Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

New procurement of three identical hot water generators for the Altglienicke site

Neubeschaffung von drei baugleichen Heißwassererzeuger für den Standort Altglienicke — original title

DEGermany · Berlin

Your path to submission

  1. Deadline for requests to participate: 16 November at 23:59 — 16 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
  2. You submit on Deutsche eVergabe — not here and not by e-mail. ↗
  3. Offer and evidence in: German.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Please refer to invitation to tender No 2026005425 for a similar type of procurement. At the site of HW Altglienicke, the three identical hot water generation systems HWE 3, 4 and 5 must be replaced by almost performance-identical new systems as large-capacity boilers (according to EN 12953). HWE 3 and 4 are currently still in operation only HWE 5 has not been operated for several years and is permanently out of operation. In order not to endanger or further restrict the security of supply at the site, a step-by-step procedure for the replacement of first HWE 5 and subsequently HWE 4 and then HWE3 is absolutely necessary. The three new hot water generators to be built are to be connected to a new three-pronged chimney by means of new flue gas ducts. The existing flue gas duct (mostly bricked) is to be dismantled and the outer wall of the boiler house is to be opened and closed again…

Show full description

… after completion of the work. The scope of the invitation to tender includes all services necessary for the replacement of the hot water generators described at the outset with ready-to-use new systems. This includes the planning and detailed engineering (construction, mechanics and electrical/control technology), the dismantling of existing old systems (including the removal of fault edges), the supply, assembly and piping (water and smoke gas side) of the new boilers and the chimney including the equipment necessary for operation (measurement technology, fittings, pumps, gas control section, boiler control cabinet, etc.) as well as the commissioning of the boilers. All newly installed components shall be easily accessible in terms of their operating and maintenance areas, or shall be easily accessible or operable. Should steel construction platforms/podeste be rebuilt or newly necessary for this purpose, this is also within the scope of services of the Contractor. Compliance with all valid guidelines, laws, regulations and standards is assumed for the scope of services described above.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeSupplies
Estimated valuevalue not published
Published19 Oct 2026
ProcedureNegotiated procedure with prior publication
Contract period5 Jul 2027 → 5 Jul 2028
Place of performanceBerlin

Type of service

42 · Industrial machinery
CPV 42160000

Clement What the numbers say about this buyer

  • 50% of this buyer's awards went to companies that had already won here before (51 awards since 2025, spread over 24 companies). That is well above the sector norm (37%) — newcomers have a harder time here than elsewhere.n = 51 awards since 2025
  • 24% of awards went to companies from abroad (51 awards with a known winner country). Sector average: 3%.n = 51
  • From notice to award takes a median 206 days here (16 procedures). Sector: 69 days.n = 16
  • The award came in at a median 80% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 99%.n = 6
  • The median procedure drew just one bid (48 procedures with a bid count); 52% ended with a single bidder. Sector: median 1 bid.n = 48

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
In comparable contracts in this sector nationwide (6,656 with a known bid count), usually only a single offer came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

What you must prove — eligibility criteria

›
Other economic requirement
Die Eignungskriterien finden Sie unter nachfolgendem Link. Diese müssen nicht ausschließlich auf die angegebene Kategorie zutreffen, sondern können auch für weitere gelten. https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/subproject/551921ac-cd4d-4e89-bcf7-5288f6fa8e5c/suitabilitycriteria
›
Security/guarantee required
Requirement texts are quoted in the notice's original language — only the official wording is binding.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
DATAGROUP Business Solutions GmbH - Berlin42025–2026
ARKTIS it solutions GmbH32025
IBAR Systemtechnik GmbH · Cottbus32025
Sweco GmbH22026
Technidata IT-Service GmbH · Markdorf22026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

8
2025
2
2026
10 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 16 November at 23:59
Deadline for requests to participate

Tactics

When contracts were awarded in this country and sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 6,656 completed awards — not a statement about this procedure.)

This procedure allows 29 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Germany · Industrial machinery, 230 contracts went to foreign companies over the last 3 years (of 6,872 recorded awards) — mostly from Switzerland, Italy, France.

Submission language: German.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 3 portals
Bids are submitted on Deutsche eVergabe — TED carries the same notice, usually with the more detailed specification. Read both.
Put together the evidence — in German
The criterion on the left, plus your price.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now