How to bid in this country: portals, deadlines, thresholds →
Framework agreement for maintenance and routine building investment works for the Société Aéroportuaire Guadeloupe Pôle Caraïbes
Accord-cadre de maintenance et de travaux d'investissement courants de bâtiment pour la Société Aéroportuaire Guadeloupe Pôle Caraïbes — original title
Your path to submission
- Deadline for requests to participate: 4 November at 17:00 — 3 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
This contract for the multi-technical operation and maintenance of SAGPC's buildings, located in the airport area, includes the following services: preventive and corrective maintenance of the installations and equipment covered by the contract (except Lot 7 ); - Diagnosis and permanent technical advice on the condition and development of installations; - Periodic reporting adapted to the management of assets and the requirements of the SAGPC; - the removal of non-conformities resulting from regulatory checks and periodic checks (on the basis of reports drawn up by the SAGPC Control Office); - The carrying out of small improvements and upgrades as defined in this contract. The arrangements for implementing the framework agreement (form of contract, number of holders, thresholds) are set out in the consultation documents. This is an allotment contract for which each lot will be awarded…
Show full description
… separately. Lots 01 to 06: One (1) holder Lot 07: Two (2) Holders Each lot is a separate framework agreement and will result in the conclusion of subsequent contracts and the issuance of purchase orders. The services are paid for by unit and flat-rate prices · Large Works , Structure and heavy facade coverings · Sealing , Cover and Carpentry · This lot includes jealousies , roller shutters, external doors ,etc · This lot includes the maintenance of sanitary facilities (e.g.: redo tile , cleaning and pumping network ,etc. ) · Floor covering ,Walls, Ceiling · This lot includes technical signage · This lot is intended for specific works , involving different bodies of state , and requiring a significant level of coordination
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (16 procedures with a bid count); 0% ended with a single bidder. Sector: median 6 bids.n = 16
- 22% of this buyer's awards went to companies that had already won here before (24 awards since 2024, spread over 11 companies). 78% went to new names.n = 24 awards since 2024
- Not one of the 24 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 24
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| B & M ARCHITECTURE | 2 | 2026 |
| ALYZES AERO SERVICES | 2 | 2025 |
| GUEZ CARAIBES | 2 | 2024–2026 |
| FIRST MAINTENANCE COMPANY ANTILLES | 2 | 2025 |
| WANZL | 2 | 2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 42,545 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now