How to bid in this country: portals, deadlines, thresholds →
Engineering and architectural services for “hydraulic risk mitigation interventions in the terminal sections of the Bormida di Mallare and Pallare rivers and along the Bormida di Spigno river auction in the municipality of Cairo Montenotte (SV)”, for PFTE and CSP, with option for: construction management - safety coordination in progress
Servizi di ingegneria e architettura per “interventi di mitigazione del rischio idraulico nei tratti terminali dei fiumi bormida di mallare e di pallare e lungo l’asta del fiume bormida di spigno in comune di cairo montenotte (sv)”, per pfte e csp, con opzione per: Direzione lavori - coordinamento della sicurezza in esecuzione — original title
Your path to submission
- Deadline: 5 November at 14:00 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Italian.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
ENGINEERING AND ARCHITECTURE SERVICES FOR “HYDRAULIC RISK MITIGATION INTERVENTIONS IN THE TERMINAL TRACTS OF BORMIDA FIUMS TO MALL AND BALL AND LONG THE AUCTION OF THE BORMIDA DI SPIGNO RIVER IN MUNICIPALITY OF CAIRO MONTENOTTE (SV)”, FOR PFTE AND CSP, WITH OPTION FOR: DIRECTORATE FOR WORK - SECURITY COORDINATION IN IMPLEMENTATION
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 19 bids (26 procedures with a bid count); 4% ended with a single bidder. Sector: median 8 bids.n = 26
- 0% of this buyer's awards went to companies that had already won here before (26 awards since 2021, spread over 25 companies). That is well below the sector norm (14%) — this buyer switches suppliers more often than others.n = 26 awards since 2021
- 4% of awards went to companies from abroad (26 awards with a known winner country). Sector average: 1%.n = 26
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Italian.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Massimiliano Bernini | 1 | 2025 |
| f.lli gallo auto sas di gallo giorgio e c | 1 | 2026 |
| Alessandra Brignola | 1 | 2025 |
| EY ADVISORY | 1 | 2025 |
| Pirene | 1 | 2025 |
Tactics
When contracts were awarded in this country and sector, usually 8 or more bids came in. Many compete here — price and references decide. (Based on 4,596 completed awards — not a statement about this procedure.)
This procedure allows 16 days between publication and deadline — typical in this country is 34 (median of 3,875 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Italy · Architecture & engineering, 108 contracts went to foreign companies over the last 3 years (of 14,715 recorded awards) — mostly from Germany, France, Spain.
Submission language: Italian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now