How to bid in this country: portals, deadlines, thresholds →
Construction of the Pyrzyce bypass along provincial road No 119
Budowa obejścia m. Pyrzyce w ciągu drogi wojewódzkiej nr 119 — original title
Your path to submission
- Deadline: 10 November at 10:00 — 9 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the construction of a workaround for the town of Pyrzyce along provincial road No 119. This task is to be co-financed by the Government Road Development Fund: CIRCULAR PROGRAMME. 2. The scope of the task includes the construction of a bypass of the town of Pyrzyce along provincial road No 119 on the western side of the city, which will provide communication between DW106, DW119, DP 1588Z, DW122 and DW119. The construction of the above-mentioned road with a length of about 7.5 km along with lighting, a technological channel and engineering facilities is aimed at improving the safety of all users, traffic conditions (liquidity, throughput) and reducing the negative impact of car traffic on the environment (noise, pollution level) in the town of Pyrzyce. The construction of the bypass will improve the accessibility of adjacent areas and enable the…
Show full description
… development of local investments that require efficient and trouble-free access. The new road will provide more efficient bus connections and improve the safety of using this communication. 3. The scope of construction works includes: 1) felling of trees and bushes 2) demolition works 3) construction of a bypass 4) construction of additional roads 5) construction of a road for pedestrians and bicycles 6) construction of bridge facilities 7) construction of a railway crossing 8) construction and reconstruction of culverts 9) construction of acoustic screens 10) construction of road lighting 11) liquidation of power collisions 12) liquidation of gas collisions 13) liquidation of telecommunications collisions 14) construction of a technological channel 15) swinging with grass seeding 16) compensatory plantings 17) construction of BRD devices, horizontal and vertical markings. 4. The subject of the contract is described in detail in the Design Documentation, SST, Chapter C of the Terms of Reference and Valuable Works Quantities. 5. The contracting authority shall provide for the possibility of awarding similar contracts, i.e. direct contracts referred to in Article 214(1)(b) CTMR. 1(7) of the Public Procurement Act. 1) The value of the works is determined up to the amount of PLN 17 326 000.00 net, with the scope consistent with the subject of the basic contract, consisting in the repetition of similar works. 2) The basis for determining the terms of a similar order is the basic contract and negotiations with the Contractor. 6. Pursuant to Art. 1 of the Act, the Ordering Party requires employment by the Contractor or Subcontractor(s) on the basis of the employment relationship of all persons performing the activities indicated by the Ordering Party, in the scope of performance of the contract, i.e.: 1) preparatory works, earthworks, construction of road surface and road elements, finishing works, installation of traffic safety devices, execution of vertical and horizontal markings, 2) works in the field of bridge, sanitary, telecommunication, power and railway industries. 7. The Contracting Authority's powers regarding the method of verification and control of compliance with the obligation referred to in point 6 are specified in § 5 sec. 3 point 9) and § 9 sec. 7 of the draft agreement. 8. The Contractor shall be required to perform the subject matter of the contract using ICT products, ICT services and ICT processes for which no recommendation as referred to in Article 33(1)(b) CTMR has been issued. 4 of the Act of 5 July 2018 on the national cybersecurity system, stating their negative impact on the basic security interest of the state, or a decision or other act in connection with which a given ICT product, ICT service or specific ICT process should be withdrawn from use. · 1. The scope of construction works includes: 1) felling of trees and bushes 2) demolition works 3) construction of a bypass 4) construction of additional roads 5) construction of a road for pedestrians and bicycles 6) construction of bridge facilities 7) construction of a railway crossing 8) construction and reconstruction of culverts 9) construction of acoustic screens 10) construction of road lighting 11) liquidation of power collisions 12) liquidation of gas collisions 13) liquidation of telecommunications collisions 14) construction of a technological channel
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (18 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to MALDROBUD Sp. z o. o. Sp. K.n = 18
- 27% of this buyer's awards went to companies that had already won here before (269 awards since 2021, spread over 193 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 269 awards since 2021
- The median procedure drew 6 bids (36 procedures with a bid count); 3% ended with a single bidder. Sector: median 5 bids.n = 36
- The award came in at a median 93% of the estimated value (32 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 32
- 73% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 84%.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| 2 EVENT Sp. z o.o. | 13 | 2022–2026 |
| BUTTERFLY GADŻETY REKLAMOWE Agnieszka Borowy | 6 | 2022–2026 |
| SYMETRIA Sp. z o.o. | 4 | 2025–2026 |
| Sun&More | 4 | 2023–2025 |
| WT PRINT Tomasz Walburg | 4 | 2023–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually 8 or more bids came in. Many compete here — price and references decide. (Based on 10 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now