Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Espoon Asunnot Oy / Vermonpolku 3 new building KVR contract

Espoon Asunnot Oy / Vermonpolku 3 uudisrakennus KVR-urakka — original title

FIFinland · Espoo

Your path to submission

  1. Deadline: 26 November at 14:00 — 25 days left.
  2. You submit on Hilma — not here and not by e-mail. ↗
  3. Offer and evidence in: Finnish.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The acquisition includes the realisation of the Varke interest-subsidised rental building project as a KVR contract on plot 49-51-116-9, including planning in accordance with Espoon Asunnot Oy's planning guidelines. The address is Vermonpolku 3, Espoo. The property consists of one 3-storey locker house and three 2-storey terraced houses with household buildings and courtyards. The parking spaces will be placed on the plot as ground-level parking as part of the contract. The total building right allowed by the plan is 2600 k-m2, divided into blocks of flats (1300 k-m2) and terraced houses (total 1300 k-m2). The total area of dwellings according to the target spatial plan is 2228.5 m2 and the number of dwellings is 45, which means that the number of parking spaces is 24.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published5 Oct 2026
ProcedureOpen procedure
Place of performanceEspoo
Reserved for SMEs

Type of service

45 · Construction work
CPV 45211340

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (58 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to Argentum Oy.n = 58
  • 23% of this buyer's awards went to companies that had already won here before (274 awards since 2017, spread over 180 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 274 awards since 2017
  • The median procedure drew 8 bids (216 procedures with a bid count); 3% ended with a single bidder. Sector: median 4 bids.n = 216
  • The award came in at a median 84% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 24
  • Across 7 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (4 of 7), Minimum turnover in the contract field (3 of 7), Minimum annual turnover (1 of 7).n = 7

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
TNRak Oy62021–2022
Rakennusliike SoiMu oy52024–2026
Lujatalo Oy · KUOPIO52018–2020
A-Insinöörit Suunnittelu Oy52021–2024
Jalon Uusimaa Oy42024–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

33
2020
32
2021
20
2022
28
2023
46
2024
55
2025
52
2026
266 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 26 November at 14:00

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 32 completed awards — not a statement about this procedure.)

This procedure allows 53 days between publication and deadline — typical in this country is 32 (median of 1,471 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,931 recorded awards).

Submission language: Finnish.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
Bids are submitted on Hilma — TED carries the same notice, usually with the more detailed specification. Read both.
TEDNoticeHilmaSubmission portal
Put together the evidence — in Finnish
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now