How to bid in this country: portals, deadlines, thresholds →
Major maintenance, repairs, improvements and minor alterations to the buildings and colleges of the Department of Aude
Travaux de gros entretien, réparations, améliorations et transformations mineures des bâtiments et des collèges du Département de l'Aude — original title
Your path to submission
- Deadline: 17 November at 16:00 — 16 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Major maintenance, repairs, improvements and minor alterations to buildings and colleges in the Aude Department · Lot 1 - Zone 1 - Structural works · Lot 2 - Zone 1 - Plasterwork, drywall, false ceilings, insulation · Lot 3 - Zone 1 - Exterior and interior wood joinery, hardware · Lot 4 - Zone 1 - Aluminium joinery, PVC joinery, mirrorwork, glassware · Lot 5 - Zone 1 - Metallic works, locksmithing · Lot 6 - Zone 1 - Plumbing, gas, sanitary, zinc, heating, ventilation, air conditioning · Lot 7 - Zone 1 - Electricity, high currents · Lot 8 - Zone 1 - Painting, flexible floor coverings, ITE
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 4 bids (6 procedures with a bid count); 0% ended with a single bidder. Sector: median 6 bids.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SSP MEDITERRANEE | 1 | 2026 |
Tactics
When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 42,545 completed awards — not a statement about this procedure.)
This procedure allows 42 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now