Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Extension of provincial road No 574 from km 13+070 to km 14+581 in Waliszew, Szczawin Kościelny – procedure No 150/26

Rozbudowa drogi wojewódzkiej nr 574 od km 13+070 do km 14+581 na terenie m. Waliszew, gm. Szczawin Kościelny – nr postępowania 150/26 — original title

PLPoland · Warszawa

Your path to submission

  1. Deadline: 6 November at 08:00 — 5 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Polish.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1.The subject of the contract is the extension of provincial road No 574 from km 13+070 to km 14+581 in the area of Waliszew, Szczawin Kościelny – procedure No 150/26. A detailed description of the subject-matter of the contract can be found in the Tender Documentation (Part IV of the Terms of Reference), in the Works Quantity - made available only by way of illustration (Part V of the Terms of Reference) and in the Quotation Estimates (with regard to the disposal of destruction containing exceeded permissible standards for the content of polycyclic aromatic hydrocarbons - Part VI of the Terms of Reference). The contractor must calculate the value of the works on the basis of the attached design documentation, on the basis of the quantity of asphalt destruction to be disposed of indicated in the GTC, the detailed technical specifications, the general terms and conditions of the contract…

Show full description

… for the execution of the works. 3.The Contractor is obliged to ensure, at his own expense, safe conditions for road and pedestrian traffic in the area of the works covered by the contract on the basis of the traffic organisation project, "for the time of construction" drawn up by and at the expense of the Contractor. The Contractor shall be obliged to update the design of the permanent traffic organisation. 4.In the case of indicating in the description of the subject of the contract trademarks, patents or origin, source or specific process that characterizes the product or services provided by a specific contractor, the Ordering Party accepts equivalent solutions. 5.When reference is made in the description of the subject of the contract to standards, European technical assessments, approvals, technical specifications and technical reference systems, the Ordering Party shall accept solutions equivalent to those described. 6.The Contractor is obliged to transfer the copyright to the photographic and film documentation referred to in the general terms and conditions of the contract for the execution of construction works. 7.The contracting authority shall provide for the award of the contracts referred to in Article 214(1) CTMR. 1 point 7 of the Public Procurement Law up to a total net value of PLN 8 786 312.15. A similar contract shall provide for the execution of: - preparatory works, - demolition works, - earthworks, - ground reinforcement, - drainage of the road body - foundations, - surfaces, - finishing works, - traffic safety devices, - street elements, - works in the telecommunications industry, - works in the electricity industry, - works in the field of rainwater and sanitary sewerage, - works in the field of water supply and pipelines, - works in the field of greenery management, - works in the field of traffic organization and BRD. The above-mentioned works concern the section on which the construction works will be carried out and/or adjacent sections. 8. The Contractor is obliged to have a third party liability insurance policy for damage caused during the performance of the contract and to third parties for the entire duration of the contract and for a guarantee amount not less than PLN 10,000,000.00. 1) The Contractor is obliged to provide a copy of the above policy within 7 days from the date of conclusion of the contract. Provided that the continuity of insurance is maintained, the Ordering Party allows for the possibility of presenting several policies confirming the possession of third party liability insurance during the term of the contract. 2) The Contractor is obliged to provide the Ordering Party with a copy of the next policy within 7 days from the expiry of the previous policy. If the Contractor fails to comply with the above, the Contracting Authority shall charge the Contractor contractual penalties in the amount specified in the contract. 3) If the policy is not submitted within 30 days from the date of conclusion of the contract, the Ordering Party shall have the right to withdraw from the contract. 9. Deadline for performance of the contract: 12 months from the date of signature of the contract, including: - 10 months from the date of signing the contract – the date of completion of the works; - up to 12 months from the date of signing the contract - the date of completion of the subject of the contract. The Contractor shall comply with the following fixed milestones for the execution of the works and the order in which they are to be carried out: Milestone I – execution of works (confirmed by a partial acceptance protocol) with a value of n

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published16 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45233120 · 45230000 · 45233220

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (952 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to Mariusz Gorsiak MAR-MAR.n = 952
  • 62% of this buyer's awards went to companies that had already won here before (1,627 awards since 2015, spread over 516 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 1,627 awards since 2015
  • The median procedure drew 6 bids (333 procedures with a bid count); 5% ended with a single bidder. Sector: median 5 bids.n = 333
  • 100% of the bids received came from small and medium-sized enterprises (59 procedures with a bid mix). Sector: 84%.n = 59
  • 2% of awards went to companies from abroad (1,627 awards with a known winner country). Sector average: 0%.n = 1,627

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
STRABAG Sp. z o.o.732021–2026
Przedsiębiorstwo Robót Drogowo – Budowlanych S.A.562021–2026
Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o.552021–2025
COLAS Polska Sp. z o.o.382020–2026
BUDROMOST-STARACHOWICE” Sp. z o.o.342021–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

78
2021
130
2022
161
2023
224
2024
226
2025
159
2026
978 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 6 November at 08:00

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 52 completed awards — not a statement about this procedure.)

This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Submission language: Polish.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Polish
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now