How to bid in this country: portals, deadlines, thresholds →
Construction investment of a new Transport Museum
Új Közlekedési Múzeum kivitelezési beruházása — original title
Your path to submission
- Deadline for requests to participate: 19 November at 12:00 — 19 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Construction investment of a new Museum of Transport Reason for exclusion of a sub-offer: The technical content and task units of the investment presuppose overlapping, parallel construction processes resulting from the site conditions and the technical content of the plans. Due to the close links, the Investment was already treated as an organic unit during the design process by the designer, a uniform construction design documentation covering all task units was prepared. Breaking down the implementation into several parts would entail significant additional coordination, implementation, technical and guarantee risks, so their separation is unreasonable from the point of view of the successful implementation of the investment and increases the cost and time required for the investment. The realisation of the parts of the work under separate contracts would make the coordination of…
Show full description
… project performance significantly more complex, resulting in technically critical situations during the on-site organization on many points. Splitting into lots would not result in truly independent workflows, but would create contractual performances that work closely with each other, the spatial and temporal coordination and scheduling of which – in line with the schedule to be issued during the bidding phase – would require additional resources, continuously increased Customer and Entrepreneur control, and additional organization, the cost implications of which would make the implementation of the investment more expensive and result in significant interface risk. More detailed justification due to character limitation can be found in the participation documentation. · Complete general construction of the project elements of the New Museum of Transportation as follows: 1. Main building: Head building, Diesel hall, New hall – basic task 2. Aspiration House of Culture – Optional Task 1 3. Construction of small buildings (Small campus) – Option 2 The development will be implemented on an area of 78,383 m2, of which 31,060 m2 will be installed. The total net usable floor area of the planned buildings is 63,814 m2, the majority of which, 58,395 m2, consists of the Main Building – connected by the Diesel Hall, the New Hall and the Head Building, which is to be renovated in a complex way. The remaining floor area consists of the “Törekvés” building (3.581 m2) and, according to the building permit, the “Small Campus” or “Small Buildings” buildings (together 2.796 m2), Café 34, community workshop building 51, Cold War shelter 90 and building 94. The functional design of the Main Building is based on a balance between the basic tasks of the museum and the needs of the audience. The permanent exhibition presenting large, object-like artworks is approximately 12,200 m2, the temporary exhibitions are 1,400 m2, and the event spaces are given an area of 5,400 m2. The collections are housed on an order of magnitude of 6,800 m2 of artefacts and 3,450 m2 of library and archive storage space, while the restoration workshops operate on 2,200 m2 and the offices on 3,000 m2. The service, engineering and technical areas required for operation occupy 9.750 m2, and the roadways and parking functions occupy 12.400 m2. The main goal of the landscape architectural concept is to create a family-friendly, experience-based museum park. As part of this, open-air exhibitions, a playground with a transport theme, a museum pedagogical garden with a small motorway, a garden railway, picnic areas, a café with a garden, and a water surface suitable for swimming in small boats will be established. During the development, a total of 13,000 m2 of green space will be created, complementing cultural functions with a high-quality recreational environment. The project’s sustainability concept aims to achieve LEED Gold certification, ensuring a high level of energy efficiency, environmental performance, and sustainable operation. The development is based on the complex rehabilitation of a railway brownfield site, where the identified, typically local hydrocarbon contaminations are treated with targeted, local interventions; the degree of contamination is significant, but it is average in an area with such an industrial past
Contract
Type of service
What you must prove — eligibility criteria
P/1. Közbeszerzés tárgyából származó árbevétel P/1. Alkalmatlan a részvételre jelentkező (RJ), közös részvételre jelentkező, ha a felhívás feladását megelőző utolsó három mérlegfordulónappal lezárt üzleti évre vonatkozóan a közbeszerzés tárgyából származó (Épí… read in fullcollapse
M/1. A kiválasztási szempontok felsorolása és rövid ismertetése Az alkalmasság igazolásának módja: Részvételre jelentkezőnek a Kbt. 67. § (1)-(2) bek., valamint a Kr. 1. § (1) bek. szerint az EEKD benyújtásával kell a részvételi jelentkezésében igazolnia, hogy… read in fullcollapse
M/1. alkalmasság min.követelményei M/1. Alkalmatlan a RJ (közös RJ), ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított 8 évben (a jelen felhívás feladásának napjától visszafelé számított 8 év alatt befejezett, de legfe… read in fullcollapse
M/2. A kiválasztási szempontok felsorolása és rövid ismertetése Az alkalmasság igazolásának módja: Részvételre jelentkezőnek a Kbt. 67. § (1)-(2) bek., valamint a Kr. 1. § (1) bek. szerint az EEKD benyújtásával előzetesen a részvételi jelentkezésében igazolnia… read in fullcollapse
Az M/2. alkalmasság minimumkövetelményei: M/2.: Alkalmatlan a részvételre jelentkező, közös részvételre jelentkező, ha nem állnak rendelkezésére legalább az alábbi (teljesítésbe bevonni kívánt) szakemberek: M/2.1. legalább 1 fő projektvezető szakember, aki ren… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ÓBUDA-ÚJLAK Beruházásszervező és Fővállalkozó Zrt. | 1 | 2026 |
| Marp Korlátolt Felelősségű Társaság | 1 | 2026 |
| Fernezelyi Korlátolt Felelősségű Társaság | 1 | 2026 |
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,344 completed awards — not a statement about this procedure.)
This procedure allows 30 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now