Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Execution of planned overhauls of medium-sized and large-scale milling units of EP650-137 K2-K7 boilers, divided into packages: Package A – overhauls of mill installations, Package B – overhauls of fuel feeder installations, Package C – overhauls of mill fans.

Wykonanie planowanych remontów średnich oraz kapitalnych zespołów młynowych kotłów EP650-137 K2-K7 w podziale na pakiety: Pakiet A – remonty instalacji młynów, Pakiet B – remonty instalacji podajników paliwa, Pakiet C – remonty wentylatorów młynowych. — original title

PLPoland · Magdalena Wawrzkiewicz

Your path to submission

  1. Deadline: 12 November at 12:00 — 11 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Polish.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Execution of planned repairs of medium-sized and large-scale milling units of EP650-137 K2-K7 boilers, divided into packages: Package A – overhauls of mill installations, Package B – overhauls of fuel feeder installations, Package C – overhauls of mill fans. · PACKAGE A – Repairs of mill installations · Package B – repairs of fuel feeder installations · Package C – repairs of mill fans.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuevalue not published
Published9 Oct 2026
ProcedureOpen procedure
3 lots

Type of service

50 · Repair & maintenance
CPV 50531100

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (9 awards since 2026, spread over 4 companies). That is well below the sector norm (45%) — this buyer switches suppliers more often than others.n = 9 awards since 2026
  • The median procedure drew just one bid (9 procedures with a bid count); 78% ended with a single bidder. Sector: median 2 bids.n = 9
  • 58% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 86%.n = 9
  • 8% of the bids received came from other countries (9 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 9
  • Across 30 procedures with structured selection criteria, this buyer most often required: References: services (10 of 30), References: works (9 of 30), Technical staff for quality control (9 of 30), Minimum number of managers (9 of 30).n = 30

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In comparable contracts in this sector nationwide (8,481 with a known bid count), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

What you must prove — eligibility criteria

›
Other economic requirement
opisano w SWZ
›
Other economic requirement
opisano w SWZ
›
Other economic requirement
opisano w SWZ
›
Security/guarantee required
Requirement texts are quoted in the notice's original language — only the official wording is binding.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Nano Co., Ltd.12026
Elporem i Elpoautomatyka Sp. z o.o.12026
Elpologistyka Sp. z o.o.12026
GRUPA AZOTY ZAKŁADY AZOTOWE PUŁAWY S.A.12026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Thursday 12 November at 12:00

Tactics

When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 8,481 completed awards — not a statement about this procedure.)

This procedure allows 35 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Poland · Repair & maintenance, 356 contracts went to foreign companies over the last 3 years (of 31,423 recorded awards) — mostly from Germany, France, Italy.

Submission language: Polish.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Polish
The 3 criteria on the left, plus your price.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now