How to bid in this country: portals, deadlines, thresholds →
TOP Plus Municipal Works II. (F.m.V.)
TOP Plusz önkormányzati munkák II. (F.m.V.) — original title
Your path to submission
- Deadline: 3 November at 14:00 — 8 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The main objective of the project is to establish an axle load and total weight measuring station and a cycle path. The subject-matter of the proceedings shall consist of the following parts: Part 1: Nyíregyháza-Beregsurány main road No. 41 72+600 kmsz, Beregsurány axle load and total weight measuring station Part 2: Creation of a cycle path through the Mureş coast · The main goal of the project is to create a first-order main road No. 41, Nyíregyháza-Beregsurány 72+600 kms, Beregsurány axle load and total weight measuring station. Description of existing status: During the previous construction of the border crossing point, the following were completed for the measuring station on the entry side: - measuring bar with shaft load and total weight balance shaft, - container base for measuring container with height raised from the level of the measuring bar, - protective pipes for utility…
Show full description
… connections. During the previous construction of the border crossing point, no measuring station was built on the exit side. Planned interventions: - widening the enclosure, changing the enclosure level on the exit side, - placing the axle load meter and the bridge weigher shaft on both sides of the enclosure, - connecting utilities (electricity, water, sewage, internet) on both sides, - designing devices for controlling and controlling trucks (signalling lights, scales, cameras, 3D laser scanner, computer system) on both sides. Renovation is an intervention subject to authorisation. Main quantities: On the entry side of the border crossing point: container base widening: 32 m2 container house design (net area) 27 m2 protective roof making in the continuation of the existing (net) 183 m2 traffic light 2 pcs scales axle load and total weight meter 1-1 pcs cameras 12 pcs 3D laser scanner system 1 pcs server 1 pcs workstation 3 pcs computer system 1 pcs utilities connection (electricity, water, sewage, internet) 1-1 pcs On the exit side of the border crossing point: enclosure widening to 11 m, sidewalk 1.5 m next to it, two side benches 1.5 m next to it: Placement of the axle load meter and the weighbridge shaft in the 104 m measuring strip 1-1 balance house design (net area) 50 m2 protective roof making (net area) 288 m2 indicator lights 4 pcs scales axle load and total weight measuring 1-1 pcs0 cameras 15 pcs 3D laser scanner system 1 pcs server 1 pcs workstation 3 pcs computer system 1 pcs utilities connection (current, water, sewage, internet) 1-1 pcs OPTION: On the left side of the main road No. 41 Nyíregyháza – Beregsurány I. according to the sectioning, the paving of the pavement of the road. Planned interventions: - construction of earthworks, - preparation of mechanical stabilization - construction of asphalt pavement - construction of traffic technology AC 8 Hour (N) B 50/70 Layer construction 36,00 m3 Mechanical stabilization pavement foundation construction (M22) 98,00 m3 Mechanical stabilization pavement foundation construction (M63) 198,00 m3 Earthworks F50 upper layer construction from M32 (HK0/32 - M1;X1) 257,00 m3 H3 retention level guide rail construction (single-side, three-row) 408 m Authentic measurement limit for bridge scales (total weight scales): 80 t. Wear an overload of at least 20 tonnes (without any damage) but not less than 100 tonnes. Authentic measurement limit of the dynamic axle load meter: 15 t. Wear an overload of at least 3 tonnes (without any damage) but not less than 18 tonnes. The weighing surface of the weighbridge (total weight balance) shall be 3 m wide and 18 m long horizontal (fitting the existing shaft on the entry side). After the truck stops on the weighing surface, the weighbridge shall be used to measure the total weight of the truck with the accuracy required for certification. The dynamic axle load measuring device shall measure the load on all the axles of the vehicle in contact with the casing during the low speed passage of the truck (maximum 5 km/h) with the accuracy required for certification. The measuring surface of the dynamic axle load measuring device shall be 3 m wide on the entry side (matching the existing shaft) and 3,3 m wide on the exit side. In accordance with Decision No 12/2025. Section 82(1) of Decree No 155/2014 of 8 May 2014 of the Minister for Economy and Transport is applicable: Intuit with short delivery and incorporation times
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (65 awards, most recently March 2026) — by that rhythm the next award was due around May 2026. The last award went to FÖUT-VONAL Forgalomtechnikai Kft.n = 65
- 34% of this buyer's awards went to companies that had already won here before (835 awards since 2018, spread over 200 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 835 awards since 2018
- The median procedure drew 3 bids (786 procedures with a bid count); 21% ended with a single bidder. Sector: median 5 bids.n = 786
- 10% of awards went to companies from abroad (835 awards with a known winner country). Sector average: 4%.n = 835
- The award came in at a median 51% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
Valamennyi rész tekintetében: M.1. Alkalmatlan Ajánlattevő, ha nem rendelkezik a felhívás feladásától visszafelé számított 5 évben befejezett, de legfeljebb 8 éven belül megkezdett, sikeres műszaki átadás-átvétellel lezárt, az előírásoknak és a szerződésnek me… read in fullcollapse
M.2. Alkalmatlan Ajánlattevő, ha nem rendelkezik a feladat ellátásához szükséges alábbi szakemberekkel: Az 1. rész vonatkozásában: M.2.1.: legalább 1 fő szakemberrel, aki rendelkezik a 266/2013. (VII. 11.) Korm. rendelet szerinti „MV-É” (vagy azzal egyenértékű… read in fullcollapse
Valamennyi rész tekintetében: M.1. Alkalmatlan Ajánlattevő, ha nem rendelkezik a felhívás feladásától visszafelé számított 5 évben befejezett, de legfeljebb 8 éven belül megkezdett, sikeres műszaki átadás-átvétellel lezárt, az előírásoknak és a szerződésnek me… read in fullcollapse
M.2. Alkalmatlan Ajánlattevő, ha nem rendelkezik a feladat ellátásához szükséges alábbi szakemberekkel: Az 1. rész vonatkozásában: M.2.1.: legalább 1 fő szakemberrel, aki rendelkezik a 266/2013. (VII. 11.) Korm. rendelet szerinti „MV-É” (vagy azzal egyenértékű… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Colas Út Építőipari Zártkörűen Működő Részvénytársaság | 12 | 2023–2026 |
| SPECIÁLTERV Építőmérnöki Korlátolt Felelősségű Társaság | 11 | 2023–2026 |
| UTIBER Közúti Beruházó Kft | 11 | 2023–2026 |
| "Soltút" Útépítő, Fenntartó és Kereskedelmi Korlátolt Felelősségű Társaság | 11 | 2023–2026 |
| Via Futura Mérnöki, Tanácsadó és Szolgáltató Kft. | 10 | 2023–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 65 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 30 (median of 593 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now