How to bid in this country: portals, deadlines, thresholds →
Construction of the Osiek ring road along national road No 79
Budowa obwodnicy Osieka w ciągu drogi krajowej nr 79 — original title
Your path to submission
- Deadline: 18 November at 09:00 — 17 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The investment is located in the Świętokrzyskie voivodship, in the Staszów poviat, in the City and Commune of Osiek. The planned investment starts in km about 218+217 to km about 221+409 of national road 79. The route of the proposed variant runs on flat and wavy terrain. The implementation of the above-mentioned section of the road will enable transit traffic to be carried out bypassing dense buildings located along the existing road. The construction of the Osiek bypass, engineering facilities and acoustic protection, carriageways additional to the service of adjacent areas will improve traffic conditions and increase the level of road safety. The material scope of the task includes: 1) construction of a bypass along national road no. 79 class GP after a new trace - Osieka bypass, 2) reconstruction of existing roads in terms of collision with the bypass, 3) construction of roads other…
Show full description
… than the bypass, including changing the course of existing roads, in order to restore damaged road connections or ensure access to real estate, 4) construction of additional roads, located in the road lane of the bypass 5) construction of infrastructure for pedestrians, 6) technological lanes, 7) engineering facilities along the bypass and along roads crossing with the bypass, 8) land drainage system, including drainage devices of the road body: road ditches, rainwater sewerage, pre-treatment devices, retention tanks, and others, 9) environmental protection devices, in particular: acoustic protection, animal crossings, ecological culverts with a protective-guidance fence, greenery and bypass fence, anti-glare screens, 10) removal from the construction site and disposal of any identified plants that are invasive alien species, 11) removal from the construction site and disposal of waste identified in the previously developed documentation, 12) infrastructure for facilities located along the bypass, including: power supply and lighting networks, sewage treatment networks and equipment, rainwater sewerage including pre-treatment equipment and others, 13) reconstruction of conflicting equipment and networks of existing infrastructure under and above ground: telecommunications and energy equipment, water supply networks, rainwater and sewage drainage, drainage and hydrological equipment, others, 14) demolition of buildings, demolition of road elements, culverts and others, 15) telecommunications network for the needs of the Contracting Authority, 16) road lighting, 17) traffic organisation, including road safety equipment, 18) cleaning and evacuation of existing drainage equipment and receivers to the extent ensuring effective drainage of water from the road lane, 19) after the completion of the Works, perform full rehabilitation of the areas occupied by technical and social facilities, the Construction Square, temporary roads - made for the needs of the Contractor and construction and any other areas transformed by the Contractor, 20) perform repairs in the field of restoring roads, real estate used by the Contractor, or buildings damaged as a result of the Contractor's activities to the technical condition not worse than before the start of construction, 21) resuming or establishing or separating the boundaries of road lanes built as part of the investment, located in the lines demarcating the investment, taking into account their designed category, 22) any works resulting from the need to connect a section to the existing communication system together with its possible reconstruction and change in traffic organization resulting from the adopted solutions, 23) Traffic Management System, 24) strengthening the ground substrate and ensuring stability of trench slopes and embankments to the extent adapted to ground and water conditions, taking into account: - properties of land, rocks and materials, including anthropogenic materials (uncontrolled embankments); - anticipated impacts that may be applied loads (to be assumed from vehicles
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (319 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to Budimex S.A.n = 319
- 33% of this buyer's awards went to companies that had already won here before (1,302 awards since 2015, spread over 737 companies). 67% went to new names.n = 1,302 awards since 2015
- The median procedure drew 4 bids (967 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 967
- The award came in at a median 85% of the estimated value (116 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 116
- 5% of awards went to companies from abroad (1,302 awards with a known winner country). Sector average: 0%.n = 1,302
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.
What you must prove — eligibility criteria
Średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „Przychód netto ze sprzedaży produktów, towarów i materiałów” lub „Przychód netto ze sprze… read in fullcollapse
Posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 8 000 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych „środków finansowych/zdolności kredyto… read in fullcollapse
Wykonawca musi wykazać się wiedzą i doświadczeniem, w wykonaniu (zakończeniu) w okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, co najmniej: a) 1 zadania polegającego na budo… read in fullcollapse
Wykonawca musi wskazać osobę, która będzie uczestniczyć w wykonywaniu zamówienia, legitymującą się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jaka zostanie jej powierzona. Wykonawca, na funkcję wymienioną poniżej, wskaże osobę, którą m… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ZABERD Sp. z o.o. | 18 | 2024–2026 |
| Budimex S.A. | 17 | 2023–2026 |
| ELEKTROTIM S.A. | 14 | 2022–2024 |
| KM MANAGEMENT GROUP sp. z o.o. | 11 | 2024–2026 |
| InQubator Sp. z o.o. | 11 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 146 completed awards — not a statement about this procedure.)
This procedure allows 37 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now