How to bid in this country: portals, deadlines, thresholds →
A630 – Rehabilitation of the 4C interchange
A630 – Réhabilitation de l’échangeur 4C — original title
Your path to submission
- Deadline: 2 November at 12:00 — 1 day left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Carrying out the following work: earthworks, pavements, sanitation maintenance (collection system and spreading basin), equipment, signage and installation of public lighting on all the straps of the interchange, part of the running section of the ring road and part of the boulevard Aliénor d’Aquitaine. The market includes one firm tranche and three optional tranches. · Rehabilitation of the 4C interchange on the A630 by carrying out the following works: earthworks, pavements, sanitation maintenance (collection system and spreading basin), equipment, signage and installation of public lighting on all the straps of the interchange, part of the running section of the ring road and part of the boulevard Aliénor d’Aquitaine.
Contract
Type of service
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SARL PALARD | 1 | 2017 |
| SARP SUD-OUEST | 1 | 2017 |
| ADS SARL | 1 | 2017 |
| BERNARD DEPANNAGE | 1 | 2017 |
| STAVI AQUITAINE | 1 | 2017 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 42,545 completed awards — not a statement about this procedure.)
This procedure allows 14 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now