How to bid in this country: portals, deadlines, thresholds →
Renovation and extension of a building in the spa area
Gyógymedencetéri épület felújítása, bővítése — original title
Your path to submission
- Deadline: 19 November at 10:00 — 18 days left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
I. The object of the construction works is the partial demolition, reconstruction and extension of the existing building of the Bük Spa in the spa area, in such a way that the parts of the building not affected by the construction can continue to be used operationally during the construction period. Place of performance: Bük Spa: 9740 Bük, Termál tér 1., 1333/39 hrsz. During construction, the separation of guest traffic, operator traffic and construction traffic must be ensured, as well as the continuous maintenance of the hygienic, public health, technical and occupational safety conditions of the operating bath, with special attention to guest safety, traffic regime, dust and noise pollution, and water treatment and hygiene requirements. The building structures to be demolished are indicated on the plan sheets of the architectural design chapter presenting the existing condition of the…
Show full description
… building. The demolitions planned in the building of the spa pool are spa pool space: • dismantling of existing exhaust ventilation ducts to the ventilation machine housing; • demolition of the windows at the northern and southern ends of the existing reinforced concrete staves • demolition of the aluminium curtain wall system that closes the thermal pool space on the ground floor in the south and west directions and the connecting swimming master’s cabin • demolition of the roofing of the reinforced concrete staves • demolition of the existing reinforced concrete staves of the thermal pool space and their supporting ND-directional beams up to the upper plane of the reinforced concrete beams in the KNY direction o the method of construction is determined by the contractor o the demolition work cannot cause significant noise in the area according to the needs of the recreation area • demolition of the monolithic reinforced concrete canopy structure and supporting pillars on the western side of the thermal pool space while retaining the foundation • demolition of the mechanical ducts of the thermal pool and their supporting ND-direction beams to the upper plane of the reinforced concrete beams in the KNY direction • complete demolition of the thermal pool floor covering, the basement and the connecting stairs in the wall walls of the thermal pool • demolition of the building wall wall walls of the planned for the thermal pool • demolition of the underground cellar and the building walls and tunnels of the building and the northern side walls of the thermal pool • demolition of the window and parapets in the arched wall of the adventure bath on the east side, as well as the section of the wall; • demolition of the opening and closing line on the west side of the buffet connecting the building of the medicinal pool with the rest area building in the south direction of the building • demolition of the pavements, stairs and retaining walls in the south and west direction of the medicinal pool building; • demolition of sidewalks and felling of trees according to the work part of landscape architecture in the pool area building of the spa: • spa pool space: construction of roof pillars, • construction of a roof structure above the spa pool space with understressed steel main racks and drawer racks, steel-armed sandwich panel closure slabs covered with a high-resistance coating, mineral wool thermal insulation and FPO roof insulation; • construction of the installed canopy of the building part by the construction of roof layers and additional elements; • construction of basement level corridor system and reinforced concrete pool structure; • construction of a substrate; • construction of a curtain wall of aluminum structure with insulating glazing on the western, southern and northern facades; • construction of the inner window row on the east side of the spa pool space; • construction of a ventilation line system under the roofing through the steel drawer supports; • construction of lighting, other high-current, amplification and other low-current systems under the roof structure; • construction of stainless steel pool (total floor space: 394 m2); • construction of floor and wall cladding in the pool area; • construction of an open suspended ceiling with stainless steel sheet structure under the roof structure on the medicated bed
Contract
Type of service
What you must prove — eligibility criteria
P.1. Alkalmatlan az ajánlattevő, amennyiben a jelen felhívás feladásának napját megelőző utolsó három mérleg fordulónappal lezárt üzleti évben a közbeszerzés tárgyából (magasépítési kivitelezési és/vagy felújítási tevékenység) származó általános forgalmi adó n… read in fullcollapse
M.1. Alkalmatlannak minősül az ajánlattevő, amennyiben nem rendelkezik az eljárást megindító felhívás feladása napjától visszafelé számított öt évben teljesített (műszaki átadás-átvétellel lezárt), de legfeljebb nyolc éve megkezdett, a közbeszerzés fő tárgya (… read in fullcollapse
M.2. Alkalmatlannak minősül az ajánlattevő, amennyiben a teljesítésbe bevonni kívánt szakemberei között nincsen: a) legalább 1 fő, a 266/2013. (VII.11.) Korm. Rendelet, 1. melléklet VI. 1. rész 2. pontja szerinti „MV-É” kategóriának megfelelő (vagy ennek megfe… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Kontex Kft. | 1 | 2024 |
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,344 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now