Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Framework agreement with MORE operators, divided into three lots, for the award of engineering and architecture services and practical management

Accordo quadro con più operatori, suddiviso in tre lotti, per l’affidamento di servizi di ingegneria e architettura e gestione pratiche — original title

ITItaly · Novara

Your path to submission

  1. Deadline: 3 December at 12:00 — 32 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Italian.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

FRAMEWORK AGREEMENT WITH MORE OPERATORS, THREE-BOT SUDDIVISO, FOR THE RELIABILITY OF ENGINEERING AND ARCHITECTURE SERVICES AND PRACTICAL MANAGEMENT · Aqueduct and Sewerage · Purification · CSE

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated value€3,800,000
Published22 Oct 2026
ProcedureOpen procedure
Place of performanceNovara
Framework agreement3 lots

Type of service

71 · Architecture & engineering
CPV 71240000

Clement What the numbers say about this buyer

  • The award came in at a median 43% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 65%.n = 6
  • 8% of this buyer's awards went to companies that had already won here before (102 awards since 2017, spread over 88 companies). 92% went to new names.n = 102 awards since 2017
  • The median procedure drew 8 bids (100 procedures with a bid count); 2% ended with a single bidder. Sector: median 8 bids.n = 100
  • 3% of awards went to companies from abroad (102 awards with a known winner country). Sector average: 1%.n = 102

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Italian.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
LS Ingegneria Srls22026
PASCUCCI OPERE PUBBLICHE S.R.L.22025–2026
EUROCONDOTTE SRL22025–2026
Studio 74 Srl22026
BRUNO SRL22025–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

6
2025
5
2026
11 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 3 December at 12:00

Tactics

When this buyer has awarded in this sector, usually 8 or more bids came in. Many compete here — price and references decide. (Based on 55 completed awards — not a statement about this procedure.)

This procedure allows 43 days between publication and deadline — typical in this country is 34 (median of 3,981 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Italy · Architecture & engineering, 108 contracts went to foreign companies over the last 3 years (of 14,715 recorded awards) — mostly from Germany, France, Spain.

Submission language: Italian.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
All known sources are notice services. The buyer names the submission point in the notice itself.
Put together the evidence — in Italian
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now