How to bid in this country: portals, deadlines, thresholds →
Elementary school Štípa canteen extension - construction work
ZŠ Štípa přístavba jídelny - stavební práce — original title
Your path to submission
- Deadline: 16 November at 10:00 — 15 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of this public contract is construction work consisting mainly in the construction of a new canteen and kitchen for the elementary school, which will be operationally connected to the existing school building by a connecting neck. The extension of the building of the new dining room is a partially basement, single-storey building covered by a flat roof, from which two gable roofs protrude. The location of the mass of the new building respects and uses the existing terrain. The canteen building is separately accessible from the adjacent terrain and at the same time is connected to the interior of the existing school with a connecting neck for pedestrians. Entrances from the outdoor area are separately for diners, staff, supplies. There are technical entrances to the underground floor. The supporting structure of the dining room extension consists of a reinforced concrete…
Show full description
… skeleton with a walled outer shell in combination with a structure made of wooden glued frames in the dining hall area. The perimeter structures of the basement part of the dining room consist of a concrete bath, the foundations are a combination of footings on piles and reinforced concrete waists. The building of the canteen extension will be connected to the distribution of drinking water and gas from the existing school building. The addition of the canteen building also includes e.g. health technology, internal gas pipeline, heating, air conditioning and in some parts also air conditioning, heavy and low-current distribution, Measurement and regulation. The operation of the canteen extension is operationally connected with the operation of the primary school.
Contract
Type of service
Clement What the numbers say about this buyer
- 23% of this buyer's awards went to companies that had already won here before (141 awards since 2015, spread over 61 companies). That is well below the sector norm (75%) — this buyer switches suppliers more often than others.n = 141 awards since 2015
- In this sector the buyer awards roughly every 2 months (6 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to POZIMOS, a.s.n = 6
- The median procedure drew 2 bids (108 procedures with a bid count); 38% ended with a single bidder. Sector: median 5 bids.n = 108
- 98% of the bids received came from small and medium-sized enterprises (55 procedures with a bid mix). Sector: 76%.n = 55
- The award came in at a median 88% of the estimated value (30 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 30
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Vodafone Czech Republic a.s. | 12 | 2023 |
| IMPROMAT-COMPUTER s.r.o. | 4 | 2015–2025 |
| Miroslav Čada | 3 | 2026 |
| FC Zlín, a. s. | 3 | 2024–2026 |
| Berani Zlín, s.r.o. | 3 | 2022–2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 4 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Czechia · Construction work, 143 contracts went to foreign companies over the last 3 years (of 16,823 recorded awards) — mostly from Germany, Poland, France.
Submission language: Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now