Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Preparation of design documentation and execution of construction and assembly works related to the reconstruction of a single-track 110 kV line to a double-track 110 kV line on the Łomża 2 - Nowogród section in the area of activity of PGE Dystrybucja S.A. Branch Białystok

Opracowanie dokumentacji projektowej oraz wykonanie robót budowlano- montażowych związanych z przebudową jednotorowej linii 110 kV na dwutorową 110 kV na odcinku Łomża 2 – Nowogród na terenie działalności PGE Dystrybucja S.A. Oddział Białystok — original title

PLPoland · Lublin

Your path to submission

  1. Deadline: 6 November at 10:00 — 5 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Polish.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the Contract is the preparation of design documentation and execution of construction and assembly works related to the reconstruction of a single-track 110 kV line to a double-track 110 kV line on the Łomża 2 - Nowogród section in the area of activity of PGE Dystrybucja S.A. Branch Białystok. 2. Detailed Description of the subject of the Order is contained in Annex 1 to the Terms of Reference and 1.1 to the Terms of Reference. 3. The Contracting Authority shall require persons performing the activities specified in Annex 2 to the ToR to be employed on the basis of an employment contract by the Contractor or a Subcontractor during the performance of the contract. The method of verifying the employment of these persons and the Contracting Authority's powers to control the Contractor's compliance with the requirements related to the employment of these persons and…

Show full description

… sanctions for failure to meet these requirements are set out in the draft provisions of the Agreement, constituting Annex 2 to the ToR. 4. Whenever the Contracting Authority describes the subject-matter of the contract by reference to the standards, technical assessments, technical specifications and technical reference systems referred to in Art. 1 point 2 and paragraph 3 of the Public Procurement Act, it should be understood that in accordance with Article 101 sec. 4 of the Public Procurement Act, also allows equivalent solutions.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published22 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45000000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (50 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to EKTO Sp. z o.o.n = 50
  • The median procedure drew 7 bids (566 procedures with a bid count); 12% ended with a single bidder. Sector: median 5 bids.n = 566
  • 38% of this buyer's awards went to companies that had already won here before (628 awards since 2015, spread over 314 companies). 62% went to new names.n = 628 awards since 2015
  • The award came in at a median 100% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 8
  • 11% of the bids received came from other countries (128 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 128

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Sygnity S.A.102021–2026
ENERGO ZET Sp. z o.o.92024–2026
DIP ENERGIS sp. z o.o.92024–2026
Innsoft Sp. z o.o.82023–2026
Gamuza Sp. z o.o.72024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

22
2024
90
2025
74
2026
186 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 6 November at 10:00

Tactics

When this buyer has awarded in this sector, usually 10 or more bids came in. Many compete here — price and references decide. (Based on 49 completed awards — not a statement about this procedure.)

This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Submission language: Polish.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Polish
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now