How to bid in this country: portals, deadlines, thresholds →
Supply and delivery of the major components of 7 vacuum loudspeakers for the CNRS LOA
Fourniture et livraison des éléments majeurs de 7 enceintes à vide pour le LOA du CNRS — original title
Your path to submission
- Deadline: 16 November at 12:00 — 15 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The contract is concluded at an all-inclusive price for all the services to be performed and described in the contract documents. The services shall include at least (description of the steps to be included in the CCTP): - The start of manufacturing; - Factory testing; - Cleaning; - Packaging; - Delivery. The detailed description of the services and their technical and functional specifications is set out in the Specific Technical Specifications (STS).
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (3 awards, most recently August 2025) — by that rhythm the next award was due around December 2025. The last award went to VINCI TECHNOLOGIES.n = 3
- 38% of the bids received came from other countries (7 procedures with a bid mix) — all bidders, not just the winners. Sector: 4%.n = 7
- 38% of awards went to companies from abroad (37 awards with a known winner country). Sector average: 9%.n = 37
- 6% of this buyer's awards went to companies that had already won here before (37 awards since 2024, spread over 35 companies). That is well below the sector norm (24%) — this buyer switches suppliers more often than others.n = 37 awards since 2024
- The median procedure drew just one bid (37 procedures with a bid count); 62% ended with a single bidder. Sector: median 3 bids.n = 37
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SAFRAN REOSC | 2 | 2024–2025 |
| AET TECHNOLOGIES | 2 | 2025–2026 |
| UNIIVO SAS | 1 | 2026 |
| Air Liquide Advanced Technologies · Paris | 1 | 2025 |
| TOKYO DENKAI CO LTD | 1 | 2024 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 42 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In France · Industrial machinery, 82 contracts went to foreign companies over the last 3 years (of 1,068 recorded awards) — mostly from Germany, Italy, Spain.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now