How to bid in this country: portals, deadlines, thresholds →
Preparation of the STEŚ project documentation for the task entitled ‘Extension of national road No 44 on the section Oświęcim - Zaborze - Oświęcim (preparatory process)’
Opracowanie dokumentacji projektowej STEŚ dla zadania pn.: „Rozbudowa drogi krajowej nr 44 na odcinku Oświęcim - Zaborze - Oświęcim (proces przygotowawczy)" — original title
Your path to submission
- Deadline: 6 November at 11:15 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject-matter of the contract is the studies to be carried out under the contract entitled ‘Development of STEŚ project documentation for the task: ‘Extension of national road No 44 on the section Oświęcim - Zaborze - Oświęcim (preparatory process)’, from approx. 56+300 to km approx. 58+500, including the Environmental Determination Decision (ECD). The investment will be carried out in the footsteps of the existing national road No. 44 with a possible sectional new route, e.g. from the intersection of DK44 with ul. Porębska for a new inclusion in ul. of the factory. The design documentation shall include the contacts of the reconstructed section and the design link. The contractor should analyse the cross-section of existing roads. Check the possibility of its expansion to 2x2, which should be confirmed by the necessary calculations. The scope of preparation of documentation at the…
Show full description
… STEŚ stage includes in particular: (a) analysis of starting materials, collection and analysis of archival materials and performance of measurements, studies, calculations and expert opinions, (b) preliminary determination of the material and financial scope of the project and determination of its effectiveness, (c) development of traffic analysis and forecast. The Contractor will ask the Strategy and Studies Department at the Headquarters of GDDKiA for input data and guidelines for the implementation of the AiPR, (d) drawing up a map for the development of the STEŚ (e) developing variants for the reconstruction (possibly) of the road extension and determining the types and basic technical parameters of construction works, (f) performing a geotechnical survey programme for SGI (g) recognising geological conditions – preparing a geological and engineering study, (h) preparing and approving the Project of geological works and hydrogeological documentation (i) performing natural observations and/or nature inventories, (j) performing environmental analyses, (k) clarifying the material and financial scope by establishing detailed geometric solutions for roads, road constructions of engineering structures, field boundaries of the investment task and the measurement of works and their cost estimate for the key elements of the project for the proposed variants, (l) preparing the BRD Opinion, preparing materials for the BRD audit and materials taking into account the results of the BRD audit (m) carrying out a multi-criteria analysis enabling the Contracting Authority to select the most advantageous technical options for further implementation, the Contractor will agree on the criteria and weights with the Contracting Authority (n) providing information for making an initial investor decision on the selection of the preferred option by the Contractor, as well as on the appropriateness, scope and time horizon for the implementation of the investment task, (o) participating in a meeting of the IPO, preparing materials for submitting an SPC application for the preferred option selected at the meeting of the IPO, (p) obtaining an SPC. This is the basic scope. The contracting authority provides for the possibility of applying the option. The subject of the contract in the optional scope, i.e. to the extent that the Contractor may be commissioned to perform under the option right, includes the preparation of a report on the impact of the project on the environment - which is part of TER ETAP II. Details of the options are included in the PPU (TOM II SWZ). · The subject of the contract are the studies to be carried out under the contract entitled: ‘Development of STEŚ project documentation for the task: ‘Extension of national road No 44 on the section Oświęcim - Zaborze - Oświęcim (preparatory process)’, from approx. 56+300 to km approx. 58+500, including the Environmental Determination Decision (ECD). The investment will be carried out in the footsteps of the existing national road No. 44 with a possible sectional new route, e.g. from the intersection of DK44 with ul. Porębska for a new inclusion in ul. of the factory. The design documentation shall include the contacts of the reconstructed section and the design link. The contractor should analyse the cross-section of existing roads. Check the possibility of its expansion to 2x2, which should be confirmed
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (286 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to RG Projekt Radosław Gwiazda.n = 286
- 33% of this buyer's awards went to companies that had already won here before (1,302 awards since 2015, spread over 737 companies). 67% went to new names.n = 1,302 awards since 2015
- The median procedure drew 4 bids (967 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 967
- The award came in at a median 85% of the estimated value (116 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 116
- 5% of awards went to companies from abroad (1,302 awards with a known winner country). Sector average: 0%.n = 1,302
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.
What you must prove — eligibility criteria
[posiadanie środków finansowych] Wykonawca musi wykazać posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 200.000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego Wykonawca przeliczy w… read in fullcollapse
[Doświadczenie Wykonawcy] Wykonawca musi wykazać się wiedzą i doświadczeniem w opracowaniu, w okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, co najmniej 1 (jednej) z dokumen… read in fullcollapse
Wykonawca musi wskazać osoby, które będą uczestniczyć w wykonywaniu zamówienia, legitymujące się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jakie zostaną im powierzone. Wykonawca, na każdą funkcję wymienioną poniżej, wskaże osoby, któr… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ZABERD Sp. z o.o. | 18 | 2024–2026 |
| Budimex S.A. | 17 | 2023–2026 |
| ELEKTROTIM S.A. | 14 | 2022–2024 |
| KM MANAGEMENT GROUP sp. z o.o. | 11 | 2024–2026 |
| InQubator Sp. z o.o. | 11 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 231 completed awards — not a statement about this procedure.)
This procedure allows 18 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
Foreign bidders
In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,650 recorded awards) — mostly from Germany, France, Switzerland.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now