Budowa lewego wału rzeki Biała w km rzeki 6+600-8+345 os. Koszyce, m. Tarnów – etap III roboty budowlane
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 9 October at 10:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (1806 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to KOLANKIEWICZ ADAM, P.H.U. Esperton Kolankiewicz Adam.n = 1,806
- 51% of this buyer's awards went to companies that had already won here before (8,943 awards since 2018, spread over 2,811 companies). 49% went to new names.n = 8,943 awards since 2018
- The median procedure drew 4 bids (5,319 procedures with a bid count); 18% ended with a single bidder. Sector: median 5 bids.n = 5,319
- The award came in at a median 69% of the estimated value (441 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 441
- 98% of the bids received came from small and medium-sized enterprises (1,862 procedures with a bid mix). Sector: 84%.n = 1,862
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 7 (from 27 awards).
What the buyer is looking for
The contract includes the execution of construction works consisting in the construction of a left-hand embankment of the Biała River in the area of the Koszyce housing estate in the form of a embankment and a reinforced concrete boulevard/wall along with the construction of objects functionally related to the flood protection structure such as: shaft culverts, technological roads with squares, shaft crossings and collision reconstructions. The embankment will consist of the main sections: • from km 0+000 to km 0+910 – earth embankment • from km 0+910 to km 1+256 – reinforced concrete wall • from km 1+256 to km 1+703 – earth embankment The total length of the embankment will be 1,703 km · A. Description of the construction works: 1. Construction of a left-sided embankment of the Biała River in the area of the Koszyce housing estate in the form of a embankment and a reinforced concrete…
Show full description
… boulevard/wall along with the construction of objects functionally related to the flood protection structure such as: shaft culverts, escalator stairs and drainage at the foot of the ventilator a) The construction of the earth shaft will consist of: - construction of a flood embankment up to a height of 5.5 m, total length of 1357 m, crown width of 4.0 m - construction of a shelf on an escarpment at a section in km 1+270 – 1+690 - construction of a strengthening of the water escarpment with biotextile laid on a layer of fertile soil of 15 cm with a covering with a humus gr. 5 cm - construction of a strengthening of the water escarpment in the form of mesh mattresses – stone gr. 30 cm on geotextiles - construction of a strengthening of the air escarpment by sparkling and sowing the grass mixture - construction of a strengthening of the air escarpment in the form of mesh mattresses – stone gr. 30 cm on geotextile - execution of a sealing of the shaft body with geomembrane arranged from the side of the water escarpment shaft + sealing of the substrate with a cement-benite barrier in the CDMM technology on the head. 4.5 m (except for sections where there are land weapon networks and shaft and dry culverts where the sealing of the substrate will be made using the jet-grouting method - laying a net protecting the shaft against the possibility of digging by animals. The net will be made on a galvanized steel wire drainage slope with a diameter of at least 2.5 mm and mesh sizes of 5x5 cm with the attachment of steel pins with a length of at least 30 cm. b) The construction of the boulevard/wall will consist in the construction of a reinforced concrete monolithic structure with expansion joints protected by stone cladding for a total length of 346 m. c) Execution of objects functionally related to the construction of the shaft: - Dry penetrations – 3 pieces – made of pipelines with a diameter of 600 mm. Inlet and outlet secured with prefabricated reinforced concrete docks. Before the inlet and after the outlet, the fortification of the area was designed with a stone overhead of 20 cm. A rare grille will be mounted on the inlet dock. A manoeuvrable flap shall be fitted on the outlet dock. - Reconstruction of a road ditch through the construction of a culvert and fortifications – 1 unit - Partial liquidation of the ditch bed and construction of a new section of the ditch together with the construction of a shaft culvert – 1 pcs. - Shaft crossings – 3 - construction of shaft crossings: full road plates with a width of 3.0 m + shoulders 2x0.5 m, except for the passage in km 1+695 where the pavement made of asphalt concrete was designed. - Manoeuvring yards – 6 units - Maneuvering yards shall be constructed at the ends of roads and at sensitive locations to allow safe operation of the shaft both under normal and flood conditions. - Technological roads with a total length of 1275 m - Road construction: 3 cm gravel surface on a 15 cm geogrid base filled with gravel on geotextile and compacted substrate. The width of the roadway is 3.0 m. The construction of the pavement will be laid between the concrete edges. - Slope stairs - in 8 locations - Stairs made of prefabricated elements adapted to the slope of the shaft. + removal of stairs (in two locations) - Linear drainage at the vent slope along the shaft and boulevard in the form of concrete trays and stone drainage with drainage outlets 2. Strengthening of the Bi river escarpment
What you must prove — eligibility criteria
Warunek udziału w zakresie sytuacji ekonomicznej i finansowej zostanie spełniony, jeżeli Wykonawca wykaże, że posiada środki finansowe lub zdolność kredytową w wysokości nie mniejszej niż 2 000 000,00 zł (słownie: dwa miliony zł). Na potwierdzenie spełnienia w… ▸▾
Warunek ten zostanie spełniony, jeżeli Wykonawca wykaże, że wykonał w ciągu ostatnich 15 lat przed upływem terminu składania ofert w postępowaniu, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, dwie (2) roboty budowlane o wartości nie mn… ▸▾
Warunek w zakresie wymaganego personelu zostanie spełniony, jeśli Wykonawca wykaże, że dysponuje lub będzie dysponować w okresie wykonywania zamówienia i skieruje do jego realizacji następujące osoby: a) w charakterze Kierownika budowy osobę posiadającą uprawn… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DREW-KOS Sp. Z o.o. | 71 | 2024–2026 |
| Hydrowodkan Sp. z o.o. | 60 | 2018–2026 |
| METALZBYT-HURT SP. Z O.O. | 56 | 2020–2026 |
| ATRA Sp. z o.o. | 50 | 2022–2026 |
| PBW INŻYNIERIA Sp. z o. o. | 39 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.