How to bid in this country: portals, deadlines, thresholds →
‘Modular metal bridge for emergency response’
„Pod metalic modular pentru interventii in cazul situatiilor de urgenta” — original title
Your path to submission
- Deadline: 23 November at 15:00 — 22 days left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Offer and evidence in: Romanian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The acquisition of a relocable modular metal bridge is essential for C.N.A.I.R. – S.A., aiming to ensure the continuity of road traffic and increase the capacity for operational intervention in situations where the existing infrastructure is affected by degradation, natural phenomena, accidents, traffic restrictions or requires rehabilitation and consolidation works. The description of the product is available in the Specifications of this tender documentation. The contracting authority reserves the right to modify the contract in accordance with Article 221 of Law 98/2016, provided that these modifications do not fall within the provisions of Article 221(7) of Law 98/2016, i.e. they do not represent a substantial modification. Information on the revision clauses (CONFORM ART. 221, ALIN. 1 LIT. A OF LAW NO. 98/2016) can be found in the Supply - Model Contract. Deadlines for…
Show full description
… submission/response to requests for clarifications/additional information: In accordance with the provisions of Article 160(1) of Law No 98/2016, as amended, the deadline for any interested economic operator to request clarifications or additional information in relation to the tender documentation is a maximum of 18 days before the deadline for submission of tenders. B. In accordance with the provisions of Article 161(1) of Law No 98/2016, as amended, the deadline by which the contracting authority will respond clearly and completely to all requests for clarification/additional information is on the 11th day before the deadline set for the submission of tenders. *Any request for clarification submitted after the date mentioned in point A) will make it impossible for the contracting authority to provide a reply within the deadline mentioned in point B) and as a result any request for clarification within the mentioned deadlines will be considered late. · The requested product belongs to the category of modular metal structures intended to ensure the continuity of road traffic and operational interventions on road infrastructure, according to the provisions of the legislation and technical regulations applicable in the field of bridges and artworks. The relocating modular metal bridge must allow for the rapid completion of a temporary crossing for heavy road traffic, using a reusable, removable and relocable modular structure capable of ensuring the safe and continuous operation of road traffic. The structure shall allow assembly using commonly available machinery on the market and shall include all equipment and accessories necessary for putting the bridge into service. The bridge shall be capable of running on a minimum of two lanes of traffic and shall ensure a minimum load-bearing capacity of 50 tonnes.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (136 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to ANTREPRIZA DE REPARATII SI LUCRARI A R L CLUJ.n = 136
- The median procedure drew 7 bids (740 procedures with a bid count); 9% ended with a single bidder. Sector: median 3 bids.n = 740
- 82% of this buyer's awards went to companies that had already won here before (836 awards since 2021, spread over 77 companies). 18% went to new names.n = 836 awards since 2021
- The award came in at a median 92% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 13
- 72% of the bids received came from small and medium-sized enterprises (659 procedures with a bid mix). Sector: 89%.n = 659
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Op. ec. ce depun oferta trebuie sa dovedeasca o forma de inregistrare in conditiile legii din tara de rezidenta, din care sa reiasa ca operatorul economic este legal constituit, ca nu se afla in niciuna dintre situatiile de anulare a constituirii precum si fap… read in fullcollapse
Cifra de afaceri medie anuala a ofertantului pe ultimii 3 ani (2023, 2024, 2025) trebuie sa fie in valoare de minim: • 10,972,300.50 lei. Nota 1: Daca un grup de operatori economici depune o oferta comuna, cerinta se demonstreaza prin luarea in considerare a r… read in fullcollapse
Ofertantul trebuie sa demonstreze ca a furnizat in ultimii 3 ani produse de natura si complexitate similara/comparabila cu cele supuse procedurii de atribuire, in valoare cumulata de minim: 3,657,433.50 lei fara TVA. În cazul în care autoritatea/entitatea cont… read in fullcollapse
Ofertantul va preciza partea/partile din contract pe care intentioneaza sa o/le subcontracteze. In cazul in care Ofertantul va subcontracta o parte din Acordul cadru, Ofertantul are obligatia de a completa, DUAE- sectiunea "Criteriile de selectie" - pct. C "Ca… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| VIAROM CONSTRUCT | 72 | 2023–2026 |
| DRUM CONSTRUCT | 58 | 2023–2026 |
| ANTREPRIZA DE REPARATII SI LUCRARI A R L CLUJ | 56 | 2023–2026 |
| DIFERIT AG | 54 | 2023–2026 |
| FLOREA GRUP | 51 | 2023–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 133 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 33 (median of 2,802 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Romania · Construction materials, 30 contracts went to foreign companies over the last 3 years (of 257,582 recorded awards) — mostly from Germany, Italy, France.
Submission language: Romanian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now