…
Show full description
… capacity of 21.8 kWp; e) construction (installation) of a mechanical ventilation system with a control panel located on the roof of the building; construction (installation) of air-conditioning installations, including two outdoor units on the roof of the building; g) construction (installation) of the installation and management system BMS (Building Management System;) h) replacement of window and door joinery , in accordance with the audit guidelines, in the "warm assembly" system and window opening sensors; i) reconstruction of the roof - replacement of the , roof truss covering and covering along with the finishing of the roof surface from the EPDM membrane; reconstruction of the gas boiler room – dismantling of old boilers with the installation of boiler rooms and installation of new gas-fired condensing boilers with accessories; k) construction of a new installation C.O. from insulated pipes with the installation of new radiators equipped with thermostatic valves; l) renovation of the domestic hot water system and installation of the storage tank in the boiler room with adjusting fittings; m) disassembly of existing air-conditioning elements (external units, internal units, cabling); n) renovation of internal and external lighting, including replacement of luminaires with LED luminaires, and replacement of wiring; accompanying finishing works (painting, plastering, restoration to the original state); p) steel structures for ceilings hanging and stairs to the archive; q) replacement of linings in rooms indicated in documentation r) sheet metal works and other construction works (including chimney flashing, blinding of ventilation ducts, delivery and assembly of nesting boxes; s) demolition and restoration works (including dismantling and reassembly of: handles for flags, signs and markings , railings and railings); t) assembly of nesting boxes; u) lightning protection system; v) hydrant system. 2) the order carried out within the scope of the option right: the right of option I: construction and assembly works consisting in the supply and installation of internal window sills and the construction and installation of new window grilles inside the server room; b) Option II right: construction and assembly works consisting in the installation of aluminium raster suspended ceilings on a metal grate; c) the right of option III: finishing works, including: plaster replenishment, priming, plastering and painting of entire rooms.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (48 awards, most recently September 2026) — the next award is due around January 2027 by that rhythm. The last award went to ACORDI Dominik Ziobro.n = 48
- The median procedure drew 2 bids (75 procedures with a bid count); 41% ended with a single bidder. Sector: median 5 bids.n = 75
- 30% of this buyer's awards went to companies that had already won here before (290 awards since 2017, spread over 174 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 290 awards since 2017
- 3% of awards went to companies from abroad (290 awards with a known winner country). Sector average: 0%.n = 290
- Across 68 procedures with structured selection criteria, this buyer most often required: References: works (63 of 68), Staff qualifications (59 of 68), References: supplies (4 of 68), Special authorisation or membership required (4 of 68).n = 68
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Zamawiający wymaga wykazania przez Wykonawcę spełniania warunków udziału w postępowaniu dotyczących zdolności technicznych lub zawodowych w zakresie doświadczenia zawodowego. Zamawiający uzna warunek udziału w postępowaniu w zakresie doświadczenia zawodowego z… read in fullcollapse
Zamawiający wymaga wykazania przez Wykonawcę spełniania warunków udziału w postępowaniu dotyczących zdolności technicznych lub zawodowych w zakresie osób skierowanych do realizacji zamówienia publicznego. Zamawiający uzna warunek udziału w postępowaniu dotyczą… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ACORDI Dominik Ziobro | 11 | 2021–2026 |
| REMONDIS Medison Rzeszów Sp. z o.o. | 6 | 2022–2026 |
| AMW REWITA Sp. z o.o. | 5 | 2022–2026 |
| FM Integrated Solutions Sp. z o.o. | 4 | 2022–2025 |
| Expert mgr inż. Mateusz Kaczmarzyk | 4 | 2022–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 11 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now