How to bid in this country: portals, deadlines, thresholds →
Urban Futsal Hall - Sárkány Arena construction
Városi Futsal Csarnok - Sárkány Aréna kivitelezése — original title
Your path to submission
- Deadline: 10 November at 12:00 — 10 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Construction of a piece of urban futsal hall according to construction plans, on a property owned by the Municipality of Nyírbátor, located in the inner area of the block of land number 2537/4, bordered in nature by 4300 Nyírbátor, Szabadság tér – Szentvér u. – Édesanya útja – Báthori utca. The planned hall has a ground floor + 2 floors, a useful floor area of about 3250 m2, while the gross built-in floor area of the building is about 2310 m2. The hall part of the building has a steel frame structure with a span of 32.78m, while the other parts of the building are made with reinforced concrete pillar frame, monolithic reinforced concrete slab structure, load-bearing and stiffening masonry. Approx. 1490m2 sports parquet flooring is made in the hall area. Within the framework of the investment, the winning contractor is also responsible for carrying out the external utilities, road and…
Show full description
… garden construction works required for the building, as well as obtaining the final occupancy permit. The construction also includes the development of the building’s complete technical building and building electrical systems, in particular heating, cooling, ventilation systems, as well as high-voltage and low-voltage electrical networks. Within the framework of the investment, the contractor will be responsible for carrying out the architectural, building structure, supporting structure, building engineering, building electrical and fire protection works according to the construction plans, as well as the external public utilities, road and garden construction works required for the building, and obtaining the final occupancy permit. · Construction of a piece of urban futsal hall according to construction plans, on a property owned by the Municipality of Nyírbátor, located in the inner area of the block of land number 2537/4, bordered in nature by 4300 Nyírbátor, Szabadság tér – Szentvér u. – Édesanya útja – Báthori utca. The planned hall has a ground floor + 2 floors, a useful floor area of about 3250 m2, while the gross built-in floor area of the building is about 2310 m2. The hall part of the building has a steel frame structure with a span of 32.78m, while the other parts of the building are made with reinforced concrete pillar frame, monolithic reinforced concrete slab structure, load-bearing and stiffening masonry. Approx. 1490m2 sports parquet flooring is made in the hall area. Within the framework of the investment, the winning contractor is also responsible for carrying out the external utilities, road and garden construction works required for the building, as well as obtaining the final occupancy permit. Contracting authority in accordance with Decree No 321/2015. Pursuant to Section 46(3) of the Government Decree, it is stipulated that the reference to a product, origin, type, procedure, activity, person, patent or trade mark of the make, origin, type specified in the invitation to tender and in the procurement documents was made only in order to clearly determine the nature of the object, and the term ‘or equivalent’ is to be understood. It is for the tenderer to prove equivalence.
Contract
Type of service
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (20 awards since 2017, all to one company). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 20 awards since 2017
- The median procedure drew 2 bids (20 procedures with a bid count); 45% ended with a single bidder. Sector: median 5 bids.n = 20
- Not one of the 20 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 20
- Across 5 procedures with structured selection criteria, this buyer most often required: References: works (5 of 5), Technical staff for execution (5 of 5), Average minimum turnover in the contract field (5 of 5).n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
Alkalmassági követelmény megnevezése: Referencia Alkalmassági követelmény ismertetése: Előzetes igazolás: A Kbt. 67.§ (1) bekezdésében foglaltak alapján ajánlattevő (AT) ajánlatában köteles az alkalmassági követelményeknek való megfelelés teljesülése tekinteté… read in fullcollapse
Alkalmassági követelmény megnevezése: Szakember Alkalmassági követelmény ismertetése: Előzetes igazolás: A Kbt. 67.§ (1) bekezdésében foglaltak alapján ajánlattevő (AT) ajánlatában köteles az alkalmassági követelményeknek való megfelelés teljesülése tekintetéb… read in fullcollapse
P/1.) AT csatolja a 321/2015. (X.30.) Korm. rendelet 19. § (1) bekezdés c) pontjában foglaltak szerinti nyilatkozatot az eljárást megindító felhívás feladásának időpontját megelőzően mérlegfordulónappal lezárt előző három üzleti év közbeszerzés tárgyából (épít… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Károlyház Kft | 1 | 2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,344 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now