How to bid in this country: portals, deadlines, thresholds →
Project BG16FFPR003-2.006-0132-C01 "Integrated investments in the new generation - for educated, active and working young people in the region"
„Текущ ремонт на ул"Индустриална", гр. Сливен, финансиран по проект BG16FFPR003-2.006-0132-C01 „Интегрирани инвестиции в новото поколение - за образовани, активни и работещи в региона млади хора“ — original title
Your path to submission
- Deadline: 13 November at 23:59 — 13 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Offer and evidence in: Bulgarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
"Current renovation of Industrialna Street, Sliven, financed under project BG16FFPR003-2.006-0132-C01 "Integrated investments in the new generation - for educated, active and working young people in the region". Industrialna Street in the town of Sliven in Sliven district is planned for intervention. ‘Industrial zone’, Cadastral numbers: 67338.605.188 and 67338.180.23. Approximate length: 4740 m The activities set for implementation are according to the attached quantitative accounts and include the following types of works: I. PREPARATIONAL WORKS 1. Cutting of asphalt concrete pavement up to 10 cm thick with fugorez – 80.00 m. 2. Milling of asphalt concrete pavement, including transport – 536.00 m3. 3. Breaking of asphalt concrete pavement up to 10 cm, including transport – 37 148.75 m2. 4. Concrete crushing, including transportation – 121.88 m3. 5. Dismantling of concrete curbs,…
Show full description
… including transport – 1,140.00 m 6. Transportation of construction waste up to 10 km – 5 988.51 m3. II. EARTH WORKS 7. Total excavation, including spreading – 10,068.03 m3. 8. Manual excavation in heavy earth soils – 503.40 m3. 9. Excavation for a trench – 1 405.60 m3. 10. Thin trench for curbs – 3 400,00 m. 11. Profiling and sealing of an earthen bed – 44 548.20 m2. 12. Bulk – 10.00 m3. 13. Bulk behind curbs – 170,00 m3. III. Asphalt Works 14. First bituminous spill – 46 114,00 m2. 15. Second bitumen spill – 90 408.00 m2. 16. Delivery and laying on bitumenized basis – 7,348.99 pt. 17. Delivery and laying of loose asphalt concrete – 4,426.94 pt. 18. Delivery and laying of solid asphalt concrete with a thickness of 4 cm – 4 426.94 points IV. ROAD WORKS 19. Delivery, laying and sealing of NCP /0–63/ and all related costs – 11 211,48 m3. 20. Delivery, laying and sealing of NCP /0–40/ and all related costs – 6 917.10 m3. 21. Delivery and laying of concrete B15 – 110.50 m3. 22. Delivery and installation of 15/25 curbs and all related costs – 1 700,00 m. 23. Delivery and installation of concrete strips 10/25/50 and all related costs – 1 700,00 m V. ROAD SIGNS AND MARK 24. Delivery and installation of standard reflective road signs, Class 2, II type size, according to BDS 1517-2020, including all related costs – 44 pcs. 25. Strengthening of standard signs with pipe stands F60, L = 3.5 m, including all related costs – 44 pcs. 26. Delivery and machine laying of horizontal marking of white paint with pearls, according to BDS EN 1871:2021, including all related costs: - continuous lines – 598.00 m2; - broken lines – 22.00 m2; - cross marking – 54,00 m2. VI. TROTOAR CLOTHES 27. Breaking of asphalt concrete pavement up to 10 cm, including transport – 2 280,00 m2. 28. Excavation for sidewalks, including transport – 2 716.00 m3. 29. Profiling and sealing of an earthen bed – 6,800.00 m2. 30. Delivery, laying and sealing of NCP /0–40/ and all related costs – 1 924.00 m2. 31. Delivery and laying of solid asphalt concrete with a thickness of 6 cm – 979.20 pt. 32. Delivery and installation of tactile tiles – 20.00 m2. VII. OTHER 33. Delivery and installation of CAP H2-A-W4 BW+BHR – 144.00 m. 34. Delivery and laying of concrete C25/30 for a facility – 10.00 m3. 35. Delivery and laying of concrete B15 for strengthening underground ducts – 10.00 m3.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (109 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to ГОЛДЪН ИНДЪСТРИ ЕООД.n = 109
- The award came in at a median 51% of the estimated value (27 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 27
- 51% of this buyer's awards went to companies that had already won here before (365 awards since 2017, spread over 143 companies). 49% went to new names.n = 365 awards since 2017
- The median procedure drew 2 bids (318 procedures with a bid count); 35% ended with a single bidder. Sector: median 2 bids.n = 318
- 0% of the bids received came from small and medium-sized enterprises (58 procedures with a bid mix). Sector: 17%.n = 58
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
2.1. Участниците в обществената поръчка следва да са реализирали минимален общ оборот за последните три приключили финансови години в зависимост от датата, на която участникът е създаден или е започнал дейността си в размер на 4 000 000 евро (четири милиона ев… read in fullcollapse
2.2. Участниците в обществената поръчка следва да са реализирали минимален оборот попадащ в обхвата на поръчката, както следва: в размер на 2 000 000 евро (два милиона евро) без ДДС от изпълнение на дейности, сходни с предмета на поръчката, а именно: изпълнени… read in fullcollapse
Участникът следва да разполага със следния ръководно-експертен екип (персонал) за изпълнение на поръчката и работници за СМР, както следва: 3.2.1. Технически ръководител на обекта – притежаващ диплома от акредитирано висше училище с квалификация „строителен ин… read in fullcollapse
Участникът да е изпълнил дейности с предмет и обем идентични или сходни с тези на обществената поръчка. Минимално изискване: Строителни дейности с предмет, идентични или сходни с тези на поръчката, изпълнени през последните 5 (пет) години, считано от датата на… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| БЕРКО-90 - БЕРКОВСКИ С-ИЕ СД | 11 | 2019–2026 |
| СТЕЛИТ 1 ЕООД | 10 | 2019–2026 |
| КЕЙ ЕНД ВИ ООД | 10 | 2018–2026 |
| ПРЕСТИЖ 2004 ЕООД | 9 | 2024–2026 |
| ГЕО - КРИ ЕООД | 8 | 2018–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 100 completed awards — not a statement about this procedure.)
This procedure allows 33 days between publication and deadline — typical in this country is 30 (median of 1,862 procedures). A normal window for this market.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,655 recorded awards).
Submission language: Bulgarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now