How to bid in this country: portals, deadlines, thresholds →
Execution of works, site organisation and equipment/machinery required under the project ‘Modernisation and rehabilitation of the ‘Ștefan cel Mare’ National Pedagogical College Bacău’, code SMIS 356166, financed through the 2021-2027 PRNE
Execuție lucrări, organizare de șantier și echipamente/utilaje necesare în cadrul proiectului «Modernizare și reabilitare Colegiul Național Pedagogic „Ștefan cel Mare” Bacău», cod SMIS 356166, finanțat prin PRNE 2021-2027 — original title
Your path to submission
- Deadline: 2 November at 15:00 — 1 day left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Offer and evidence in: Romanian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject matter of the contract resulting from this procedure is the execution of all the works identified in the tender documentation : specifications and the Technical Design submitted as an annex to the documentation and includes: 1. ARCHITECTURE WORKS, 2. STRUCTURE WORKS, 3. ELECTRICAL INSTALLATION WORKS (weak currents, external networks/branments), 4. THERMAL INSTALLATION WORKS (interior, ventilation, central heating, external thermal networks), 5. HEALTH INSTALLATION WORKS (indoors, water and sewage networks, hydrants), 6. EQUIPMENT MONITORING WORKS. The aim of the project is to increase energy efficiency and reduce greenhouse gas emissions in public buildings of the "Ștefan cel Mare" National Pedagogical College in Bacău. To achieve this goal, the project provides for the implementation of an integrated package of in-depth energy rehabilitation measures, the use of renewable…
Show full description
… energy sources and the modernization of educational infrastructure, aimed at: - thermal rehabilitation of the tire and building elements; - modernization of thermal, ventilation, air conditioning and lighting installations; - installation of a photovoltaic panel system for the production of energy from renewable sources; - applying measures to increase the safety, comfort and accessibility of educational spaces; - the use of materials and technologies with low environmental impact, in accordance with the DNSH (Do No Significant Harm) principle. By implementing these measures, the project contributes directly to Specific Objective RSO2.1 – Promoting energy efficiency and reducing greenhouse gas emissions, under Priority 3 – A region with environmentally friendly localities, financed by the European Regional Development Fund (ERDF), within the operation "Investments in public buildings to increase energy efficiency". The implementation of the project supports the transition to a low-carbon economy, improves the quality of the built environment and contributes to the creation of modern, efficient and sustainable educational spaces for the benefit of the local community. The deadline for the execution of the works is 30 months from the date mentioned in the start order. The minimum guarantee for the execution of the works is 5 years (60 months) from the date of reception at the end of the work, cf. Art. 7 para. (3) of Law 10/1995 (the constructions fall under categ. B of importance). The offer of a guarantee period for the execution of works of less than 5 years, the offer will be considered non-compliant. The guarantee of the equipment (required in the technical sheets F5) will be correlated/equal to the guarantee of the tendered works, respectively at least 60 months from the reception at the end of the works. If an equipment warranty period of less than 5 years is offered, the offer will be considered non-compliant. If a guarantee of additional works (over 60 months - maximum 84 months) is offered, the guarantee of the equipment included in the works must be the same as that of the works. · The procurement of works has two main components: 1. Execution of related works and endowments (related measures) This activity includes the following types of works: A. Consolidation and compliance work. In order to ensure structural stability and increase the degree of seismic safety – the classification in RS IV of the C1 body and in RS III of the C8 body will be carried out intervention works on infrastructure and superstructure: B. Interventions for fire safety and compliance with regulations • Compliance with vertical and horizontal escape routes: protection of gaps and proper separation of movements. • Complete installation of fire protection equipment: detection, signalling and warning, indoor and outdoor hydrants, security lighting, lightning protection. • Compensatory measures for non-compliance with distances from neighborhoods. C. Restoration work and c
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (30 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to GAMSERV Cons SRL.n = 30
- 36% of this buyer's awards went to companies that had already won here before (184 awards since 2020, spread over 67 companies). That is well below the sector norm (59%) — this buyer switches suppliers more often than others.n = 184 awards since 2020
- The median procedure drew 3 bids (158 procedures with a bid count); 15% ended with a single bidder. Sector: median 5 bids.n = 158
- 7% of awards went to companies from abroad (184 awards with a known winner country). Sector average: 0%.n = 184
- 75% of the bids received came from small and medium-sized enterprises (117 procedures with a bid mix). Sector: 65%.n = 117
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Obiectul contractului trebuie sa aiba corespondent în codul CAEN din Certificatul Constatator emis de ONRC, iar ofertantul/subcontractantii nu se află în niciuna dintre situațiile de anulare a constituirii sale, precum și faptul că are capacitatea profesională… read in fullcollapse
Cerinta 1 Cifra de afaceri medie anuala Ofertantii vor prezenta media cifrei de afaceri globala pe ultimele 3 exerciții financiare disponibile (2023, 2024, 2025) care trebuie sa fie cel puțin egală cu 22.000.000,00 lei . Ofertantul trebuie să dovedească faptul… read in fullcollapse
Cerinta 2: Lichiditatea anuală Ofertantul trebuie să demonstreze că are o lichiditate anuală mai mare sau egală cu 100%, la data de 31 decembrie 2025. Pentru calculul lichidității anuale ( Lan )se va utiliza formula: Lan = Active circulante/ Datorii curente, i… read in fullcollapse
Ofertantii vor prezenta lista principalelor lucrări realizate in ultimii 5 ani, (retroactiv de la data-limită a depunerii ofertelor și în cazul decalării termenului de depunere al ofertelor, perioada pentru care se solicită experiența similară se va extinde cu… read in fullcollapse
Ofertantul are obligatia de a preciza categoriile de servicii/lucrări din contract pe care intenţionează să le subcontracteze, precum şi procentul activităţilor indicate în ofertă ca fiind realizate de către subcontractanţi si datele de recunoastere ale subcon… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| MILENNIUM S.R.L. | 10 | 2024–2026 |
| GARDEN CENTER GRUP S.R.L. | 7 | 2024–2026 |
| O.M.B. PRODUCTION SRL | 7 | 2024–2026 |
| PAUL FLOWERS S.R.L. | 6 | 2024–2026 |
| BVA SERVICII | 5 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 28 completed awards — not a statement about this procedure.)
This procedure allows 29 days between publication and deadline — typical in this country is 33 (median of 2,802 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Romania · Construction work, 167 contracts went to foreign companies over the last 3 years (of 84,629 recorded awards) — mostly from France, Italy, Germany.
Submission language: Romanian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now