How to bid in this country: portals, deadlines, thresholds →
Uninterruptible unit battery replacement Phase II
Szünetmentes egység akkumulátor csere II. ütem — original title
Your path to submission
- Deadline: 13 November at 14:00 — 12 days left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Uninterruptible unit battery replacement Phase II The detailed technical specifications are included in the procurement documents. · Uninterruptible unit battery replacement Phase II – Part 1 Quantity: ABB Conceptpower DPA250 (ANSII UPSA+B) - Design of a new battery locker (electrically dimensioned) to fit the design of the new 4th battery circuit, customer approval, production and installation with the design of the associated cabling. The new battery locker must comply with the relevant legislation and the regulations of the Chamber of Engineers. The contractor is responsible for dismantling the existing insurance cabinet and storing it in an area designated by the Contracting Authority (at HC’s headquarters). - Purchase and installation of new scaffolding suitable for the battery pack (certification of the suitability of the scaffolding is the responsibility of the winning bidder).…
Show full description
… The dismantling and removal of existing scaffolding is the responsibility of an entrepreneur. - It is necessary to connect a scaffold to the EPH network. - Installation of a battery type with a nominal capacity of 180 Ah that meets the requirements set out in the technical specifications – 200 pieces of FIAMM 12FIT180 (126x558x321 mm in size), as well as the related warranty repair work, installation, testing, calibration work, preparation of the necessary safety measurements and reports during the warranty period. - Replacement of block connectors. - Checking and recalibrating the UPS battery charging unit with manufacturer service software. - Load measurement and monitoring of the new battery circuit. - Thermal inspection of the connections of the new battery circuit under load (thermal-camera inspection). - Required electrical safety measurements. - The contractor is responsible for the removal and further utilization of the dispensed used batteries. - Preparation of protocols required by standards (EBF, etc.). The detailed technical specifications are set out in the procurement documents. The contracting authority draws attention to the fact that where reference is made to a product of a specific make, reference is made to Government Decree No 321/2015. In accordance with Section 46(3) and (5) of the Government Decree, the Contracting Authority also accepts an equivalent offer there. · Uninterruptible unit battery replacement Phase II – Part 2 Quantity: ABB Newave UpScale ST40 (BUD SMR1-2) - Installation of a type of battery with a nominal capacity of 9Ah that meets the requirements set out in the technical specifications – 160 YUASA SW280 (151x65x97.5 mm in size) and during the warranty period the related warranty repair work, installation, testing, calibration work, preparation of the necessary safety measurements and reports. - Replacement of block connectors. - Checking and recalibrating the UPS battery charging unit with manufacturer service software. - Load measurement and monitoring of the new battery circuit. - Thermal inspection of the connections of the new battery circuit under load (thermal-camera inspection). - Required electrical safety measurements. - The contractor is responsible for the removal and further utilization of the dispensed used batteries. - Preparation of protocols required by standards (EBF, etc.). - ABB Newave UpScale ST80 (TAR1 UPS3) - Installation of a type of battery with a nominal capacity of 9Ah that meets the requirements set out in the technical specifications – 80 YUASA SW280 (151x65x97.5 mm in size) and during the warranty period the related warranty repair work, installation, testing, calibration work, preparation of the necessary safety measurements and reports. - Replacement of block connectors. - Checking and recalibrating the UPS battery charging unit with manufacturer service software. - Load measurement and monitoring of the new battery circuit. - Thermal inspection of the connections of the new battery circuit under load (thermal-camera inspection). - Required electrical safety measurements. - The contractor is responsible for the removal and further utilization of the dispensed used batteries. - Required by standards
Contract
Type of service
Clement What the numbers say about this buyer
- 14% of this buyer's awards went to companies that had already won here before (131 awards since 2018, spread over 32 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 131 awards since 2018
- 35% of awards went to companies from abroad (131 awards with a known winner country). Sector average: 5%.n = 131
- The median procedure drew just one bid (123 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 123
- 68% of the bids received came from small and medium-sized enterprises (50 procedures with a bid mix). Sector: 85%.n = 50
- 10% of the bids received came from other countries (50 procedures with a bid mix) — all bidders, not just the winners. Sector: 6%.n = 50
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
M/1. Alkalmatlan az ajánlattevő, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított három évben (36 hónapban) befejezett, de legfeljebb hat éven (72 hónapon) belül megkezdett, legalább 150 db, egyenként legalább 180Ah n… read in fullcollapse
M/2. Alkalmatlan az ajánlattevő, ha nem rendelkezik legalább 2 fő villanyszerelő szakemberrel, akik rendelkeznek a 4/2021. (VII. 26.) ITM rendelet 1. mellékletében foglalt táblázat 97. sora szerinti kisfeszültségű energiatároló akkumulátor telep FAM szerelő (0… read in fullcollapse
M/1. Alkalmatlan az ajánlattevő, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított három évben (36 hónapban) befejezett, de legfeljebb hat éven (72 hónapon) belül megkezdett, legalább 160 db, egyenként legalább 9Ah név… read in fullcollapse
M/2. Alkalmatlan az ajánlattevő, ha nem rendelkezik legalább 2 fő villanyszerelő szakemberrel, akik rendelkeznek a 4/2021. (VII. 26.) ITM rendelet 1. mellékletében foglalt táblázat 97. sora szerinti kisfeszültségű energiatároló akkumulátor telep FAM szerelő (0… read in fullcollapse
M/1. Alkalmatlan az ajánlattevő, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított három évben (36 hónapban) befejezett, de legfeljebb hat éven (72 hónapon) belül megkezdett, legalább 70 db, egyenként legalább 180Ah né… read in fullcollapse
M/2. Alkalmatlan az ajánlattevő, ha nem rendelkezik legalább 2 fő villanyszerelő szakemberrel, akik rendelkeznek a 4/2021. (VII. 26.) ITM rendelet 1. mellékletében foglalt táblázat 97. sora szerinti kisfeszültségű energiatároló akkumulátor telep FAM szerelő (0… read in fullcollapse
M/1. Alkalmatlan az ajánlattevő, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított három évben (36 hónapban) befejezett, de legfeljebb hat éven (72 hónapon) belül megkezdett, legalább 70 db, egyenként legalább 180Ah né… read in fullcollapse
M/2. Alkalmatlan az ajánlattevő, ha nem rendelkezik legalább 2 fő villanyszerelő szakemberrel, akik rendelkeznek a 4/2021. (VII. 26.) ITM rendelet 1. mellékletében foglalt táblázat 97. sora szerinti kisfeszültségű energiatároló akkumulátor telep FAM szerelő (0… read in fullcollapse
M/1. Alkalmatlan az ajánlattevő, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított három évben (36 hónapban) befejezett, de legfeljebb hat éven (72 hónapon) belül megkezdett, legalább 33 db, egyenként legalább 96Ah név… read in fullcollapse
M/2. Alkalmatlan az ajánlattevő, ha nem rendelkezik legalább 2 fő villanyszerelő szakemberrel, akik rendelkeznek a 4/2021. (VII. 26.) ITM rendelet 1. mellékletében foglalt táblázat 97. sora szerinti kisfeszültségű energiatároló akkumulátor telep FAM szerelő (0… read in fullcollapse
M/1. Alkalmatlan az ajánlattevő, ha nem rendelkezik az eljárást megindító felhívás feladásának napjától visszafelé számított három évben (36 hónapban) befejezett, de legfeljebb hat éven (72 hónapon) belül megkezdett, legalább 100 db, egyenként legalább 9Ah név… read in fullcollapse
M/2. Alkalmatlan az ajánlattevő, ha nem rendelkezik legalább 2 fő villanyszerelő szakemberrel, akik rendelkeznek a 4/2021. (VII. 26.) ITM rendelet 1. mellékletében foglalt táblázat 97. sora szerinti kisfeszültségű energiatároló akkumulátor telep FAM szerelő (0… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Xcopy Kereskedelmi és Szolgáltató Kft. | 5 | 2023–2026 |
| THALES LAS France SAS | 4 | 2023–2025 |
| Telekom Rendszerintegráció Zártkörűen Működő Részvénytársaság | 3 | 2023–2026 |
| ZAVAROVALNICA TRIGLAV, d.d. | 3 | 2025–2026 |
| EIZO Technologies GmbH · Wolfratshausen | 2 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 452 completed awards — not a statement about this procedure.)
This procedure allows 29 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Electrical machinery, 17 contracts went to foreign companies over the last 3 years (of 450 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now