How to bid in this country: portals, deadlines, thresholds →
Execution of planned overhauls of medium-sized and large-scale milling units of EP650-137 K2-K7 boilers, divided into packages: Package A – overhauls of mill installations, Package B – overhauls of fuel feeder installations, Package C – overhauls of mill fans.
Wykonanie planowanych remontów średnich oraz kapitalnych zespołów młynowych kotłów EP650-137 K2-K7 w podziale na pakiety: Pakiet A – remonty instalacji młynów, Pakiet B – remonty instalacji podajników paliwa, Pakiet C – remonty wentylatorów młynowych. — original title
Your path to submission
- Deadline: 12 November at 12:00 — 11 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Execution of planned repairs of medium-sized and large-scale milling units of EP650-137 K2-K7 boilers, divided into packages: Package A – overhauls of mill installations, Package B – overhauls of fuel feeder installations, Package C – overhauls of mill fans. · PACKAGE A – Repairs of mill installations · Package B – repairs of fuel feeder installations · Package C – repairs of mill fans.
Contract
Type of service
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (9 awards since 2026, spread over 4 companies). That is well below the sector norm (45%) — this buyer switches suppliers more often than others.n = 9 awards since 2026
- The median procedure drew just one bid (9 procedures with a bid count); 78% ended with a single bidder. Sector: median 2 bids.n = 9
- 58% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 86%.n = 9
- 8% of the bids received came from other countries (9 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 9
- Across 30 procedures with structured selection criteria, this buyer most often required: References: services (10 of 30), References: works (9 of 30), Technical staff for quality control (9 of 30), Minimum number of managers (9 of 30).n = 30
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Nano Co., Ltd. | 1 | 2026 |
| Elporem i Elpoautomatyka Sp. z o.o. | 1 | 2026 |
| Elpologistyka Sp. z o.o. | 1 | 2026 |
| GRUPA AZOTY ZAKŁADY AZOTOWE PUŁAWY S.A. | 1 | 2026 |
Tactics
When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 8,481 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Poland · Repair & maintenance, 356 contracts went to foreign companies over the last 3 years (of 31,423 recorded awards) — mostly from Germany, France, Italy.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now